Loading...
HomeMy WebLinkAboutOrd #148-3rd Ser/Amending 128 2015 Fee Schedule Revising Storm Water and Drainage Trunk FeesORDINANCE NO.148, THIRD SERIES CITY OF ORONO HENNEPIN COUNTY, MINNESOTA AN ORDINANCE AMENDING ORDINANCE NO. 128, THIRD SERIES ADOPTING THE CITY OF ORONO 2015 FEE SCHEDULE, REVISING STORM WATER AND DRAINAGE TRUNK FEES WHEREAS, the City has adopted Ordinance No. 14.6_ regulating the application of storm water trunk fees . NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF ORONO ORDAINS: Section 1. Page 6 of the 2015 Fee Schedule of the City of Orono, Ordinance No. 128 is amended by deleting the text and tables on said Page 6 and replacing it with the following: STORM WATER AND DRAINAGE TRUNK FEES Sec. 14-281 thru 14-288 Storm water trunk fees apply to new development and provide funding for the storm water infrastructure necessary to serve the City. The trunk fee is based on the land use and acreage of the property being developed. An equivalency factor multiplier is assigned to each land use type, with a 2 - acre residential lot considered as the standard in the City with an equivalency factor of 1.0. New Development Projects are defined as any land subdivision that creates new building lots; or construction of structures on a previously vacant parcel. The table below lists the new development storm water trunk fees per acre and per lot for the various zoning districts and land uses in the City. Storm Water and Drainage Trunk Fee New Development Land Use Trunk Fee per Acre ! Maximum Trunk Fee per Lot Single Family Residential 5 Acre Zone $3,075 $15,375 (1),(2),(4) Single Family Residential 2 Acre Zone $3,840 $7,680 (1),(3),(4) Single Family Residential 1 Acre Zone $5,000 $5,000 (1),(5) Single Family Residential 112 Acre Zone $5,765 $2,883 (1),(6) Multi Family Residential 4 Units/Acre or Less $6,930 NA (7) i Multi Family Residential Greater than 4 Units/Acre $8,085 NA (7) Commercial or Industrial $9,230 NA (1) Trunk fee charged on per lot basis. For the 5 -acre, 2 -acre, 1 -acre and 1/2 -acre zoning districts, the trunk fee shall be charged on a per -lot basis. Only acreage platted as building lots shall be charged the trunk fee. Acreage platted as road -rights-of-way or outlots for other purposes shall not be charged the trunk fee. The dollar amount calculated by multiplying (a) the number of new lots by (b) the zoning district base acreage per lot by (c) the base trunk fee per lot established in the City Fee Schedule, shall be deemed the Base Development Trunk Fee. (2) Maximum fee. For the Rve-acre zoning district, any lot exceeding 5.0 gross acres, including wetland, shall be charged a maximum trunk fee equal to the trunk fee for a 5.0 acre parcel. 3. Maximum fee. For the two -acre zoning districts, any lot exceeding 2.0 gross acres, including wetland, shall be charged a maximum trunk fee equal to the trunk fee for a 2.0 acre parcel. Page 1 of 2 4. Fee Credits. For the two -acre and five -acre zoning districts, a combined reduction of up to 50% of the Base Development Trunk Fee shall be allowed for the percentage of the total development property acreage in one or more of the following categories: acreage of newly -created wetland. acreage of stormwater ponding or similar improvements that provide additional treatment benefits beyond what is required to treat the stormwater runoff from the development site. acreage of conservation easements resulting from Conservation Design process. 5. Maximum fee. For the one -acre zoning districts, any lot exceeding I.0 gross acres, including wetland, shall be charged a maximum trunk fee equal to the trunk fee for a 1.0 acre parcel. 6. Maximum fee. For the 112 -acre zoning districts, any lot exceeding 0.5 gross acres, including wetland, shall be charged a maximum trunk fee equal to the trunk fee for a 0.5 acre parcel. 7. Multi -family and High -Density Single Family Developments. Trunk fee shall be charged on a per -acre basis, except that the following acreages will not be subject to the trunk fee: all wetland acreage up to the delineation line acreage of stormwater ponding or similar improvements that provide additional treatment benefits beyond what is required to treat the stormwater runoff from the development site. - m reage of consmuf ori easements rtzulting f ." C'onsm adun Dcsign process Section 2. Effective date. This ordinance shall be effective upon adoption and publication according to law. ADOPTED this 26th day of May, 2015 on a vote of 5 ayes and 0 nays by the Orono City Council. ATTEST: Tiegs, City Clerk CITY OF ORONO Lili McMillan, Mayor Page 2 of 2