Loading...
HomeMy WebLinkAboutOrd #146 - 3rd Ser/ Amending and Adding New Language to Chapt 86, Sec. 96-66 and 86-68 Regarding Landscape Permits and Survey RequirementsORDINANCE NO. 146, THIRD SERIES CITY OF ORONO HENNEPIN COUNTY, MINNESOTA AN ORDINANCE AMENDING AND ADDING NEW LANGUAGE TO CHAPTER 86, SECTIONS 86-66 AND 86-68 ORONO CITY CODE REGARDING LANDSCAPE PERMITS AND SURVEY REQUIREMENTS THE CITY COUNCIL OF THE CITY OF ORONO, MINNESOTA ORDAINS: SECTION 1. City Code Chapter 86, Section 86-66 regarding land alteration permits is hereby amended as follows: Sec. 86-66. — Required Permits Required. It is unlawful for any person to erect, construct, enlarge, alter, repair, move, improve, remove, convert, or demolish any building or structure, or any part or portion, including but not limited to the general construction, plumbing, waw well, on-site sewage treatment system, wood stoves and fireplaces, ventilating, heating or air conditioning systems, or cause such work to be done, without first obtaining a separate building, sign, or general permit for each such building, structure or separate component from the city. (b). Zoning Permit for Land Alteration. A land alteration and hardcover plan shall be submitted with the survey or site plan and incorporated as part of the building permit approval, including the name of the individual Performing the work. If no buildinq permit is necessary, a separate zoning permit application for hardcover and/or land alteration shall be submitted by the individual performing the work prior to conducting any land alteration or hardcover installations on a Property, including grading, patios and retaining walls. The zoning Permit shall be reviewed and approved by the city prior to issuance. SECTION 2. City Code Chapter 86, Section 86-68 regarding survey requirements is hereby amended as follows: Sec. 86-68. - Permit application; information required. (a) The application for a construction permit or land alteration permit shall include such information as may be required by the city, which may vary between types of construction projects. (b) Surveys required: (1) Initial survey or sife plan. Any building, zoning or general permit application for construction of a new structure., er expansion of an existing structure or land alteration shall be accompanied by a certificate of survey or site plan drawn to scale prepared by a person registered by the Minnesota Board, of Architecture, Engineering Land Surveying,Landscape Architecture and Interior Design, A certificate of survey or site plan small contorm to the City of Orono Survey and Site Plan Requirements. standards on file in the effiGe of the building efflGW. a. The certification of the elan by a licensed professional may be exempted b the city engineer if the project meets _all _of the followinc . 1) An existing As -Built survey exists for the property: 2) Property is located outside the Shoreland Overlay District 3) Property is not subject to the Stormwater Quality Overlay District; 4) Property contains 2.0 acres or greater in area, 5) Proposed project exceeds the required setback requirement by 150%: and 6) Proposed prolect footprint does not exceed 200 s care feet. (2) Foundation survey. A foundation survey shall be submitted to the city for review and approval, unless exempted by the building official, upon completion of the foundation work for all buildings and all additions to buildings. The foundation survey, prepared by a Minnesota Registered Land Surveyor, shall certify the lot dimensions; front, side, rear, lakeshore, and wetland setbacks; and foundation elevation. A foundation survey must be submitted before proceeding with framing or further construction. In lieu of a survey a letter prepared by a Minnesota Registered Land Surveyor containing the same information as a foundation survey may be submitted. (3) As -built survey. An as -built survey, prepared by a Minnesota Registered Land Surveyor, shall be submitted to the city for review and approval upon the completion of all buildings and all additions to buildings, unless exempted by the building official. The as -built survey shall certify the final topography of the site; verify drainage patterns; and provide hardcover calculations for lots in the Shoreland Overlay District. An as - built survey must be approved before the issuance of a certificate of occupancy. In the event that weather or other conditions prevent the completion of an as -built survey at the time the Certificate of Occupancy is requested, applicant shall provide a sufficient financial guarantee and establish an escrow agreement to ensure completion of the as - built survey. SECTION 3. Effective date. This ordinance shall be effective upon adoption and publication according to law. ADOPTED this 11th day of May, 2015 by the Orono City Council. A vote of 4 ayes and 1 nay. CITY OF ORONO V U'KAjL Lili McMillan, Mayor ATTEST: 1 e Tiegs, City rk