HomeMy WebLinkAboutResolution 029
J
WHEREAS,pursuant to the above,conferences and communi-
cations with the Village Councils of Mound and Spring Park
have been carried on relative to joint construction of sew-
age facilities, and
WHEREAS it is deemed that further study is desirable
before determining a specific site for a sewage treatment
plant, and
WHEREAS certain portions of the collector system may be
built regardless of the final location of the sewage treat-
ment plant, and said portions can conveniently be built now
for later attachment by trunk and interceptor lines to the
sewage treatment plant wherever located
NOW THEREFORE BE IT RESOLVED by the Village Council of
the Village of Orono as follows;
1. The sewer apputtenances contained in -proposal #2 set
forth in said notice of public hearing,but riot the sewage
treatment plant,are hereby ordered to be made. The appurte-
nances to be made are hereby declared to consist of the fol-
lowing sewage collection facilities:
63 TS 1 Trunk sewer on County Road ## 51 from Countir
Road # 84 to County Road x#19
63 TS 2 Trunk sewer on County Road x#19 from the termi-
nus of 63 TS 1 to Togo Road
63 LS 1 Lateral sewer on County Road x#19 from Toko Road
to County Road x#15
63 LS 2 Lateral sewer service on County.Road #15 from
.County Road f# 19 to Dunwoody Avenue
63 TLS 1 Trunk lateral sewer service along routes of
63 TS 1 and 63 TS 2
-Together with such other sewage collection facilities
as proper engineering may require to provide such sewer,
service.
The sewage collection facilities above described shall
be referred to collectively as "1963 Sewer Improvement
No.l".
2. William T. Mills,Village Engineer, is designated-
as
esignatedas the consulting engineer for said improvement and is
hereby directed to prepare detail plans and specifica-
tions thereof.
. 3. The Village Engineer is further directed to make
preliminary engineering studies and reports which shall
enable the Village Council to determine: