HomeMy WebLinkAboutSolar permit summary, plan and final inspectionPROJECT INFOSHEET NUMBERSCALESTACEY WILSON2380 WATERTOWN RDLONG LAKE, MN 55356SHEET NAMEDATE3.5.2024POWERFULLY GREEN2010 E HENNEPIN AVE.,MINNEAPOLIS, MN 55413COVER PAGENTSAPPLICABLE CODES & STANDARDSSTRUCTURAL CRITERIA1.WIND EXPOSURE CATEGORY: C2.WIND SPEED: 109.0 MPH3.GROUND SNOW LOAD: 50.0 PSF10.78 KW DC & 7.6 KW AC PV SOLAR ARRAYPV MODULES - 28 JINKO SOLAR JKM385M-6RL3-BINVERTER(S) - 1 GENERAC PWRCELL 7.6KW XVT076A03ROOF TYPE - ASPHALT SHINGLESRACKING - SNAPNRACK UR-40ATTACHMENT - SNAPNRACK ULTRA RAIL SPEEDSEAL FOOTGOVERNING CODES1.ALL WORK SHALL COMPLY WITH:1.1.2017 NATIONAL ELECTRICAL CODE1.2.2018 INTERNATIONAL BUILDING CODE1.3.2018 INTERNATIONAL FIRE CODE1.4.2018 INTERNATIONAL RESIDENTIAL CODE1.5.2018 INTERNATIONAL EXISTING BUILDING CODE1.6.AND ALL OTHER STATE AND LOCAL AMENDMENTSTO BUILDING AND ELECTRICAL CODESXCEL ENERGY MN NOTES1.24/7, UNESCORTED, KEYLESS ACCESS SHALL BE PROVIDED TO ALL XCEL EQUIPMENT.2.THERE ARE NO NESC CLEARANCE CONCERNS IN RELATION TO XCEL OWNED FACILITIES.3.THE UTILITY AC DISCONNECT SHALL BE LOCATED IN A READILY ACCESSIBLE LOCATION WITHIN 10' OF THEMAIN SERVICE METER.4.PHASES OF DER SYSTEM BASED ON THE INVERTER OUTPUT (1-PHASE 3-WIRE).5.ALL REQUIRED ELECTRICAL LABELS ARE SHOWN ON PV-56.A PLACARD IS REQUIRED AT THE MAIN BILLING METER WITH YELLOW & BLACK LETTERING STATING,"PHOTOVOLTAIC SYSTEM CONNECTED." (ALSO SHOWN ON PV-5).UTIL - XCEL ENERGY MNAHJ - ORONO (CITY)OCCUPANCY - IICONSTRUCTION - SFRZONING - RESIDENTIALSCOPE OF WORKINSTALLATION OF ROOF-MOUNTED UTILITY INTERACTIVE PV SYSTEMGENERAL NOTES1.THIS PROJECT INVOLVES THE INSTALLATION OF A GRID-INTERACTIVE PV SYSTEM. PV MODULES WILL BEMOUNTED USING A PRE-ENGINEERED MOUNTING SYSTEM. THE MODULES WILL BE ELECTRICALLY CONNECTED TOTHE LOCAL UTILITY USING MEANS AND METHODS CONSISTENT WITH THE RULES ENFORCED BY THE LOCALUTILITY AND AUTHORITY HAVING JURISDICTION.2.THIS DOCUMENT HAS BEEN PREPARED TO DESCRIBE THE DESIGN OF A PROPOSED PV SYSTEM WITH ENOUGHDETAIL TO DEMONSTRATE COMPLIANCE WITH APPLICABLE CODES AND REGULATIONS. THE DOCUMENT SHALLNOT BE RELIED UPON AS A SUBSTITUTE FOR FOLLOWING MANUFACTURER INSTALLATION INSTRUCTIONS. THESYSTEM SHALL COMPLY WITH ALL MANUFACTURER INSTALLATION INSTRUCTIONS, AS WELL AS ALL APPLICABLECODES. NOTHING IN THIS DOCUMENT SHALL BE INTERPRETED IN A WAY THAT OVERRIDES THEM. THECONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF ALL DETAILS IN THIS DOCUMENT.3.THIS DOCUMENT IS BASED ON FIELD INSPECTIONS AND OTHER INFORMATION AVAILABLE AT THE TIME. ACTUALFIELD CONDITIONS MAY VARY AND REQUIRE MODIFICATIONS IN CONSTRUCTION DETAILS.4.THE DIMENSIONS AND MEASUREMENTS SHOWN IN THIS DOCUMENT ARE BASED ON AERIAL IMAGERY AND OTHERAVAILABLE INFORMATION, AND ARE TO BE TREATED AS APPROXIMATED TO SHOW A GENERAL IDEA OFEQUIPMENT LOCATION AND PROPERTY SIZE.5.ANY CHANGES TO THIS DESIGN AT THE TIME OF INSTALLATION DUE TO FIELD CONDITIONS MUST BE REPORTEDTO THE DESIGNER AND AHJ.SHEET INDEXPV-1 COVER PAGEPV-2 SITE PLANPV-2AROOF PLANPV-3 ATTACHMENT DETAILSPV-4 THREE LINE DIAGRAMPV-5 ELECTRICAL LABELSPV-5A SITE PHOTOSPV-6+ SPEC SHEETSELECTRICAL NOTES1.ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR ITS APPLICATION2.ALL RACEWAYS ON ROOFTOPS SHALL BE PLACED MORE THAN 7/8" ABOVE THE ROOFTOP. ALLCONDUCTORS SHALL BE COPPER, RATED FOR 600V AND 90°C WET ENVIRONMENT3.WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY TO, ANDLOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY4.WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITHNEC 110.265.DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS6.CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS, SUPPORTS, FITTINGS, AND ACCESSORIES TOFULFILL APPLICABLE CODES AND STANDARDS7.WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUCTORS ARE NOT SPECIFIED, THECONTRACTOR SHALL SIZE THEM ACCORDINGLY8.ARRAY GROUNDING TO BE INSTALLED PER RACKING MANUFACTURER'S INSTRUCTION9.ARRAY RACKING TO BE BONDED WITH CONTINUOUS COPPER E.G.C. VIA WEEB LUG OR ILSCO GBL-4DBTLAY-IN LUG10.THE POLARITY OF THE GROUNDED CONDUCTORS IS NEGATIVE.11.SURGE PROTECTION REQUIRED PER NEC 230.67PV-1AERIAL VIEWReviewed for Code ComplianceNicole PostSES24-0000013-7-24Additional permits required:ElectricalStamped and approvedplans must be on site forthe duration of the projectand all inspections.To schedule inspections call: 952-249-4613Please have the permit number andstreet address ready at time of call.
XCEL MN NOTES1.24/7, UNESCORTED, KEYLESS ACCESS SHALL BE PROVIDEDTO ALL XCEL EQUIPMENT.2.THERE ARE NO NESC CLEARANCE CONCERNS IN RELATIONTO XCEL OWNED FACILITIES.3.THE UTILITY AC DISCONNECT SHALL BE LOCATED IN AREADILY ACCESSIBLE LOCATION WITHIN 10' OF THE MAINSERVICE METER.4.PHASES OF DER SYSTEM BASED ON THE INVERTER OUTPUT(1-PHASE 3-WIRE).5.ALL REQUIRED ELECTRICAL LABELS ARE SHOWN ON PV-56.A PLACARD IS REQUIRED AT THE MAIN BILLING METER WITHYELLOW & BLACK LETTERING STATING, "PHOTOVOLTAICSYSTEM CONNECTED." (ALSO SHOWN ON PV-5).(N) GENERAC PWRCELL 7.6KW XVT076A03INVERTER(E) MAIN SERVICE PANEL (INTERIOR)(N) AC DISCONNECT(E) UTILITY METER(N) JINKO SOLAR JKM385M-6RL3-B MODULE(N) PRODUCTION METERPV-2PROJECT INFOSHEET NUMBERSCALESTACEY WILSON2380 WATERTOWN RDLONG LAKE, MN 55356SHEET NAMEDATE3.5.2024POWERFULLY GREEN2010 E HENNEPIN AVE.,MINNEAPOLIS, MN 55413SITE PLAN5/128" = 1' - FIRE SETBACKWATERTOWN RDWILLOW DR N
298'-7"221'-1"183'-5"96'-5"176'-5"33'-10"95'-3"
54'-8"
PROJECT INFOSHEET NUMBERSCALESTACEY WILSON2380 WATERTOWN RDLONG LAKE, MN 55356SHEET NAMEDATE3.5.2024POWERFULLY GREEN2010 E HENNEPIN AVE.,MINNEAPOLIS, MN 55413ROOF PLAN(N) SNAPNRACK ULTRA RAILSPEEDSEAL FOOTMOUNTING POINT (STAGGERED)7/32" = 1'PV CIRCUITARRAY AZIMUTH(S):90, 270°ARRAY TILT(S): 25°ARRAY AREA:606.48 SQ. FT.ROOF AREA:700 SQ. FT.ARRAY COVERAGE:86.64%XCEL MN NOTES1.24/7, UNESCORTED, KEYLESS ACCESS SHALL BE PROVIDEDTO ALL XCEL EQUIPMENT.2.THERE ARE NO NESC CLEARANCE CONCERNS IN RELATIONTO XCEL OWNED FACILITIES.3.THE UTILITY AC DISCONNECT SHALL BE LOCATED IN AREADILY ACCESSIBLE LOCATION WITHIN 10' OF THE MAINSERVICE METER.4.PHASES OF DER SYSTEM BASED ON THE INVERTER OUTPUT(1-PHASE 3-WIRE).5.ALL REQUIRED ELECTRICAL LABELS ARE SHOWN ON PV-56.A PLACARD IS REQUIRED AT THE MAIN BILLING METER WITHYELLOW & BLACK LETTERING STATING, "PHOTOVOLTAICSYSTEM CONNECTED." (ALSO SHOWN ON PV-5).(N) SNAPNRACK UR-40RAILS (4' MAX SPAN)PV-2ROOF INFORMATIONROOFSECTIONPANELCOUNTROOF TILTAZIMUTH121414252590270Mar 05 2024
COMP SHINGLEROOF PITCH(1) 5/16" LAG SCREWSMIN. 2.5" EMBEDMENT INTO RAFTERPHOTOVOLTAICMODULERAFTERSNAPNRACK SPEEDSEAL FOOTATTACHMENTSNAPNRACK UR-40 RAILMODULE CLAMPPROJECT INFOSHEET NUMBERSCALESTACEY WILSON2380 WATERTOWN RDLONG LAKE, MN 55356SHEET NAMEDATE3.5.2024POWERFULLY GREEN2010 E HENNEPIN AVE.,MINNEAPOLIS, MN 55413ATTACHMENT DETAILSRACKING & STRUCTURAL INFORMATIONRACKING - SNAPNRACK UR-40ATTACHMENT - SNAPNRACK ULTRA RAILSPEEDSEAL FOOTROOF TYPE - ASPHALT SHINGLESSTRUCTURE INFO - RESIDENCERAFTER SIZE - ----RAFTER SPACING - 24NTSPV-3Mar 05 2024
40A FUSES(NEW)PV AC DISCONNECT1-PHASE 3-WIREFUSIBLE | 60A | 120/240V(VISIBLE-OPEN TYPE,LOCKABLE, & READILYACCESSIBLE)3/4" EMT(3) #6 THWN-2 CU(1) #10 THWN-2 CU (GND)(E) MAIN BREAKER200AFROM UTILITYNGM (E) MAIN SERVICE PANEL1-PHASE 3-WIRE200A | 120/240VXCEL MN UTILITY METER120/240V 1-PHASE 3-WIREREFERENCE POINT OF APPLICABILITY (RPA)SUPPLY/LINE SIDE TAP NEC 705.11M(NEW) XCEL MN1-PHASE 3-WIREPRODUCTION METERRING TYPE, 4-JAW, FORM 2S3/4" EMT(3) #8 THWN-2 CU(1) #10 THWN-2 CU (GND)(NEW)UTILITY AC DISCONNECT1-PHASE 3-WIRE60A | 120/240V(VISIBLE-OPEN TYPE,LOCKABLE, & READILYACCESSIBLE)G+-(N) GENERAC PWRCELL7.6KW XVT076A03ESS & PV INVERTERL1L2NG30AL1L2NG50AGG+-30A+-30A+-30APER CIRCUIT (3)#10 PV WIRE3/4"" EMT(3) #10 THWN-2(N) 28 JINKO SOLAR JKM385M-6RL3-B PV MODULES(N) GENERAC SNAPRSCIRCUIT 1: 9CIRCUIT 2: 9CIRCUIT 3: 10(N) J-BOXPER ARRAY#6 BARE CU EGC(N) GENERAC PWRCELL PV LINK APKE00010POWER OPTIMIZER1 PER PV CIRCUITPROJECT INFOSHEET NUMBERSCALESTACEY WILSON2380 WATERTOWN RDLONG LAKE, MN 55356SHEET NAMEDATE3.5.2024POWERFULLY GREEN2010 E HENNEPIN AVE.,MINNEAPOLIS, MN 55413LINE DIAGRAMSYSTEM RATING10.78 DC KW7.6 AC KWWIRE LEGENDEGC & GECPV ARRAY +VE CONDUCTOR AND L2NEUTRAL CONDUCTORPV ARRAY -VE CONDUCTOR AND L1NTSINVERTER SPECIFICATIONSMANUFACTURER/MODELGENERAC PWRCELL 7.6KW XVT076A03MAX INPUT DC POWER----MAX OUTPUT AC POWER7600 WACNOMINAL OUTPUT VOLTAGE240.0 VACMAX INPUT VOLTAGE420.0 VDCMAX OUTPUT CURRENT32.0 AACMAX INPUT CURRENT24.0 ADCOUTPUT COMPATIBILITY1-PHASE 3-WIREXCEL MN NOTES1.24/7, UNESCORTED, KEYLESS ACCESS SHALL BEPROVIDED TO ALL XCEL EQUIPMENT.2.THERE ARE NO NESC CLEARANCE CONCERNS INRELATION TO XCEL OWNED FACILITIES.3.THE UTILITY AC DISCONNECT SHALL BE LOCATEDIN A READILY ACCESSIBLE LOCATION WITHIN 10'OF THE MAIN SERVICE METER.4.PHASES OF DER SYSTEM BASED ON THEINVERTER OUTPUT (1-PHASE 3-WIRE).5.ALL REQUIRED ELECTRICAL LABELS ARE SHOWNON PV-56.A PLACARD IS REQUIRED AT THE MAIN BILLINGMETER WITH YELLOW & BLACK LETTERINGSTATING, "PHOTOVOLTAIC SYSTEM CONNECTED."(ALSO SHOWN ON PV-5).PV-4
PROJECT INFOSHEET NUMBERSCALESTACEY WILSON2380 WATERTOWN RDLONG LAKE, MN 55356SHEET NAMEDATE3.5.2024POWERFULLY GREEN2010 E HENNEPIN AVE.,MINNEAPOLIS, MN 55413ELECTRICAL LABELSNTSLABEL DIRECTORY:LABEL NOTESALL CAUTION, WARNING, OR DANGER SIGNSOR LABELS SHALL:1.COMPLY WITH ANSI Z535.4-2011STANDARDS.2.BE PERMANENTLY AFFIXED TO THEEQUIPMENT OR WIRING METHODS ANDSHALL NOT BE HANDWRITTEN.3.SHALL BE OF SUFFICIENT DURABILITYTO WITHSTAND THE ENVIRONMENTINVOLVED.4.UNLESS OTHERS SPECIFIED, MINIMUMTEXT HEIGHT TO BE 1/8" (3MM).NEC 690.56(A) & (B), 706.21(A)MAIN UTILITY DISCONNECTPV SYSTEM DISCONNECTCAUTION: MULTIPLE SOURCES OF POWERPV-5TURN RAPID SHUTDOWN SWITCHTO THE "OFF" POSITION TOSHUTDOWN PV SYSTEM ANDREDUCE SHOCK HAZARD INARRAYSOLAR ELECTRICPV PANELSNEC 690.56(C)SOLAR PV SYSTEM IS EQUIPPEDWITH RAPID SHUTDOWN1LABEL DIRECTORY:AC DISCONNECTPRODUCTIONMETERPV INVERTERJUNCTION BOXMAIN PANELUTILITY METER416852UTILITY PV AC DISCONNECTXCEL MN (AC DISCONNECT)4WARNING: POWER SOURCE OUTPUT CONNECTIONDO NOT RELOCATE THIS OVERCURRENT DEVICEWARNING: POWER SOURCE OUTPUT CONNECTIONDO NOT RELOCATE THIS OVERCURRENT DEVICENEC 705.12(A)(B)(3)(2)MAXIMUM DC VOLTAGE: 420.0 VDCNEC 690.53PHOTOVOLTAIC POWER SOURCENEC 690.31(D)(2)862PHOTOVOLTAIC SYSTEM CONNECTEDXCEL MN (UTILITY METER)1PV SYSTEM AC DISCONNECTRATED AC OUTPUT CURRENT: 630.0 AACNOMINAL OPERATING AC VOLTAGE: 240 VACRAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEMELECTRICAL SHOCK HAZARDTERMINALS ON THE LINE AND LOADSIDES MAY BEENERGIZED IN THE OPEN POSITIONWARNINGPV SYSTEM AC DISCONNECTRATED AC OUTPUT CURRENT: 32.0 AACNOMINAL OPERATING AC VOLTAGE: 240 VACRAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEMNEC 690.13(B) & 706.15(C)ELECTRICAL SHOCK HAZARDTERMINALS ON THE LINE AND LOADSIDES MAY BEENERGIZED IN THE OPEN POSITIONWARNINGNEC 690.56(C)(2)NEC 690.13(B) & 690.544441AC DISCONNECT4
PROJECT INFOSHEET NUMBERSCALESTACEY WILSON2380 WATERTOWN RDLONG LAKE, MN 55356SHEET NAMEDATE3.5.2024POWERFULLY GREEN2010 E HENNEPIN AVE.,MINNEAPOLIS, MN 55413MFG SPEC. SHEETSNTSEQUIPMENT SPECIFICATION NOTES1.ALL ELECTRICAL EQUIPMENT SHALL BECERTIFIED ACCORDING TO AHJ ANDNATIONAL REQUIREMENTS BY ANATIONALLY RECOGNIZED TESTINGLABORATORY (NRTL).2.FOR DOCUMENTATION SHOWING NRTLCERTIFICATION, SEE MANUFACTURERWEBSITE.3.ALL EQUIPMENT SHALL BE INSTALLEDACCORDING TO MANUFACTURERINSTRUCTION.PV-6
PROJECT INFOSHEET NUMBERSCALESTACEY WILSON2380 WATERTOWN RDLONG LAKE, MN 55356SHEET NAMEDATE3.5.2024POWERFULLY GREEN2010 E HENNEPIN AVE.,MINNEAPOLIS, MN 55413NTSMFG SPEC. SHEETSEQUIPMENT SPECIFICATION NOTES1.ALL ELECTRICAL EQUIPMENT SHALL BECERTIFIED ACCORDING TO AHJ ANDNATIONAL REQUIREMENTS BY ANATIONALLY RECOGNIZED TESTINGLABORATORY (NRTL).2.FOR DOCUMENTATION SHOWING NRTLCERTIFICATION, SEE MANUFACTURERWEBSITE.3.ALL EQUIPMENT SHALL BE INSTALLEDACCORDING TO MANUFACTURERINSTRUCTION.PV-7
PROJECT INFOSHEET NUMBERSCALESTACEY WILSON2380 WATERTOWN RDLONG LAKE, MN 55356SHEET NAMEDATE3.5.2024POWERFULLY GREEN2010 E HENNEPIN AVE.,MINNEAPOLIS, MN 55413NTSMFG SPEC. SHEETSEQUIPMENT SPECIFICATION NOTES1.ALL ELECTRICAL EQUIPMENT SHALL BECERTIFIED ACCORDING TO AHJ ANDNATIONAL REQUIREMENTS BY ANATIONALLY RECOGNIZED TESTINGLABORATORY (NRTL).2.FOR DOCUMENTATION SHOWING NRTLCERTIFICATION, SEE MANUFACTURERWEBSITE.3.ALL EQUIPMENT SHALL BE INSTALLEDACCORDING TO MANUFACTURERINSTRUCTION.PV-8
PROJECT INFOSHEET NUMBERSCALESTACEY WILSON2380 WATERTOWN RDLONG LAKE, MN 55356SHEET NAMEDATE3.5.2024POWERFULLY GREEN2010 E HENNEPIN AVE.,MINNEAPOLIS, MN 55413NTSMFG SPEC. SHEETSEQUIPMENT SPECIFICATION NOTES1.ALL ELECTRICAL EQUIPMENT SHALL BECERTIFIED ACCORDING TO AHJ ANDNATIONAL REQUIREMENTS BY ANATIONALLY RECOGNIZED TESTINGLABORATORY (NRTL).2.FOR DOCUMENTATION SHOWING NRTLCERTIFICATION, SEE MANUFACTURERWEBSITE.3.ALL EQUIPMENT SHALL BE INSTALLEDACCORDING TO MANUFACTURERINSTRUCTION.PV-9
PROJECT INFOSHEET NUMBERSCALESTACEY WILSON2380 WATERTOWN RDLONG LAKE, MN 55356SHEET NAMEDATE3.5.2024POWERFULLY GREEN2010 E HENNEPIN AVE.,MINNEAPOLIS, MN 55413NTSMFG SPEC. SHEETSEQUIPMENT SPECIFICATION NOTES1.ALL ELECTRICAL EQUIPMENT SHALL BECERTIFIED ACCORDING TO AHJ ANDNATIONAL REQUIREMENTS BY ANATIONALLY RECOGNIZED TESTINGLABORATORY (NRTL).2.FOR DOCUMENTATION SHOWING NRTLCERTIFICATION, SEE MANUFACTURERWEBSITE.3.ALL EQUIPMENT SHALL BE INSTALLEDACCORDING TO MANUFACTURERINSTRUCTION.PV-10
FILE SUMMARY REPORT
March 25, 2024
FILE INFORMATION
File #:22-000204 Address:2380 Watertown RD
Status: Closed Parcel #:3411823330080
Open Date:02/28/2022 Description:Installation of a 8.25 kW DC system parallel to roof on garage
Close Date:03/18/2024 Owner Name:STEPHEN E GAGNE
Type:Permitting Owner Address:STACEY LYNN WILSON
2380 WATERTOWN RD
LONG LAKE, MN 55356
CONTACTS
CONTACT ASSOCIATION CONTACTTYPE ADDRESS PHONE
Powerfully Green
Steve Gagne
Applicant Contractor Company Address:
2380 Watertown Road
Orono MN MN
Work: 763.438.1976
Mobile: 612.206.5628
PERMITS
PERMIT #TYPE DATES APPLICANT DESCRIPTION
SES22-
000001
Solar Energy
Systems Permit
Solar Energy
Systems Permit
Status: Closed
Application Date: 02
/28/2022
Issue Date: 04/22
/2022
Expiration Date: 09
/15/2024
Close Date: 03/18
/2024
Powerfully
Green
Installation of a 8.25 kW DC system parallel to roof on
detached garage
INSPECTIONS
PERMIT #TYPE INSPECTION DATE INSPECTOR STATUS
SES22-000001 Building Final 03/15/2024 Gary Nelson Permit Finaled
REVIEWS
PERMIT #TYPE REVIEW DATE REVIEWER STATUS
SES22-000001 Completeness Check 03/01/2022 Katie Fitzsimmons Review Approved
SES22-000001 Building Code Review 03/02/2022 Nicole Post Review Denied
SES22-000001 Zoning Review 03/11/2022 Melanie Curtis Review Approved
SES22-000001 Building Code Review 03/14/2022 Nicole Post Review Denied
SES22-000001 Building Code Review 04/05/2022 Nicole Post Review Approved
SES22-000001 Final Review 04/06/2022 Melanie Curtis Review Approved
SES22-000001 Building Code Review 03/07/2024 Nicole Post Review Approved
ACTIVITIES
PERMIT #TYPE ACTIVITY DATE ASSIGNED TO STATUS
SES22-000001 Online Document Upload 03/10/2022 Melanie Curtis Complete
SES22-000001 Online Document Upload 04/04/2022 Melanie Curtis Complete
SES22-000001 Required Inspections 04/05/2022 Nicole Post Review Approved
SES22-000001 Online Payment Received 04/22/2022 Alicia Johnson Complete
SES22-000001 Review Complete 04/22/2022 Alicia Johnson Complete
SES22-000001 Online Document Upload 03/06/2024 Melanie Curtis Complete
Activity Completed 03/18/2024 System User
DOCUMENTS
SOURCE DOCUMENT NAME DATE CREATED BY
If roof structure is accessib Steve garage 2.jpeg 02/28/2022 System User
If roof structure is accessib steve garage.jpeg 02/28/2022 System User
Construction Drawings Steve Construction App.pdf 02/28/2022 System User
Elevation Drawing Steve Elevation App.pdf 02/28/2022 System User
Site Plan Steve Site Plans App.pdf 02/28/2022 System User
System Email Notification Your permit application has been received.htm 02/28/2022 System User
Photo street view_building heights.pdf 03/08/2022 Melanie Curtis
Email Single Reviewer Plan Review.htm 03/08/2022 Melanie Curtis
Online Document Upload New Elevation Documents.pdf 03/10/2022 System User
System Email Notification Online Document Upload Received.htm 03/10/2022 System User
Email Single Reviewer Plan Review.htm 03/10/2022 Melanie Curtis
Email Single Reviewer Plan Review.htm 03/10/2022 Nicole Egan
Email Single Reviewer Plan Review.htm 03/14/2022 Nicole Egan
Online Document Upload Steve Gagne_Plans_V9 Stamped.pdf 04/04/2022 System User
Online Document Upload Steve Gagne Letter SS.pdf 04/04/2022 System User
System Email Notification Online Document Upload Received.htm 04/04/2022 System User
Email Single Reviewer Plan Review.htm 04/04/2022 Nicole Egan
Approved for Permit Steve Gagne Plans V9 Combined.pdf 04/05/2022 Nicole Egan
System Email Notification Your citizenserve application status has changed.htm 04/06/2022 System User
Email Payment Reminder.htm 04/22/2022 Alicia Johnson
System Email Notification Online Payment Received.htm 04/22/2022 System User
System Email Notification Your citizenserve payment has been received.htm 04/22/2022 System User
System Email Notification Your citizenserve application status has changed.htm 04/22/2022 System User
Merge document Permit Approved.htm 04/22/2022 Alicia Johnson
Merge document Inspection Card.htm 04/22/2022 Alicia Johnson
Additional Information Steve Gagne - Roof Evaluation (3-5-24).pdf 03/05/2024 System User
Online Document Upload SteveGagne_StampedPlansV11.pdf 03/05/2024 System User
Approved for Permit 2380 Watertown Rd, SteveGagne_Stamped solar.pdf 03/07/2024 Nicole Post
Email Inspection Report Individual.htm 03/15/2024 Gary Nelson
3/25/24, 12:21 PM Letter View
file:///C:/Users/kfitzsimmons/Downloads/Inspection Report Individual (22).htm 1/1
From:gnelson@oronomn.gov
Sent:03/15/2024 - 01:33 PM
To:info@powerfullygreen.com
CC:gnelson@oronomn.gov,jruthenberg@oronomn.gov,kfitzsimmons@oronomn.gov
Subject:Inspection Report Individual
CITY OF ORONO
2750 KELLEY PARKWAY
ORONO, MN 55356
PH: (952) 249-4600
FAX: (952) 249-4616
Inspection Report
2380 Watertown RD
Permit Number:SES22-000001
Site Address:2380 Watertown RD, Orono, MN 55356
Property Owner:STEPHEN E GAGNE
Description:Installation of a 8.25 kW DC system parallel to roof on garage
Inspection Date: 03/15/2024
Inspection Type: Building Final
Inspection Results: Permit Finaled
Sincerely,
Gary Nelson
952-242-4442
To schedule your inspections please call: (952) 249-4600
CODE REQUIREMENTS ARE FOR YOUR PERSONAL HEALTH AND SAFETY!