HomeMy WebLinkAboutOrd #022-3rd Ser/Adopting 2005 Fee Schedule /
ORDINANCE NUMBER 22 ,THIRD SERIES
SUMMARY APPROVED
The Council hereby determines that the text of the summary of this ordinance marked"Official
Summaiy of Ordinance Nuinber 22 ,Third Series," and a copy of which is attached hereto,clearly
infonns the public of the intent and effect of the ordinance. The Council further detennines that the
publication of the title and such summary will clearly inform the public of the intent and effect of the
ardinance.
SUMMARY OF ORDINANCE NUMBER 22 ,THIRD SERIES
ORDINANCE NO. 22 , THIRD SERIES
AN ORDINANCE ADOPTING THE 2005 FEE SCHEDULE
AND REPEALING ORDINANCE NO. 224, SECOND SERIES
The following is the official summary of Ordinance Number 22 ,Third Series approved by the
City Council of the City of Orono on December 13, 2004.
The following sections have changes, additions and/or deletions:
CODE
DESCRIPTION 2004 FEE 2005 FEE SEC.
ZONING APPLICATION
STORM WATER AND DRAINAGE
TRUNK FEES
New Development Land Use �A 2 220
Single Family Residential5 Acre Zone �89 2 770
Single Family Residential2 Acre Zoue �8 3 605
Single Family Residential 1 Acre Zone $4;A�9 4 160
Single Fanvly Residential 'h Acre Zone �4�9 4 990
Multi Family Residential4 Units/Acre or less $�7� $5,825
Commercial or Industrial �$8 $6,655
rea of Impervious Surface Expansion Residential Redevelopment Commercial or Industrial
Redevelopment
2004 2005 2004 2005
0-100 Square Fee $�59 975 c�,�- $2,330
1000-2000 Square Feet $�9A $1,940 Q^� $4,655
More than 2000 S uare Feet �AA- 2 770 �H;4�9- $6,655
LICENSES&MISCELLANEOUS CHARGES
Police Department Administered
Firearms Pemut to Carrv 10.00
Photograph Duplication $5.00 plus the actual cost of
From Ne atives duplication
From Digital Camera 10.00
Security Video onto CD $20.00
Statements $10.00(transcribed copy or
CD when available;subject to
Data Privac Act
Page 1 of 4
SEWER PROJECTS Unit Charee+ Area or Acre Chee Credit to Area
2004 2005
ilistrict-Project
1963 ST-lA,LS-lA,ST-IB,LS-1B �99 $5,980.00 (1)
1964 LS-lA or LS-1B Q�,4�o $5,980.00 (1)
1965 LS-1 Q� 4���^ (1)
�0 5 980.00
1965 LS-lA $-3-,$�3:88 5 980.00 (1)
1967 LS-1 Q�,°�o $5,980.00 (1)
1969 LS-1 Shore Hills Q'^,�w $14,925.00 (1)
1969 LS-2 Chevy Chase Q",m-r '�o $11,675.00 (1)
1970LS-1 SagaHill $�B:AA $11,675.00 (1)
1971 LS-1 Dunwoody Q",� '�o $11,675.00 (1)
1973-1 Q'",�.-^o^o $14,925.00 (1)
1980-1 Minnetoiilca Bluffs Q",� �'�o $12,955.00 (1)
1980-1 West Femdale/County Road 15 Q'0,�� $30,095.00 (1)
1980-1 Orono Lane Q''�,��^�^.-w $24,085.00 (1)
1980-1 CountyRoad 15/Nlarinas �9�A:88 $10,085.00 (1)
1980-2 North Shore Drive/Scotch Pine Ln Q'°,�� $30,095.00 (1)
1981-1 North Shore Drive/Highwood �A$�:9A $15,490.00 (1)
1982-1A Navarre Utilities Q�,�.-� $3,290.00 Truulc Area�1�AA$1350.00 (1)
1982-1B Navarre Utilities Northem Ave �3�&98 $535.00 �47�-8A$3,565.00 Per Acre (1)
1985-1 CrystalBay Q'�,�a^-.^�^ $15,670.00 (1)
1983-1 Highway 12 Orono-Long Lake-Medina Q',�o $1,535.00 (1)
1989 Highway 12 Q`�$5,655.00/acre (1)
1992 Stubbs Bay Sewer
I Shibbs Bay NE/NW-Bayside East $�9:88 $17,635.00 (5)
II Bederwood $�399:AA $27,310.00 (5)
TII Bayside North Q''',�� $23,120.00 (5)
IV Oxford �8A $32,640.00 (5)
V Cygnet and Leaf $-�3�83-:9A $26,375.00 (5)
1997 Sewer
97-1 North L.L./L.L.C.C. Q�� ��n nn $22,975.00 ((>)
�w
97-2 Bracketts Point Q�',�� $38,250.00 (6)
97-3 Bay Ridge �1�$-5:88 $20,420.00 (()
1998-1'999 Sewer
1998 Shoreline/Heritage $�8�-S:A9 $19,292.00 (�)
99-1 Orono Orchard �A:BA $25,430.00 (7)
99-2 Edgewood Hills $�r�,4�A9 $32315.00 (7)
2000 Sewer
2000-1 Webber Hills �8A 8 375.00 Excludes Grinder Allowance (8)
2000-2 Fox Ridge �8AA=99 $18,485.00 Excludes Grinder Allowance (8)
2000-3 East Long Lake Q�^,�e^-.^o^o $14,675.00 Excludes Grinder Allowance (8)
2003 Sewer �gg�gg $11,295.00 (1)
2003-1 North Long Lake Ease
2003-2 Old Long Lake Rd �8 6 675.00 (1)
2003-3 Sixth Ave N/Brown Rd(Phillips) �g 8 730.00 (1)
2004 Sewer
2004 West Farm/Homestead 6 400.00 (1)
Page 2 of 4
1984 Forcemain and Lift Station#7 #6 Bv Pass+ #7 Forcemain Credit to Area
Existing Properties/Increase �A$605.00 (4)
New Bldgs Replacing Existing Bldgs �}A:A9$605.00 (4)
New Residential w/Existing Stub �3-98$1,730.00 (4)
New Residenrial without Siub �5-:AA(�}$545.00(1) �3:A9$1,730.00.(4) (1)and(4)
Freshwater Biological(tncl. "Marsh at Lafayette"Locs) �A9(�}$545.00(11 $�i9�9$680.00(4) (1)and(4)
1989 Gravity Line and Lift Station Fixed Char�e+ #10 By Pass Credit to Area
(see map for affected areas) $225.00 �8$3,050.00 (1)
WATER PROJECTS Unit CharQe+ Area/Acrea�e Front Foot Credit to Area
By District-Project $4;9(8:89 5 095.00 �$37.84 (1)
1967 LW-1 Highway 12/Crystal Bay Road $4;9�AA 5 095.00 (1)
1949 LW-2 Chevy chase Q',^�-.��0 2 520.00 -�4�53 25.21 (1)
1970 LW-1 Navarre Residential $�699�A9 3 790.00 �r98 37.90 (1)
1970 LW-1 Navarre Conunercial Q�,��o$2,690.00 (1)
19�2-1A Navarro �9;�8:-A8-$9,355.00/acre (1)
1989 Highway 12 $4A�98$415.00 (1)
1999 Navan•e Water Treahnent Plant
�' Rehabilitation
PUBLTC WORKS DEPARTMENT MISCELLANEOUS CHARGES
MUNICIPAL SEWER RATES by unit: 2004 Fee 2005 Fee
1 st Q�'.��„� �-��� 93.90 per quarter
2nd Q4'.��� ^�'�� $85.00 per quarter
by flow: Q �.�nnnnn,...n,...„i„� $ 3.54/1000 gallonplus
Q 4 �n�er�,^~'e..�e~ 8,85 per quarter per
�� connection
MUNICIPAL WATER RATES
Navar�e Area
Billi�g&Ready to Serve Chg Q '� 26.85/qtr
Wate'r Usage Rate Q �.��ii nnn,,,,i $ 2.27/1000 gal
Unconriected Property Chg �F�-S,�t� 26.85/qtr
Highway 12 Area
Billing&Ready to Serve Chg Q n•� 9J5/qtr
Water Usage Rate �8H�1-A99-ga� 3.15/1000 gal
Chevy Chase Area
Billing&Ready to Serve Chg c n•� 9.75/qtr
Water Usage Rate . 236/1000 gal(no change)
Bulk sale to Minnetonka Beach for Lafayette Ridge Q'�.'��^M'��"�^^�'�^�����••� $26.85/qtr billing charge plus
Area Q� �i ii nnn....n,....,.�..t�,.....,. $2.27/1000 gallon total flow at
'�^-'��� border meter
Page 3 of 4
MUNICIPAL STORM WATER UTILITY
RATES
One Residenrial Unit �4:A9 per quarter 9.25 per quarter
Jon-Residential Unit: Based on"Residenrial Based on"Residential
Equivalent Factor" Equivalent Factor
GOLF COURSE CHARGES-Effective date 2005Season
Monday thru Friday(excluding Holidays
Begin Play Before 12:00 Noon 2004 Fee 2005 Fee
10 Pass(12 punches/9 holes each) $ 100.00
5 Pass(6 uunches/9 holes each) $ 50.00
After 12:00 Noon and Weekend Rates
10 Pass(12 punches/9 holes each) $ 130.00
5 Pass(6punches/9 holes each� $ 65.00
—T., ..U..�.,..AiT.....a....4L..... C.-..1..., Q' 1�
GOLF CART RENTAL
Motorized:
After 12:00 Noon and Weekend Rates
10 Pass(,11 punches/9 holes each� 120.00
Begin Play Before 12:00 Noon
10 Pass(11 punches/9 holes each) $100.00
A printed copy of the 2005 Fee Schedttle Ordinance is available for inspection by any person at the office of the
City Clerk during regular office hours.
This ordinance becomes effective tlie weelc of January l, 2005.
Adopted by the City Council of tlle City of Orono on this 13th day of December,2004,by a vote of 5 ayes
and � nays.
ATTEST:
��_ �
4/ �L P�C� J J' G�.�-� ����E���e�L'V N
Lin a S. Vee, City Clerk Barbara A. Peterson, Mayor
Published in the Laker/Pioneer newspapers the week of December 25, 2004.
Page 4 of 4
2005 FE, .:HEDULE
DIRECTORY
Copy Cl:arges Page Licenses&Misce/laneous(Co�rt.) Page Permits(Cont.) Page
Administration 20 Home Occupation License 19 Sprinkler Systems-
Accident Reports 24 Joint Use Dock License 19 Commercial 18
Audio Recording Duplication 20 Kennel License 21 Tree Removal 8
Building Plan Copies 20 Public Dance License 22 Underground Tank Removal 9
Copy Microfiche File-PD 24 Returned Check Charge 20 Water Meter Fees 9
Copy Service-Police Dept 24 Solicitation License 20
Driver's License Record 24 Temporary Trailer/Building 19 Services
Information on CD 20 Tobacco License 20 Fingerprinting(Police) 23
Reprint Oversiaed Documents Transient Merchant/Peddler License 20 Water Turn-Off Charge 25
On Microfilm 20 Water Turn-On Charge 25
Summary Data Report 24 Maps For Sale ?�
Tape Duplication(Police Dept.) Sigres
Audio 24 Public Works Supplies&Services Street Signs(Public Works) 28
Video 24 Address Change 28 Temporary&Permanent 17
Driveway Culverts 28 Temp."No Parking"(P.D.) 24
Co�tnection Charges Driveway/Curb Cut Permifs 28 Temp."No Parking"(P.W.) 28
Sanitary Sewer 10
Municipal Water 15 Permits Utility Rates&Miscel[aneous
Unit Adjustment 16 After-The-Fact Fees 5 Annual Service Charge-
Building Permit Fees 8 Septic 17
Docunients Buming Permits 18 Municipal Sewer 25
Comprehensive Guide Plan 19 Cert.of Occupancy 8 Municipal Water 25
Current Street Address Book 20 Demolition Permit Fee 8 Recycling Charge 26
Labels 21 Docks• Recycling Replacement Bins 26
Listing Info-Realtors 20 Commercial 8 Stormwater Utility 26
Mail In Postage&Handling 20 Residential 8
Municipal Code/Ordinance 19 Fire Protection 18 Zosing Applicatians
Special Assessment Searches 20 Fireworks Permit Fee 22 After-The-Fact Fees 5
Grading,Excavating,Filling 17 Amendments 2
False A[arnt User Fees 23 Large Assembly Permit 22 Appeal of Admin.Decision 4
Lawn Sprinkler System 18 Commercial Site Plan 2
Golf Course Cl:arges 26 Limited Trapping Permit 23 Comprehensive Plan Amend 2
Mechanical Permit Fees 9 Conditional Use Permit Fees 1
Inspections Municipal Hook Up Industrial Revenue Bond Appt. 4
Contractual Inspection Service 18 (Sewer/Water) 9 Park Dedication Fees 6
Special Inspection Charges 18 On-Site Systems(Septic) 17 PUD Rezoning 2
Outhouse Construction 17 Rezoning Application Fee 2
Licei�ses&Miscella�:eous (See On-Site Systems) Rip Rap Application Fee 4
After-The-Fact Fees 5 Plumbing Permit 9 Special Improvements Appl. 4
Amusement Devices 22 Retaining Walls S Stormwater/Drainage Trunk Fees 7
Animal Impound Fees 21 Special Events 23 Subdivision Application Fee 3
Beer,Wine&Liquor License 22 Surcharge for Staff Expense 5
Canoe Rental Slip 19 Vacation Application Fees 3
Commercial Marina License 19 Variance Application Fees 1
Dog License 21
Gambling/Raffle License 20 *Index Begins on Page 29
Garbage Haulers License 19
ORDINANCE NO. 22 ,THIRD SERIES
AN ORDINANCE ADOPTING THE 2005 FEE SCHEDULE
AND AN ORDINANCE REPEALING ORDINANCE NO.5,THIRD SERIES
The City Council of the City of Orono ordains:
SECTION 1. Ordinances Repealed. Ordinance No.5,Third Series,entitled 2004 Fee Schedule is hereby repealed.
The City Council of Orono per Section 2-171 of the Municipal Code hereby ordains the following fees effective during the calendar year 2005:
SECTION 2. Fees.
ZONING APPLICATIONS
Ail fees are application fees and are non-refundable after staff work has begun on the application.
Applicable
Application Tvpe Fee Code Section
VARIANCE
Base Fee(Additional variances included in base fee) $600.00 Sec.78-42; 78-96 thru 99
Renewal Variance $250.00 Sec.78-42;78-96 thru 99
(No change from original application)
After-the-Fact Fees Double Application Fee Res.#1306ԝ
CONDITIONAL USE PERMIT(One charge per project) Sec.78-42;78-913
Residential Accessory Use(Animals,etc.) $600.00
Institutional Use(School,Church,etc.) $600.00
Duplex Credit(per building) $600.00
Guest House/Guest Apartment $600.00
CommerciaUIndustrial Use $600.00
Non-Conforming Use(Finding of Similar Use) $600.00
2005 Fee Schedule Page 1
ZONING APPLICATIONS(CONT.)
Applicable
Application Tvpe Fee Code Section
CONDITIONAL USE PERMIT Continued(One Charge per Project) Sec.78-42;78-913
Land Alteration: $600.00+permit
-Grading&filling-designated wetland/floodplain
-Grading,filling,etc.(over 500 cubic yards)
-Sea walls,retaining walls within 0-75'lakeshore
Amend Existing CUP $600.00
Renewal Conditional Use Permit $250.00
(no change from original application)
Conditional Use Permit with Variance(included in base CUP fee for 2004)
After-the-Fact Fees Double Application Fee Res.#1306ԝ
PLANNED DEVELOPMENT
RPLTD or PRD Application with Subdivision Subdivision Fee pius$35.00
per dwelling unit
RPUD or PRD Application without Subdivision $50.00 per dwelling unit
(minimum$600.00)
PID Applications(5 acre minimum per code) $175.00 per acre
(minimum$875.00)
PUD Rezoning(Highway 12 Corridor Only): Ch.78,Article VI
Residential $600.00+$40.00
per dwelling unit
Commercial/Industrial $175.00 per acre
(min.$875.00)
COMMERCIAL SITE PLAN REVIEW $600.00+Consultant Fees Sec.78-42
ZONING AMENDMENTS INCLUDING REZOI�TING $600.00 Sec.78-42
REQUEST TO AMEND COMPREHENSIVE PLAN $600.00 Sec.78-42
2005 Fee Schedule Page 2
ZONING APPLICATIONS(CONT.)
� Applicable
Application Tvpe Fee Code Section
SUBDIVISION
Sketch Plan(Class I,II,&III) $350.00 Sec.82-85
Basic Subdivision Application $600.00 Sec.82-112(a)(b)
(Class I&II Subdivisions,Subdivision of a Lot Line Rearrangement)
Preliminary Plat Review $750.00+$30.00/lot Sec.82-112(c)
(Class III and all non-residential) ($810/21ots;
$840/3 lots;
$870/4 lots,etc.)
Final Ptat Review(Class III) $250.00+Special Legal/Engineering/
Consultant Charges Sec.82-142(9)
Filing Fees: a)Subdivision only $140.00 Minimum plus any Sec.82-142(11)
additional costs
b)Subdivision+Easements&Covenants $280.00 Minimum plus any additional costs
Renewal of Subdivision Approval $300.00
(Class I,II &III,and Subdivision of a Lot Line Rearrangement)
(No Change From Original Approval)
VACATIONS
Public Road $75.00 per benefitting Sec.78-42
property
($600.00 minimum per
application)
Easement Vacations with Subdivision Applications $100.00 Sec.78-42
Easement'Vacations not Associated with Subdivision Applications $600.00 Sec.78-42
2045 Fee Schedule Page 3
ZONING APPLICATIONS(CONT.1
Applicable
Application Tvne Fee Code Section
SPECIAL IMPROVEMENTS Sec.82-213(4)
Non-refundable charges for City Engineer's review for applications and
design drawing,including construction inspection fees. If improvements
are proposed as part of a Subdivision,Review Charges are payable with
Preliminary Plat application.
Proposed Private Roads $650.00 plus SOt/lineal foot
Proposed Public Roads $950.00 plus 50E/lineal foot
Request for City to accept existing private road $950.00
Request for City to maintain unimproved public road $225.00
Proposed Sanitary Sewer Main Extension $275.00 plus$25.00 per stub
Proposed Watermain Extension $275.00 plus$25.00 per stub
Proposed Storm Sewer System(excluding culverts) $250.00
On-SiYe System-Site Evaluation Review $60.00 per new lot proposed
(applicable to rural subdivision applications) for on-site
RIP-RAP
Staff Review(normal rip-rap) No Charge(MCWD Permit Required)
Unusual Rip-Rap: a)New installation $100.00+CUP review
b)Repair previously approved Staff permit=$100.00
APPEAL OF ADMINISTRATIVE DECISION $100.00 Sec.78-99
INDUSTRIAL REVENUE BOND APPLICATIONS
Minimum Project Valuation: $250,000.00
Application Fee: 0.1% of project valuation
($250.00 minimum)plus
$5,000.00 deposit for legaU
administrative expenses
2005 Fee Sche�lule Page 4
ZONING APPLICATIONS(CONT.)
Applicable
Aqplication Tvne Fee Code Section
SURCHARGE FOR STAFF EXPENSE IN EXCESS OF APPLICATION FEES Sec.78-42
Per Fee Schedule set forth below:
Professional Time $50.00/hour
Clerical Time $30.00/hour
Legal/Engineering Consultants Actual Billed Cost
Mileage/Copies/Postage/Etc. Actual Cost
AFTER-THE-FACT APPLICATION INVESTIGATION FEES(Resolution 1306)
(Applies to all application types including variances,conditional use permits,subdivision,
zoning amendments,rip-rap permits,special improvement reviews,grading permits,moving
permits,business licenses,kennel licenses,all building permits and all general permits.)
This permit fee may be waived by staff for resident property owners who have not involved a
contractor in their work,have no previous history of work without a permit and where such work
does nat entail any zoning violations.
Whenever any work,use or division of land for which a formal application is required has been
commenced without first making such application and receiving City approval therefore,a
special investigation of the circumstances shall be made during the application process.
Because of the extra administrative costs involved in the speciai investigation,the minimum
application fee for after-the-fact applications shall be twice the fee set forth in the basic
fee schedule,whether or not the application is thereafter approved or denied. Payment of an
after-the-fact application fee shail not constitute approval or authorization of the work,use,
or division of land,and shall not constitute a penalty or a waiver of the right of the City to
institute civil or criminat legal actions against the applicant for commencing such work,use
or division of land without the required prior approval of the City.
After-the-fact Investigation Fee Amount: Equal to and in addition to
the basic fee amount(total
fee is twice the basic fee
amount). Res.1306
2005 Fee Schedule Page S
ZONING APPLICATIONS(CONT.)
Applicable
Fee Code Section
PARK DEDICATION FEES I Sec.82-227
Land Dedication Minimum Area-Subdividers shall be required to dedicate to the City for
parks,playgrounds,trails,open spaces and other public purposes as a minimum that percentage
of gross land area,or other such amount as may be determined by the City Council,as set forth below:
(1) Residential/Agricultural/Multiple Residential Zoned Land.
Dedication requirement of S%of the land being platted or subdivided.
(Eaclusive of lot that includes an existing residence.)
(2) CommerciaUIndustrial Zoned Land.
Dedicated requirement of 8%of the land being platted or subdivided.
Cash Contribution in Lieu of Lands. In those instances where a cash contribution is to be made
by the subdivider,in lieu of a conveyance or dedication of land,the cash contribution to be
contributed shail be equivalent to the fair market value of the equivalent undeveloped land
that would otherwise have been conveyed or dedicated. The City shail account for such funds in
a special fund named Park Dedication Funds.
The City Council has established by resolution a minimum residential park fee of Res.4738(12-10-01)
$3,250 per dwelling unit and a maximum of$5,550 per dwelling unit.
The City Council has established by resolution a minimum commerciaUindustrial park fee of Res.4739(12-10-01)
$8,125 per acre and a maximum of$13,875 per acre.
2005 Fee Schedule Page 6
ZONING APPLICATIONS (CONT.) Applicable
Fee Code Section
STORM WATER AND DRAINAGE TRUNK FEES Sec. 14-281 thru 14-287
Storm water trunk fees apply to new development and redevelopment of existing properties and provide funding for the storm water infrastructure necessary to serve the City.
The trunk fee is based on the land use and acreage of the property being developed. An equivalency factor multiplier is assigned to each land use type,with a 2-acre residential
Iot considered as the standard in the City with an equivalency factor of 1.0. The table below lists the storm water trunk fees per acre for the various zoning districts and land
uses in the City.
Storm Water and Draina e Trunk Fees
New Development TI'unk Fee/ (1)Buffer Easement Reduction.For the 5-acre zoning
Land Use Acre district,a reduction of up to 50%of the trunk fee for the lot
will be allowed for the percentage of the lot protected by
Single Family Residential 5 Acre Zone(1)(2) $2�22p perimeter and/or drainage way buffer easemenu.These buffer
easement areas shall remain in a naturai condition.
Single Family Residential 2 Acre Zone(3) $2���� (2)Maximum Fee.For the 5-acre zoning district,any lot
exceeding 7.0 gross acres including wetland,shall be charged a
Single Family Residential 1 Acre Zone $3,605 maximum trunk fee equal to the trunk fee for a 7.0 acre parcel.
Such lot shall remain eligible for the up to 50%reduction
Single Family Residential'/z Acre Zone $4,160 noted in(1)above,such reduction based on the percentage of
7.0 acres that is placed in buffer easements.
Multi Family Residential4 Units/Acre or Less $4,990
(3)Maximum Fee.For the 2-acre zoning districts,any lot
Multi Family Residential Greater than 4 Units/Acre $5,825 exceeding 4.0 gross acres including wetland,shall be charged a
maximum trunk fee equal to the trunk fee for a 4.0 acre
Commercial or Industrial $6,655 parcel."
Redevelopment projects will be defined as any project to either remove and replace existing structures or to enlarge existing structures. These projects will be charged a
portion of the base trunk fee adjusted for the area of expansion of impervious surface above the existing conditions. The table below lists the base trunk fee based on the area
of impervious surface ezpansion and adjusted for the type of land use. The trunk fee shall be determined by multiplying the appropriate fee by the acreage of the development
site.
Area of Impervious Surface Residential Redevelopment or Expansion Commercial or Industrial
Expansion of Ezisting Development Redevelopment or Expansion of Existing
Trunk Fee/Acre Development Trunk Fee/Acre
0-1000 Square Feet $975 $2,330
1000-2000 Square Feet $1,940 $4,655
More than 2000 Square Feet $2,770 �6,655
2005 Fee Schedule Page 7
CONSTRUCTION PERMITS AND INSPECTION FEES
Applicabte
Permit Tvne Fee Code Section
BUILDING PERMIT Ord.216
Minimum Fee $23.50
Normal Fee (per 1997 UBC/SBC Standard Schedule)
Plan Review Fee:
Commercial (per 1997 UBC/SBC Standard Schedule)
Residential 65% of Building Permit Fee
Building Valuation Standard (per Current I.C.B.O.Building
StandardsBuilding Valuation Data)
ZONING CERTIFICATE OF OCCUPANCY WITHOUT BUILDING PERMIT $50.00
(change in use)
RETAINING WALLS(in excess of 42" also $23.50 minimum
multiple tiered walls that exceed 42" (per 1997 UBC/SBC Standard Schedule)
and notlocatedin lakeshore protected area)
NOTE: Retaining walls in 0-75'lakeshore protected zone-see Cond.Use Permit section of fee schedule.
TREE REMOVAL WITHIN 0-75' $30.00 Sec.78-281 thru 78-283
DOCKS-RESIDENTIAL $30.00
[Permanent(CUP Required)and Initial Seasonal]
DOCKS-COMMERCIAL Per 1997 UBC/SBC Standard Schedule
DEMOLITION PERMIT Ord.216
Principal Structure $50.00 Initial inspection
$25.00 for each requested
or required inspection beyond
initial inspection
Accessory Structure $30.00 Initial inspection
2005 Fee Schedule Page 8
CONSTRUCTION PERMITS AND INSPECTION FEES(CONT.)
Applicable
Permit Tvae Fee Code Section
PLUMBING PERMIT 1.25%of contract price or
Minimum Fee for Plumbing Permit $35.00 minimum per project
Replacement of residential fixture or appliance(meets code requirements) $15.00 �
Mail-in postage&handling charge $ 1.50
MECHANICAL PERMIT
Residential Sin�le Famitv&Duulex bv Unit Tvpe
Minimum Fee for Mechanical Permit 1.25%of contract price or
$35.00 minimum per project
Replacement of residential fixture or appliance(meets code requirements) $15.00
Mail-in postage&handling charge $ I.50
Under Ground Tank Removal Per mechanical permit fees
Coznmercial,Industriat&Multi-Familv Residential bv Unit Tvpe $35.00 minimum fee or
1.25%of contract price
MUNICIPAL CONNECTION PERMIT(together with area connection charges)
Sewer $35.00
Water $35.00
5/8"(3/4"x7'/2")meter&horn including sales tax $210.00 Res.#5101
3/4"(3/4"x9")meter&horn including sales tax $250.00
1" meter&horn including sales tax $320.00
larger meter quote basis
Mail-in postage&handling charge $ 1.50
(sewer and water permits only)
2005 Fee Schedule Page 9
ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement proj ect is not deemed to be required in the sole
discrerion of the City. If an improvement is required,the connection charge may be in addition to any assessment.)
The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be charged the
connection fee for that area. Such connecrions are subject to City Council approval.
SEWER PROJECTS
By District- Project Unit Charge + Area Or Credit To Area
Acreage Charge
1963 ST-lA,LS-lA,ST-1B,LS-1B $5,980.00 1
1964 LS-lA or LS-1B $5,980.00 1
1965 LS-1 $5,980.00 1
1965 LS-lA $5,980.00 1
1967 LS-1 $5,980.00 1
1969 LS-1 Shore Hills $14,925.00 1
1969 LS-2 Chev Chase $11,675.00 1
1970 LS-1 Sa a Hill $11,675.00 1
1971 LS-1 Dunwood $11,675.00 1
1973-1 $14,925.00 1
CREDIT TO AREA:
(1) 602-37691 Sewer Operating (6) 311-37691 1997 Improvements
(4) 406-37691 PIR Fund#7 LS&Forcemain ('n 313-37691 1998-1999 Sewer Improvements
(5) 316-37691 1992 Improve Stubbs Bay (8) 314-37691 2000 Sewer Improvements
2005 Fee Schedule Page 10
ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement proj ect is not deemed to be required in the sole
discretion of the City. If an improvement is required,the connection charge may be in addirion to any assessment.)
The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be charged the
connecrion fee for that area. Such connecrions are subject to City Council approval.
SEWER PROJECTS
1980-1 Minnetonka Bluffs $12 955.00 1
1980-1 West Ferndale/Coun Road 15 $30,095.00 1
1980-1 Orono Lane $24 085.00 1
1980-1 Count Road 15/Marinas $10,085.00 1
1980-2 North Shore Drive/Scotch Pine Lane $30,095.00 1
� 1981-1 North Shore Drive/Hi hwood $15,490.00 1
1982-1A Navarre Utilities $3,290.00 Trunk Area (1)
$1 350.00
1982-1B Navarre Utilities Northern Avenue $535.00 $3,565.00 (1)
(trunk unit Per Acre
acre/unit
1985-1 Cr stal Ba �15,670.00 1
CREDIT TO AREA:
(1) 602-37691 Sewer Operating (6) 311-37691 1997 Improvements
(2) 406-37691 PIR Fund#7 LS&Forcemain (7) 313-37691 1998-1999 Sewer Improvements
(3) 316-37691 1992 Improve Stubbs Bay (8) 314-37691 200 Sewer Improvements
2005 Fee Schedule Page 11
ALL SA1vITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement proj ect is not deemed to be required in the sole
discrerion of the City. If an improvement is required,the connecrion charge may be in addition to any assessment.)
The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be charged the
connecrion fee for that area. Such connections are subject to City Council approval.
SEWER PROJECTS
1983-1 Hi hwa 12 Orono-Lon Lake-Medina $1,535.00 1
1989 Hi hwa 12 $5,655/acre 1
1992 Stubbs Bay Sewer
I Stubbs Bay NE/NW-Bayside East $17,635.00 (5)
II Bederwood $27,310.00 (5)
III Bayside North $23,120.00 (5)
IV Oxford $32,640.00 (5)
V Cygnet and Leaf $26,375.00 (5)
1997 SEWER
97-1 North L.L./L.L.C.0 $22,975.00 �6)
97-2 Bracketts Point $38,250.00 �6)
97-3 Bay Ridge $20,420.00 �6)
1998 - 1999 SEWER
1998 Shoreline/Heritage Sewer $19,292.00 ��)
99-1 Orono Orchard Sewer 525,430.00 ��)
99-2 Edgewood Hills Sewer $32,315.00 ��)
CREDIT TO AREA:
(1) 602-37691 Sewer Operating (6) 311-37691 1997 Improvements
(2) 406-37691 PIR Fund#7 LS&Forcemain (7) 313-37691 1998-1999 Sewer Improvements
(3) 316-37691 1992 Improve Stubbs Bay (8) 314-37691 200 Sewer Improvements
2005 Fee Schedule Page 12
ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement proj ect is not deemed to be required in the sole
discretion of the City. If an improvement is required,the connection charge may be in addition to any assessment.)
The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be charged the
connection fee for that area. Such connections are subject to City Council approval.
SEWER PROJECTS
2000 SEWER
2000-1 Webber Hills $8,375.00 Excludes Grinder Allowance (8)
2000-2 Fox Ridge $18,485.00 Excludes Grinder Allowance (8)
2000-3 East Long Lake $14,675.00 Excludes Grinder Allowance (8)
2003 SEWER
2003-1 North Long Lake East $11,295.00 �1)
2003-2 Old Long Lake Rd $6,675.00 �1)
2003-3 Sixth Ave NBrown Rd $8,730.00 �1)
2004 SEWER
2004 West Farm/Homestead $6,400.00 (1) (g)
CREDIT TO AREA:
(1) 602-37691 Sewer Operating (6) 311-37691 1997 Improvements
(2) 406-37691 PIR Fund#7 LS&Forcemain (7) 313-37691 1998-1999 Sewer Improvements
(3) 316-37691 1992 Improve Stubbs Bay (8) 314-37691 200 Sewer Improvements
2005 Fee Schedule Page 13
ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement project is not deemed to be required in the sole
discretion of the City. If an improvement is required,the connecrion charge may be in addirion to any assessment.)
The connecrion charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be charged the
connection fee for that area. Such connections are subject to City Council approval.
1984 Forcemain and Lift Station#7 upgrade:
(An additional fee is charged for properties benefitting from the 1984 forcemain and lift
station#7 upgrade,as follows,see map for affected areas):
All Char es Are Per Unit
#6 B Pass+ #7 Forcemain Credit To Area
Existin Pro erties/Increase $605.00 4
New Bldgs Replacing Existing Bldgs(If usage increases S 605.00 (4)
from existin
New Residential w/Existin Stub $1,730.00 4
New Residential without Stub $540.00 1 $1,730.00 4 1 and 4
Freshwater Biological(Incl. "Marsh at Lafayette'Lots) $540.00(1) $680.00(4)Per unit on (1) and(4)
connection(previously
assessed$2,000/acre)
1989 Gravity Line and Lift Station#10 By Pass:
An additional fee is charged for properties benetitting from the 1989 gravity line and lift
station#10 by-pass per Resolution#2671:
Fixed Charge+ #10 By Pass Credit To Area
(see map for affected areas) $225.00 $3,050.00 (1)
CREDIT TO AREA: '
(1) 602-37691 Sewer Operating (6) 311-37691 1997 Improvements
(2) 406-37691 PIR Fund#7 LS&Forcemain (7) 313-37691 1998-1999 Sewer Improvements
(3) 316-37691 1992 Improve Stubbs Bay (8) 314-37691 200 Sewer Improvements
2005 Fee Scheclule Page 14
ALL SANITARY SEWER AND MiJNICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement project is not deemed to be required in
the sole discretion of the City. If an improvement is required,the connection charge may be in addition to any assessment.)
The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be
charged the connection fee for the area. Such connections are subject to City Council approval.
WATER PROJECTS
By District- Project Unit Charge+ Area Or Acreage Front Foot Credit To Area
Char e+ Char e
1967 LW-1 Highway 12/Crystal Bay $5,095.00 $37.84 (1)
Road
1969 LW-2 Che Chase $5 095.00 -- 1
1970 LW-1 Navarre Residential $2,520.00 $ 25.21 1
1970 LW-1 Navarre Commercial S 3,790.00 $ 37.90 1
1982-1A Navarro $2,690.00 1
1989 Hi hwa 12 $9,355/acre 1
1999 Navarre Water Treatment $ 415.00 �l�
Plant Rehabilitation*
*1949 Navarre Water Treatment Plant Rehabilitation Connection Charge-All properties within the Navarre Municipal Water District(the area served with municipal water
service via the Navarre Water Treatment Plant)which were either not assessed or not fully assessed via speciai assessment for the 1999 Navarre Water Treatment Plant
Rehabilitation Project shall pay a connection charge of$390.00 per unit upon connection to the municipal water system. Such charge shall be collected at the time a building
permit is issued for new construction,or at the time a connection permit is issued for existing structures.
CREDIT TO AREA:
. (1)601-37391 Water Operating
2005 Fee Schedule Page 1 S
SEWER AND WATER UNIT ADJUSTMENT CHARGES
CHARGES
Charges shall result from either an intensification of an existing non-residential use or a new non-residential use that replaces a former use on a
property located within an area already assessed and served by municipal sewer and water.
CREDIT
Credit for previously assessed sewer or water units shall be applied against the total number of sewer and water units established for the new use.
UNIT CHARGE
Each sewer and each water unit adjustment charge shall be equal to the current Service Availability Charge established by the Metropolitan
Council Wastewater Services or its successor and shall be payable to the City of Orono upon application for a building permit.
2004 Fee Schedule Page 16
CONSTRUCTION PERMITS AND INSPECTION FEES
Applicable
Permit Tvne Fee Code Section
ON-SITE SYSTEMS Ch.58,Article II
Design Review Fees Included with permit fees
Subdivision Site Evaluation Report Review $60.00/per new lot
Residential System Permit:
Repair existing system $50.00
New/Replacement System $100.00+$20.00 per each
inspection over 3
(Includes outhouse on Big Island)
Non-Residential System Permit:
New or Total replacement $100.00+$20.00 per each
inspection over 3
Partial replacement $60.00+$20.00 per each
inspection over 3
Annual Service Charge $50.00/system/year plus
an additional$10.00 fee for
late penalty plus 8%
interest for unpaid charges
certified
GRADING,EXCAVATION,FILLING
500 cubic yards or less $50.00(staff permit)+actual
engineering fees if required
($100.00 if engineering fee necessary)
$25.00 per each inspection over lst
501+cubic yards $50.00+Conditional Use Permit
($100.00 if engineering fee necessary)
$25.00 per each inspection over lst
NOTE: 501 cubic yards or more requires a Conditional Use Permit unless approved as part of building permit.
SIGNS
Temporary $35.00
Permanent Per 1997 UBC/SBC Standard Schedule
Minimum$35.00
VEHICLE STORAGE PERMIT $30.00 Sec.78-1577(C)
2005 Fee Schedule Page 17
CONSTRUCTION PERMITS AND INSPECTION FEES(CONT.)
Applicable
Permit Tvpe Fee Code Section
SPECIAL INSPECTION CHARGES
Site Inspection without permit $30.00
(when called by owner)
Inspection surcharge for work or $30.00 per trip+boat rental if
application on Big Island or transportation is not
Deering Island provided by owner
Reinspection fee after failure to comply $30.00 per trip+$30.00 per
with Building,Septic or Zoning Code hour after lst hour
Correction Notice-3rd trip
FIRE PROTECTION Ord.223
Fire Prevention Inspection No Charge
Fire Code Permits $30.00 each
Commercial Fire Alarm Per 1997 UBC Schedule
Plan Review Fee 65%of permit fee
Fire Sprinkler Systems-Commercial $35.00 minimum fee or
1.25% of contract price
Surcharge based on valuation
Kitchen Fire Extinguishing System-Commercial Per 1997 UBC/SBC Standard Schedule
LAWN SPRINKLER SYSTEM $35.00
BURNING PERMITS
Up to 5 times per year No Charge
For Each Reinspection $20.00
More than 5 times per year $100.00
(for all organizations and individuals
regardless of tax status)
CONTRACTUAL INSPECTION SERVICE Per Contract
Monthly Retainer Fee $25.00 per month
(Includes clerical time)
Inspection Charge $25.00 per inspection
Plan Review Charge Per 1997 UBC/SBC Standard Schedule
Clerical Fee(Only charged if clerical $20.00 per hour
use is excessive)
2005 Fee Schedule Page 18
LICENSES&MISCELLANEOUS CHARGES
Applicable
Fee Code Section
COMMERCIAL MARINA LICENSE
Application Fee(initial) $300.00
Renewal Application&Inspection Fee $200.00
(annua!)plus:
Late fee $100.00
JOINT USE DOCK LICENSE
Application Fee(Initial) $50.00
Renewal Application Fee $20.00
Plus each slip $ 2.00
Late Fee $25.00
CANOE RACK RENTAL $40.00/slip
GARBAGE HAULER LICENSE -flat rate $50.00 Ch.54,Article III
-per hauler $ 15.00/truck
-transfer fee $30.00
HOME OCCUPATION LICENSE(Level 2) $100.00 Initial Review Fee Sec.26-76
$30.00 (Annual Review Fee)
TEMPORARY TRAILERS&BUILDINGS $30.00
LICENSE
ZONING DEPARTMENT DOCUMENTS
2000-2020 Comprehensive Plan $75.00
Municipal Code Book-complete $60.00 w/binder
(Ch.1-94 w/revisions)
Municipal Code Book-Portions
_ Ch 78 only(Zoning Code)w/revisions $25.00 loose
Ch 82 only(Subdiv.Code)w/revisions $ 15.00 loose
Other Individual Chapters $ .25/page
Binder $ 5.00
Comp.Plan Amendment#2(Hwy 12) $ 5.00
2005 Fee Sche�lule Page 19
LICENSES&MISCELLANEOUS CHARGES(CONT.)
Applicable
Document Tvae Fee Code Section
GIS and City Maps 8-'/zxll 11x17 17x22 22x34
Black&white $0.25 $1.00 $2.00 S 4.00
Color $2.00 $4.00 $8.00 $16.00
Topographic Information $12.00 per acre+engineering consultant fee
if computer diskette is required
Building&Planning publications As Posted-Prices subject
tochange
General Administrative Licenses/Fines
Tobacco Licenses $100.00 Ch.50,Article II
Licensee or Employee Violations within 24 month period
lst Offense $75.00
2nd Offense $200.00
3rd Offense&Over $250.00
Gambling&Raffle License $ 10.00 Ch.38,Article II
Transient Merchant/Peddler License $100.00 plus actual costs Ch.30
up to$1,500
General Administrative Documents
Listing Information $ 10.00
Assessment Search-Written $20.00/parcel
(Verbal searches not given)
Fax Charge No charge up to 6 pages;$.25 each additional page
Copy Service(for public City records only) $ .25 each
11"x 17" copies $ 1.00 each
Individual copies of Ordinances(1 copy) No Charge
Reprint of Oversized Documents that Cost of copying service,Messenger service&
have been microtilmed Min.Clerical Fee of$5.00(entire amount to be
paid upon request)
Building Plan Copies Cost of Copying,Messenger Service&
Min.Clerical Fee of$5.00(entire amount to be
paid upon request)
Current Street Address Book $25.00
Labels from Utility Billing System $.OS per label(approximately$150.00)
Audio Recording Duplication $ 10.00 per tape
Information Provided on CD $ 10.00 per CD
Mail In Postage and Handling Charge $1.50+actual cost if more than$1.50
2005 Fee Schedule Page 20
LICENSES&MISCELLANEOUS CHARGES(CONT.)
Applicable
Document Tvae Fee Code Section
General Administrative Documents(Continued)
Surcharge for Staff Expense in Excess of Regular Fees
Professional Time $50.00/hour
Clerical Time $30.00/hour
Legal/Engineering Consultants Actual Billed Cost
Mileage/Copies/Postage/Etc. Actual Cost
Electronic Labels $50.00
Returned Check Charge $20.00
DOG LICENSES Sec.62-131 thru 62-135
Biannual License(issued in odd years) $15.00
Annual License(issued in even years only) $ 7.50
I�NNEL LICENSES Sec.62-161 thru 62-185
Commercial Application&Inspection Fee $150.00
(Annual)
Residential Application&Inspection Fee $25.00
(Annual)
NOTE: Dogs kept in residential kennels must be individually licensed.
Residential kennel fee is in addition to dog license fees.
DOGS AT LARGE-RELEASE FEE Sec.62-104
First Offense $55.00
Second Offense $65.00
Third Offense $75.00
After Hours,Weekend&Holiday Release Charge $75.00
ANIMALS AT LARGE(Other than dogs)-Release Fee Ch.62,Article I
First Offense $55.00
Second Offense $65.00
Third Offense $75.00
Trace&Catch Animal $35.00/hour
Trailer Charge $55.00 plus.31 mile
(total distance)
CARE OF IMPOUNDED A1�iIMAL Actual Cost
2005 Fee Schedule Page 21
LICENSES&MISCELLANEOUS CHARGES(CONT.)
Applicable
Permit Tvae Fee Code Section
Police Department Administered
BEER,WINE&LIQUOR LICENSES
Initial Investigation On-Sale/Off-Sale Liquor/3.2 Beer On Sale/ $500.00 per License Ch.34,Article II
3.2 Beer Off Sale/Wine Collected at Application
In state investigation Actual cost up to$10,000
Out state investigation Actual cost
Off:Sale Liquor License $150.00 Sec.34-66
On-Sale Liquor License $5,000.00 Sec.34-66
On-Sale Wine License $2,000.00 Sec.34-77
3.2 Beer Off-Sale(Annual) $ 50.00 Sec.34-66
3.2 Beer On-Sale(Annual) $ 100.00 Sec.34-66
Setup(Annual) $ 100.00 Sec.34-126;34-143
Club Liquor License (weekday) $ 200.00 Sec.34-66
(Sunday) $ 200.00 Sec.34-66
Temporary Set-up Permit(one day) $ 25.00/each Sec.34-42
Temporary Beer Permit(one day) $ 25.00/each Sec.34-82
Lic�uor Violations
1S`Violation $500.00
2"d Violation $1,000&3 day ticense suspension
3`d Violation 52,000&2 week license suspension
4t6 Violation License revocation
AMUSEMENT DEVICE LICENSES Sec.38-601 thru 38-603
Per Establishment(Annual) �100.00+machine fee
Per Machine Fee $25.00 each
PUBLIC DANCE LICENSE(annual) $100.00 Sec.38-501 thru 38-506
(Individual Permit) $ 10.00
LARGE ASSEMBLY PERMIT(over 300 people) $200.00+$60.00 each Sec.38-801 thru 38-803
additional day; actual costs up to$1,500
FIREWORKS PERMIT Sec.70-99
Display of Fireworks/Pyrotechnic Special Effects $50.00
Sale and/or Storage of Consumer Fireworks $50.00
2005 Fee Schedule Page 22
LICENSES&MISCELLANEOUS CHARGES(CONT.)
Applicable
Application Type Fee Code Section
Police Department Administered
FIREARMS DISCHARGE PERMIT Ch.70,Article III
Occasional (limited use) $ 10.00
Game Animals(limited use) $25.00
Annual(Club Only) $25.00
FIREARMS PERMIT TO CARRY $10.00
LIMITED TRAPPING PERMIT $20.00 Sec.70-71
SPECIAL EVENTS PERMIT $50.00 or$200.00 if over Ch.66,Article VI
(Includes Parades,Noise Exemption,Use of Public Property) 200 people; actual costs up to$1,500
FALSE POLICE ALARM USER FEES Ch.42,Article III
First false alarm/calendar year No Charge
Second false alarm/calendar year $50.00
Third false alarm/calendar year $100.00
Fourth false alarm/calendar year $150.00
Fifth and over false alarm/calendar year $250.00
FALSE FIRE ALARM USER FEES Ch.42,Article III
First false alarm/calendar year No Charge
Second false alarm/calendar year $ 75.00
Third false alarm/calendar year $250.00
Fourth false alarm/calendar year $350.00
Fifth&over false alarm/calendar year $500.00 each call
FINGERPRINTING SERVICE $25.00/application for 2 cards-
RESIDENTS ONLY
$13.00 each additional card
(Citizenship No Charge)
2005 Fee Schedule Page 23
LICENSES&MISCELLANEOUS CHARGES(CONT.)
Applicable
Application Tvae Fee Code Section
Police Denartment Administered
COPY SERVICE-Police Records
First Two Copies $ 5.00/first page+$.25 each additional page
Additional Copies $ 0.25 each
SUMMARY DATA REPORT $ 10.00
COPY OF ACCIDENT REPORTS $ 5.00 each
Accident Photos $25.00 minimum or actual cost
COPY OF DRIVER'S LICENSE RECORD $ 5.00 each
COPY FROM MICROFICHE FILE
First Two Copies $ 10.00
Additional Copies $ .50 each
"NO PARKING ORDER OF POLICE" $ 1.00 each
paper signs
(no lath included)
AUDIO TAPE DUPLICATION $ 10.00 each
VIDEO TAPE DUPLICATION $50.00 each
PHOTOGRAPH DUPLICATION
From Negatives $ 5.00 plus the actual cost of duplication
From Digital Camera $ 10.00
SECURITY VIDEO ONTO CD $20.00
STATEMENTS $10.00(transcribed copy or CD when available;
subject to Data Privacy Act)
2005 Fee Schedule Page 24
PUBLIC WORKS DEPARTMENT MISCELLANEOUS CHARGES
Applicable
Application Tvne Fee Code Section
Utilitv Service Rates-Effective beginning First Quarter 2005
MUNICIPAL SEWER RATE by unit: lst $93.90 per quarter
2nd $85.00 per quarter
by flow: $ 3.54/1000 gallon plus
$ 8.85 per quarter per connection
Area#1 Area#2 Area#3
MUNICIPAL WATER RATES Navarre Hwv 12 Chew Chase
Billing&Ready to Serve Chg $26.85/qtr $9.75/qtr $9.75/qtr
Water Usage Rate $2.27/1000 gal $3.15/I000 gal $2.36/1000 gal
Unconnected Property Chg $26.85/qtr -0- -0-
(ready to serve/hydrant chg)
Fee
Federally Mandated Safe Drinking Water$ 5.21 per year on second quarter billing
Testing Program
(Charged per service connection)
Quarterly Service Charge for Non-Functioning $50.00 Ord.218,2"d Series
or Inaccessibie Water Meter
Bulk sale to Minnetonka Beach for Lafayette Ridge Area-Area#1 Rate
$26.85/qtr billing charge plus$2.27/1000 gallon total flow at border meter.
Bulk sale-All Others-$25.00 per location plus area rate per/1,000 gallons.
i.e.Fill swimming pool or watering sod.
Penalty for late payment of sewer/water bills-8% after 30 days from
billing date(applied to the total unpaid balance). Interest at 8% on
unpaid water/sewer bills certi6ed.
Water Turn-On $20.00 Minimum
Water Turn-off $20.00 Minimum
Water System Repair/Replacement if damage caused by property owner:
Labor-Current Aourly Rate
Parts-At Cost
2005 Fee Schedule Page 25
PUBLIC WORKS DEPARTMENT MISCELLANEOUS CHARGES(CONT.1
Applicable
Application Tvne Fee Code Section
MUNICIPAL STORM WATER UTILITY RATES Sec.14-251 thru 14-287
The basic intent of storm water regulations is to minimize the impact of development on natural drainage systems.
Any development in an area will change the natural conditions by increasing the total volume of runoff and the level
of pollutant loading. The storm water utility provides dedicated funds to operate,maintain,manage,construct or
reconstruct the municipal storm water drainage system. Residential properties will be charged one residential unit fee for
each residential unit on the property. Non-residential properties will be charged the appropriate number of residential unit fees
based on the"Residential Equivalent Factor"for the property.
One residential unit: $9.25 per quarter
Non-residential unit: Based on"Residential Equivalent Factor"
RECYCLING CHARGE $23.08/year
Recycling Container-Initial for new residence No Charge
Replacement Container $3.00 each
(including sales tax)
Wheel Kit $5.00
GOLF COURSE CHARGES-Effective date 2005 Season
Monday thru Friday(excluding Holidays)
Begin Play Before 12:00 Noon
lst Nine Holes $ 10.00
2nd Nine Holes $ 8.00
10 Pass(12 punches/9 holes each) $100.00
5 Pass(6 punches/9 holes each) $ 50.00 ,
After 12:00 Noon and Weekend Rates
lst Nine Holes $ 13.00
2nd Nine Holes $ 10.00
2nd Nine Holes(Weekday After 12:00 Noon) $ 8.00
10 Pass(12 punches/9 holes each) $130.00
5 Pass(6 punches/9 holes each) $ 65.00
Senior Citizen(Over 60 years old)
Begin Play Before 12:00 Noon-Weekdays
lst Nine Holes $ 7.00
2nd Nine Holes $ 7.00
Season Ticket(Senior Citizens Only) $170.00
2005 Fee Schedule Page 26
PUBLIC WORKS DEPARTMENT MISCELLANEOUS CHARGES (CONT.)
Applicable
Auplication Tvpe Fee Code Section
GOLF COURSE CHARGES-Effective date 2005 Season (continued)
GOLF CART RENTAL '
Motorized:
After 12:00 Noon and Weekend Rates
lst Nine Holes(After 12:00&Weekends) $ 12.00
2nd Nine Holes $ 10.00
10 Pass(11 punches/9 holes each) $ 120.00
Begin Play Before 12:00 Noon
lst Nine Holes $ 10.00
2nd Nine Holes $ 8.00
10 Pass(11 punches/9 holes each) $100.00
Pull Carts-Per Round $ 2.00
Golf clubs-Per Round $ 3.00
STUDENT RATE(AGES 12-17)
Begin Play Before Noon
Monday-Friday,Excluding Holidays
lst Nine Holes $ 7.00
2nd Nine Holes $ 7.00
FALL GOLF RATES
Will begin the third Monday of September.
-Weekend Rates:
lst Nine Holes $ 10.00
2nd Nine Holes $ 8.00
Riding Cart $ 9.00/per nine
-Weekday Rates:
lst Nine Holes $ 8.00
2nd Nine Holes $ 5.00
Sr.&Jr. $ 5.00
Riding Cart $ 7.00/per nine
CONCESSIONS As Posted
2005 Fee Schedule Page 27
PUBLIC WORKS SUPPLIES&SERVICES
Street or Traffic Signs $100.00/std.sign
(sale includes installation)
Driveway Culverts On Quote Basis
(sale only,not installed)
Water Meter Sales(See Building Permit Section)
Temporary No Parking Signs(without lath) $ 1.00 each
Driveway/Curb-Cut Permits
Individual Driveways $30.00/permit
New Street Intersections(See zoning section-Special improvement fees)
Address Change Request by Owner $50.00 per address
SECTION 3. This ordinance establishing the 2005 Fee Schedule shall be published as a Summary Ordinance in the Laker and Pioneer Newspaper and shall be effective the
week of Jartuary 1,2005.
Adopted by the City Council of the City of Orono on this 13th day of December,2004.
ATTEST:
l
,�� ,�� ���
Lin a S.Vee,City Clerk Barbara A.Peterson,Mayor
2005 Fee Schedule Page 28
INDEX FOR 2005 FEE SCHEDULE
A E M
AccidentReports.........................................................24 Easement Vacation.......................................................3 Mail InPostage and Handling....................................20
AddressBook...............................................................20 Electronic Labels..........................................•••••.........20 Maps For Sale.............................................................20
AddressChange..........................................................28 Marina Licenses..........................................................19 -
Administration Document Copies..............................20 F Mechanical Permit Fees................................................9
After-The-Fact Fees......................................................5 False Alarm User Fees................................................23 Microfiche Copies(PD)..............................................24
Amusement Devices.....................................................22 Fingerprinting(Police)..............................................23 Municipal Water Annual Service Charge.................25
AnimalImpound Fees.................................................21 Fire Alarm Permit......................................................18 Municipal Code Copies...............................................19
Animals at Large.........................................................21 Fire Protection............................................................18 Municipal Water Connection Charge.......................15
Appeal of Administrative Decision..............................4 Fire Sprinkler Permit.................................................18 Municipal Connection Permits(Sewer/Water)...........9
Assessment Search......................................................20 Fireworks Permit Fee.................................................22 Municipal Sewer Annual Service Charge.................25
Audio Recording Duplication...............................20,24
G N
gGambling/Raffle License............................................20 "No Parking°Signs................................................24,28
Beer,Wine&Liquor License.....................................22 Garbage Haulers License...........................................19 Noise Exemption Permit.............................................23
8uildingPermit Fees.....................................................8 Golf Course Charges....................•-•...........................26
Building Plan Copies...................................................20 Grading,Excavating,Filling.....................................l7 O
BurningPermits .........................................................18 On-Site Systems(Septic).............................................17
gOrdinance Copy..........................................................20
C Home Occupation License..........................................19 Outhouse Construction(See On-Site Systems).........17
CanoeRental Slip........................................................19 Oversized Document Reprint.....................................20
CD(Information provided on)...................................20 I
Certificateof Occupancy..............................................8 Impound Fees..............................................................21 P
CodeBook Copies.......................................................19 Information Provided on CD.....................................20 Parades Permit............................................................23
Commercial Site Plan Review......................................2 Industrial Revenue Bond Appl....................................4 Park Dedication Fees....................................................6
Commercial Marina License......................................19 Inspections...................................................................l8 Peddier/Transient Merchant License........................20
ComprehensivePlan Amendment................................2 Plumbing Permit...........................................................9
Comprehensive Guide Plan Copies............................19 J Public Dance License..................................................22
Conditional Use Permit Fees........................................1 Joint Use Dock License...............................................19 Public Works Supplies&Services.............................28
ConnectionCharges...............................................10-16 PUD Rezoning...............................................................2
Contractual Inspection Service..................................18 K
CopyCharges-Administration.................................20 Kennel License............................................................21 R
Copy Microfiche File-PD..........................................24 Kitchen Fire Extinguishing System...........................18 Raffle License..............................................................20
Copy Service-Police Dept.........................................24 Recycling Charge........................................................26
Culverts........................................................................28 L Recycling Replacement Bins......................................26
Labels from Utility Billing.........................................20 Reprint Oversized Documents On Microfilm...........20
DLarge Assembly Permit..............................................22 Retaining Walls.............................................................8
DanceLicense..............................................................22 Lawn Sprinkler System.............................................18 Returned Check Charge.............................................20
DemolitionPermit Fee..................................................8 Licenses..................................................................19-22 Rezoning Application Fee.............................................2
Docks-Commercial......................................................8 Limited Trapping Permit...........................................23 Rip Rap Application Fee..............................................4
Docks-Residential........................................................8 Liquor Licenses...........................................................22
DogLicense..................................................................21 Listing Info-Realtors ...............................................20 S
Dogs at Large..............................................................21 Sanitary Sewer Connection Charge...........................10
Driver's License Record.............................................24 Septic Annual Service Charge....................................17
Driveway/Curb Cut Permits......................................28 Septic System Permits.................................................17
DrivewayCulverts......................................................28
2005 Fee Schedule Page 29
S(cont.)
Sewer Connection Permit Fees.....................................9 V
Sewer Projects(1963-1973)........................................10 Vacation Application Fees...........................................3
Sewer Projects(1980-1992)..................................1 l,12 Variance Application Fees...........................................1
Sewer Projects(1997-2000)........................................13 Vehicle Storage Permit...............................................17
Sewer Projects(Lift Stations)....................................14 Video Tape Duplication(PD).....................................24
SewerRates.................................................................25
Signs.................................................................17,24,28 W
SketchPlan....................................................................2 Water Connection Permit Fee.....................................9
SpecialEvent Permits.................................................23 Water Meter Fees.........................................................9
Special Improvements Application..............................4 Water Projects............................................................IS
SpeciaiInspection Charges.........................................18 Water Rates................................................................ZS
SpecialAssessment Searches......................................20 Water Turn-Off Charge.............................................25
Sprinkler Systems-Commercial aad Lawn..............18 Water Turn-On Charge.............................................25
Stormwater/Drainage Trunk Fees...............................7 Wheel Kits for Recycling Bins...................................26
StormwaterUtility......................................................26
Street Address Book....................................................20 Z
Street Signs(Public Works).......................................28 Zoning Amendments.....................................................3
Subdivision Application Fee.........................................3 Zoning Document Copies...........................................19
SummaryData Report................................................24
Surchargefor Staff Expense........................................5
T
Tape Duplication(Admin)-Audio............................20
Tape Duplication(PD)-Audio-••••..............................24
Tape Duplication(PD)-Video...................................24
Temp."No Parking„(P.W.)Signs.............................28
Temp."No Parking"(P.D.)Signs..............................24
Temporary&Permanent Signs.................................17
Temporary Trailer/Building .....................................19
TobaccoLicense..........................................................20
TopographicInformation...........................................20
TrafficSigns................................................................28
Transient Merchant License......................................20
TrappingPermit..........................................................23
TreeRemoval................................................................8
U
UndergroundTank Removal........................................9
Unit Adjustment Connection Charge........................16
Useof Public Property................................................23
Utility Rate Annual Service Charge....................17,25
2005 Fee Scheciule Page 30