Loading...
HomeMy WebLinkAboutResolution 029 J WHEREAS,pursuant to the above,conferences and communi- cations with the Village Councils of Mound and Spring Park have been carried on relative to joint construction of sew- age facilities, and WHEREAS it is deemed that further study is desirable before determining a specific site for a sewage treatment plant, and WHEREAS certain portions of the collector system may be built regardless of the final location of the sewage treat- ment plant, and said portions can conveniently be built now for later attachment by trunk and interceptor lines to the sewage treatment plant wherever located NOW THEREFORE BE IT RESOLVED by the Village Council of the Village of Orono as follows; 1. The sewer apputtenances contained in -proposal #2 set forth in said notice of public hearing,but riot the sewage treatment plant,are hereby ordered to be made. The appurte- nances to be made are hereby declared to consist of the fol- lowing sewage collection facilities: 63 TS 1 Trunk sewer on County Road ## 51 from Countir Road # 84 to County Road x#19 63 TS 2 Trunk sewer on County Road x#19 from the termi- nus of 63 TS 1 to Togo Road 63 LS 1 Lateral sewer on County Road x#19 from Toko Road to County Road x#15 63 LS 2 Lateral sewer service on County.Road #15 from .County Road f# 19 to Dunwoody Avenue 63 TLS 1 Trunk lateral sewer service along routes of 63 TS 1 and 63 TS 2 -Together with such other sewage collection facilities as proper engineering may require to provide such sewer, service. The sewage collection facilities above described shall be referred to collectively as "1963 Sewer Improvement No.l". 2. William T. Mills,Village Engineer, is designated- as esignatedas the consulting engineer for said improvement and is hereby directed to prepare detail plans and specifica- tions thereof. . 3. The Village Engineer is further directed to make preliminary engineering studies and reports which shall enable the Village Council to determine: