Loading...
HomeMy WebLinkAboutOrd #005-3rd Ser/Adopting 2004 fee schedule , , �' ORDINANCE NUMBER 5 ,THIRD SERIES SUMMARY APPROVED The Council hereby determines that the text of the summary of this ordinance marked"Official Summary of Ordinance Number 5 ,Third Series," and a copy of which is attached hereto,clearly informs the public of the intent and effect of the ordinance. The Council further determines that the publication of the title and such summary will clearly inform the public of the intent and effect of the ordinance. SUMMARY OF ORDINANCE NUMBER 5 .THIRD SERIES ORDINANCE NO. 5 ,THIRD SERIES AN ORDINANCE ADOPTING THE 2004 FEE SCHEDULE AND REPEALING ORDINANCE NO. 224, SECOND SERIES The following is the official summary of Ordinance Number 5 ,Third Series approved by the City Council of the City of Orono on December 8, 2003. The following sections have changes, additions and/or deletions: CODE DESCRIPTION 2003 FEE 2004 FEE SEC. ZONII�TG APPLICATIONS VARIANCE 78-42;78- Base Fee �59 600.00 96 thru 99 Additional variances(included in base fee) (Additional variances included in base fee for 2004) �� Variance Renewal(no change from �-SA 250.00 78-42;78- original application) 96 thru 99 CONDITIONAL USE PERMIT(One charge �g�2;�g_ per project) 913 Residential Accessory Use(Animals,etc.) �-3�AA 600.00 Insriturional Use(School,Church,etc.) �-58:A9 600.00 Duplex Credit(per building) �AA 600.00 Guest House/Guest Apartment �AA 600.00 CommerciaUindustrial Use �5:9A 600.00 Non-Conforn7ing Use(Finding of Similar Use) �3$ 600.00 Land Alterarion: �-SA:A�+pernut 600.00+pernut -Grading&filling-designated wetland/floodplain -Grading,filling,etc.(over 500 cubic yards) -Sea walls,retaining walis within 0-75'lakeshore Renewal Condirional Use Pemut �SA:AA 250 (No change from original applicarion) �aa Q�c nn r.e,,,,w. (Included in base CUP fee for 20041 PLANNED DEVELOP�iENT Ch. 78, RPUD OR PRD Application with Subdivision Fee plus$35.00 per Subdivision Fee plus$35.00 per Article VI Subdivision dwelling unit dwelling unit RPUD OR PRD Applicarion without 540.00 per dwelling unit $40.00 per dwelling unit Subdivision fminimum�A9} (minimum 600.00 PID Applicarions(5 acre minimum per code) S 175.00 per acre(minimum $175.00 per acre(minimum c���} 875.00 PUD RezoIling(Highway 12 Corridor Only) Residenrial: �g�+$40.00 per dwelling 600.00+$40.00 per dwelling unit unit CommerciaUIndustrial: �175.00 per acre(minimum $175.00 per acre(minimum �� 875.00 Page 1 of 6 CODE DESCRIPTION 2003 FEE 2004 FEE SEC. COMMERCIAL SITE PLAN REVIEW $�?3:A�+Consultant Fees 600.00+Consultant Fees 78-42 SUBDIVISION Sketch Plan(Class I,II,&III) $�S:A9 350.00 82-85 Basic Subdivision Applicarion $49�:89 600.00 82-112 (Class I&II Subds,Lot Line (a)(b) Rearrangement) Preliminary Plat Review $4A�A�+$30.00/lot 750.00+$30.00/lot (Class III and all non-residential) Filing Fees: a)Subdivision only $�99-minimum plus any 140.00 Minimum plus any (Base covers�/2 hr legal) addirional costs additional costs b)Subdivision+Easements&Covenants $�A:A�minimum plus any 280.00 minimum plus any (Base covers 1 hr legal) addirional costs additional costs Renewal of Subdivision��ea $�A9 300.00 Approval (Class I,II&III and Subdivision of a Lot Line Rearrangement) (No Changes&om Original�� A�uroval) VACATIONS 7g-42 Public Road $75.00 per benefitting property $75.00 per benefitting properry {$-39A:A�minimum per 600.00 minimum per applicarion) application) Easement Vacations Not Associated with $�9A�A 600.00 Subdivision Applicarions ZONING AMENDMENTS INCLUDING $339:9A 600.00 78-42 REZONING REQLTEST TO AMEND �3�-5:A9 600.00 78-42 COMPREHENSIVE PLAN -;��;�.� �zw�=r:�.: .��� ;� �,.,�;,. ;�-: * �;� $ �..f_ �:�-.�; ;.���- '�g_� .�`w, '. �.,. CONSTRL�CTit}At FTRiI�IITS�AND�NSPEG�'I�JI�FEES^';-. .���. . . . , . w���;;;' �. . , , � ;�<�� . PLUMBING PERMIT Replacement of residenrial fixture or 15.00 appliance(meets code requirementsl MECHANICAL PERMIT Replacement of residenrial fixture or 15.00 appliance(meets code requirements) LICENSES&MISCELLANEOUS CIiARGES DOCUMENT TYPE GIS and Citv Maas 8-1/2x11 l 1x17 8-1/2x11 l 1x17 17x22 22x34 Black&white $0.25 $1.00 $0.25 $1.00 2.00 4.00 Color $�39 2.00 $4.00 8.00 16.00 General Administrative Documents Assessment Search $�K:AA 20.00 Informarion Provided on CD 10.00 Page 2 of 6 CODE DESCRIPTION 2003 FEE 2004 FEE SEC. General Administrative Documents(cont.� Mail in posta�e and handling char�e S 1.50+actual cost if more than 51.50 Surchar�e for Staff Expense in Excess of Regular Fees Professional Time 550.00/hour Clerical Time S30.00/hour Le�gineering Consultants Actual Billed Cost Milea e�/Copies/PostageStc. :�ctual Cost Police Department Administered Beer,Wine&Liquor Licenses Ch. 34, Initial Investigation $�;AA�per License S500.00 per License Article II Temporary Set-up Permit(one day) �3A:AA/each 525.00/each 34-42 Temporary Beer Pernut(one day) $3A:AA/each S25.00/each 34-82 $�A=A9 Page 3 of 6 SEWER PROJECTS Unit Char¢e+ Area or Acre Chee Credit to Area 2003 2004 ty District-Project 1963 ST-lA,LS-lA,ST-1B,LS-1B $3�84A8 5 825.00 (1) 1964 LS-lA or LS-1B $3�8&89 5 825.00 (1) 1965 LS-1 $3�8�9A 5 825.00 (1) 1965 LS-lA $3�88:9A 5 825.00 (1) 1967 LS-i $3�8�98 $5.825.00 (1) 1969 LS-1 Shore Hills �4;33�A9 $14,535.00 (1) 1969 LS-2 Chery Chase �1-A;A�A9 11 370.00 (1) 1970 LS-1 Saga Hill $-�A;A�:A9 $11370.00 (1) 1971 LS-1 Dunwoody �A;B��AA $11.370.00 (1) 1973-1 �4;33�A8 14 535.00 (1) 1980-1 Minnetonka Bluffs Q''',�-m:w $12,615.00 (1) 1980-1 West Femdale/County Road 15 $�S�3a:8A $29305.00 (1) 1980-1 Orono Lane $��5�99 �23,450.00 (1) 1980-1 County Road 15/Marinas $�9-5:8A 9 820.00 (1) 1980-2 North Shore Drive/Scotch Pine Ln $�8;9-.'�A9 29 305.00 (1) 1981-1 North Shore Drive/Highwood $�4;8�:9A $15,085.00 (1) 1982-1A Navarre Utilities $3�6-5-A9 3 205.00 Tnmk Area$�99:99 1315.00 (1) 1982-1B Navarre Utilities Northem Ave $3-�3:9A 520.00 $3;43�AA_$3,475.00 Per Acre (1) 1985-1 Crystal Bay $�3;A�AA $15,260.00 (1) 1983-1 Highway 12 Orono-Long Lake-Medina $�47�A9 1 495.00 (1) 1989 Highway 12 $�4�A 5 510.00/acre (1) 1992 Stubbs Bay Sewer I Stubbs Bay NE/NW-Bayside East $��3A:A9 17 170.00 (5) II Bederwood Q''�� ,0-'�09 26 590.00 (5) III Bayside North Q",�=� $22,515.00 (5) N Oxford �3�A:A9 31 780.00 (5) V Cygnet and Leaf Q''�,���0 25 685.00 (5) 1997 Sewer 97-1 North L.L./L.L.C.C. $�;98�A9 22 370.00 (6) 97-2 Bracketts Point �:9A 37 244.00 (6) 97-3 BayRidge $�9;�39:AA $19,885.00 (6) 1998-1999 Sewer 1998 Shoreline/Heritage $-�5;3�-i89 18 785.00 (7) 99-1 Orono Orchard $�4;449:AA 24 760.00 (7) 99-2 Edgewood Hills �;BCA:AB $31.465.00 (7) 2000 Sewer 2000-1 Webber Hills $S;A-58:89 8 155.00 Excludes Grinder Allowance (8) 2000-2 Fox Ridge $��A9 18 000.00 Excludes Grinder Allowance (8) 2000-3 East Long Lake $�4,�A�A9 $14,290.00 Excludes Grinder Allowance (8) 1984 Forcemain and Lift Station#7 #6 Bv Pass= #7 Forcemain Credit to Area Existing Properties/Increase �3S8:A9$590.00 (4) New Bldgs Replacing Existing Bldgs �588:89 590.00 (4) New Residenrial w/Existing Stub $�3:99 1 685.00 (4) New Residenrial without Stub $�A:�A�5�2�.00(11 $�89$1,685.00(,4� (1)and(4) Freshwater Biological(1nct. •Marsh at Lafayette•[..o�s> �8�8{�5�25.00(11 $6-SA:AA$660.00(4) (1)and(4) 1989 Gravity Line and Lift Station Figed Charge+ #10 Bv Pass Credit to Area (see map for affected areas) $225.00 $�;�3A:A8$2,970.00 (1) Page 4 of 6 WATER PROJECTS Unit Charee+ Area/Acreage Front Foot Credit to Area By District-Project $4;893:�A 4 960.00 $3�48 36.85 (1) 1967 LW-1 Highway 12/Crystal Bay Road $4;89�AA 4 960.00 (1) 1969 LW-2 Chevy chase Q',"�w 2 455.00 $�4:�3 24.55 (1) 1970 LW-i Navarre Residenrial $�48:A8 3 690.00 $3�4A 36.90 (1) 1970 LW-1 Navarre Commercial Q'',`� 2 620.00 (1) 1982-1A Navarro $�8;9�93:99- 9 110.00/acre (1) 1989 Highway 12 $4AA:AA 405.00 (1) 1999 Navarre Water Treatment Plant Rehabilitarion PUBLIC WORK.S DEPARTMENT MISCELLANEQUS CIiARGES - MUNICIPAL SEWER RATES by unit: 2003 Fee 2004 Fee 1 st $88:8-3 per quarter 91.35 per quarter 2nd $8A:SA per quarter 82.75 per quarter by flow: $�-?r.��/1000 gallon plus 3.44/1000 gallon plus $-5:3�per quarter per 8.60 per quarter per connection connecrion MUNICIPAL WATER RATES Navarre Area Billing&Ready to Serve Chg $-�5:45/qtr 26.15/qtr Water Usage Rate $ �3/1000 gal 2.21/1000 gal Unconnected Property Chg $�-5�-5/qtr 26.15/qtr Highway 12 Area Billing&Ready to Serve Chg $-9��/qtr 9.50/qtr Water Usage Rate �2�8/1000 gal 3.06/1000 gal Chevy Chase Area Billing&Ready to Serve Chg $-9��/qtr 9.50/qtr Water Usage Rate $-�4/1000 gal(no change) 2.30/1000 gal(no change) Bulk sale to Minnetonka Beach for Lafayette Ridge ��4-45/qtr billing charge plus 26.15/qtr billing charge plus Area $�:�5/1000 gallon total flow at 2.21/1000 gallon total flow at border meter border meter GOLF COURSE CHARGES-Effective date 2004Season Monday thru Friday(eacluding Holidays Begin Play Before 12:00 Noon 2003 Fee 2004 Fee 1 st Nine Holes $ 10.00 $ 10.00 2nd Nine Holes $-�:9A 8.00 After 12:00 Noon and Weekend Rates 1 st Nine Holes �2:AA 13.00 2nd Nine Holes $--9:AA 10.00 2°d Nine Holes(Weekday After 12:00 I�oon) $-�AA 8.00 League Rates Monday thru Friday $-�&A9 11.00 Page 5 of 6 GOLF COURSE CHARGES,Continued 2003 2004 Senior Citizen(Over 60 years old) Begin Play Before 12:00 Noon-Weekdays lst Nine Holes �--�39 7.00 2nd Nine Holes $--�39 S 7.00 Season Ticket(Senior Citizens Only) �9- S 170.00 FALL RATES Will begin the third Monday of September Weekend Rates: 1 st Nine $ 10.00 S 10.00 2nd Nine �-�:9A S 8.00 Riding Cart $-�-ABEa�e S 9.00/nine Weekday Rates: 1 st Nine $�-�A9-- S 8.00 2nd Nine $-4AA— S 5.00 Sr.&Jr. �--4:A�- S 5.00 Riding Cart $-�AB�e S 7.00/nine GOLF CART RENTAL Motorized: lst Nine Holes(After 12:00&Weekends) ��A9 12.00 2nd Nine Holes $-9:A9 � 10.00 Begin Play Before 12:00 Noon 1 st Nine Holes �-9�9A 5 10.00 2nd Nine Holes �-�?A8 S 8.00 Pull Carts-Per Round $--�SA- S 3.00 Golf clubs-Per Round $ 3.00 S 3.00 STUDENI'RATE(AGES 12-1� Begin Play Before Noon Monday-Friday,Excluding Holidays 1stNineHoles $--C3A S 7.00 2nd Nine Holes $-639 S 7.00 A printed copy of the 2004 Fee Schedule Ordinance is available for inspection by any person at the office of City Clerk during regular office hours. This ordinance becomes effective the week of January 1,2004. Adopted by the City Council of the City of Orono on this 8th day of December,2003,by a vote of 5 a and 0 nays. ATTEST: U�� Lin a S. Vee, City Clerk Barbara A. Peterson,Mayor Published in the Laker/Pioneer newspapers the week of Decem�er 20, 2003. Page 6 of 6 2004 FF,� SCHFDULF DIRECTORY - Copy Charges Page Licenses&Miscellaneous(Cont) Page Permits(Cont) Page Administration 20 Garbage Haulers License 19 Sprinkler Systems- Accident Reports 24 Home Occupation License 19 Commercial 18 Audio Recording Duplication 20 Joint Use Dock License 19 Tree Removal 8 Building Plan Copies 20 Kennel License Z1 Underground Tank Removal 9 Copy Microfiche File-PD 24 Returned Check Charge 20 Water Meter Fees 9 Copy Service-Police Dept 24 Solicitation License 20 Driver's License Record 24 Temporary TrailerBuilding 19 Services Information on CD 20 Tobacco License 20 Fingerprinting(Police) 23 Reprint Oversized Documents Transient Merchant/Peddler License 20 Water Turn-Off Charge 25 On Microfllm 20 Water Turn-On Charge 25 Summary Data Report 24 Maps For Sale 20 Tape Duplication(Police Dept.) Signs Audio 24 Public Works Supplies&Scrvices Street Signs(Public Works) 28 Video 24 Address Change 28 Temporary&Permanent 17 Driveway Culverts 28 Temp."No Parking"(P.D.) 24 Connection Charges Driveway/Curb Cut Permits 28 Temp."No Parking"(P.W.) 28 Sanitary Sewer 10 Municipal Water 15 Permits Utility Rate&Miscel[aneous Unit Adjustment 16 After-The-Fact Fees 5 Annual Service Charge- Building Perm[t Fees 8 Septic 17 Documents Burning Permits 18 Municipal Sewer 25 Comprehensive Guide Plan 19 Cert.of Occupancy 8 Municipal Water 25 Current Street Address Book 20 Demolition Permit Fee 8 Recycling Charge 26 Labels 21 Docks: Recycling Replacement Bins 26 Listing Info-Realtors 20 Commercial 8 Stormwater Utility 26 Mail In Postage&Handling 20 Residential 8 Municipal Code/Ordinance 19 Fire Protection 18 ZoningApplications Special Assessment Searches 20 Fireworks Permit Fee 22 After-The-Fact Fees 5 Grading,Excavating,Filling 17 Amendments 2 False Alarm User Fees 23 Large Assembly Permit 22 Appeal of Admin.Decision 4 Lawn Sprinkler System 18 Commercial Site Plan 2 GoljCourse Charges 26 Limited Trapping Permit 23 Comprehensive Plan Amend 2 Mechanical Permit Fees 9 Conditional Use Permit Fees 1 lnspections Municipal Hook Up Industrial Revenue Bond Appl. 4 Contractual lnspection Service 18 (Sewer/Water) 9 Park Dedication Fees 6 Special Inspection Charges 18 On-Site Systems(Septic) 17 PUD Rezoning 2 Outhousc Construcffon 17 Rezonin�Applic�tion �ec 2 Llcri�►rs&Mlscr//anrous (See Un-Slte Systems) Nlp Rap Applicatlon Fee 4 After-The-Fact Fees 5 Special Events 23 Special Improvements Appl. 4 Amusement Devices 22 Plumbing Permit 9 Stormwater/Drainage Trunk Fees 7 Animal Impound Fees 21 Retaining Walls 8 Subdivision Appiication Fee 3 Beer,Wine&Liquor License 22 Surcharge for Staff Expense 5 Canoe Rental Slip 19 Vacation Application Fees 3 Commercial Marina License 19 Variance Application Fees 1 Dog License 21 Public Uancc License 22 *Indez Beglns on 1'agc 29 Gambling/RafOe License 20 ORDINANCE NO. 5 ,THIRD SERIES AN ORDINANCE ADOPTING THE 2004 FEE SCHEDULE - AND AN ORDINANCE REPEALING ORDINANCE NO.224,THIRD SERIES The City Council of the City of Orono ordains: SECTION 1. Ordinances Repealed. Ordinance No.224,Second Series,entitled 2003 Fee Schedule is hereby repealed. The City Council of Orono per Section 2-171 of the Municipal Code hereby ordains the following fees effective during the calendar year 2004: SECTION 2. Fees. ZONING APPLICATIONS All fees are aaalication fees and are non-refundable after staff work has begun on the application. Applicable Application Type Fee Code Section VARIANCE Base Fee(Additional variances included in base fee for 2004) $600.00 Sec.78-42; 78-96 thru 99 Renewal Variance $250.00 Sec.78-42;78-96 thru 99 (No change from original application) After-the-Fact Fees Double Application Fee Res.#1306&#1309 CONDITIONAL USE PERMIT(One charge per project) Sec.78-42;78-913 Resldentlal Accessory Use(Animals,etc.) $600.00 Institutional Use(School,Church,etc.) $600.00 Duplex Credit(per building) $600.00 Guest House/Guest Apartment $600.00 CommerciaUIndustrial Use $600.00 Non-Conforming Use(Finding of Similar Use) $600.00 2004 Fee Schedule—Page I ZONING APPLICATIONS(CONT.) Applicable Application Type Fee Code Section CONDITIONAL USE PERMIT Continued(One Charge per Project) Sec.78-42;78-913 Land Alteration: $600.00+permit -Grading&filling-designated wetland/tloodplain -Grading,�lling,etc.(over 500 cubic yards) -Sea walls,retaining walls within 0-75'lakeshore Amend Existing CUP $600.00 Renewal Conditional Use Permit $250.00 (no change from original application) Conditional Use Permit with Variance(included in base CUP fee tor 2004) After-the-Fact Fees Double Application Fee Res.#1306&#1309 PI,ANNED DFVELOPMF,NT ItPUU or 1'Itll Applicatlon witl�Subdivision Subdivlsion Fee plus$35.00 per dwelling unit RPUD or PRD Application without Subdivision $50.00 per dwelling unit (minimum$600.00) PID Applications(5 acre minimum per code) $175.00 per acre (minimum$875.00) PI1D Rezoning(Hi�hway 12 Corridor Only): Ch.78,Articic VI Residentlul $600.00+$40.00 per dwelling unit CommerciaUlndustrial $175.00 per acre (min.$875.00) COMMF.RCIAT.SITF.PI.AN RF.VIF.W $600.00+Consultant Fees Sec.7�-42 'LUNINC AMLNbMLN'1'51NCLUUINC ItL'LONING $600.00 Sec.78-42 REQUEST TO AMEND COMPREHENSIVE PLAN $600.00 Sec.78-42 2004 Fee Schedule—Page 2 ZONING APPLICATIONS(CONT.) Applicable Apalication Tvae Fee Code Section SUBDIVISION Sketch Plan(Class I,II,&III) $350.00 Sec.82-85 Basic Subdivision Application $600.00 Sec.82-112(a)(b) (Class I&II Subdivisions,Subdivision of a Lot Line Rearrangement) Preliminary Plat Review $750.00+$30.00/lot Sec.82-112(c) (Class III and all non-residential) ($810/21ots; $840/31ots; $870/41ots,etc.) Final Plat Review(Class III) $250.00+Special LegaUEngineering/ Consultant Charges Sec.82-142(9) Filing Fees:a)Subdivision onty $140.00 Minimum plus any Sec.82-142(11) additional costs b)Subdivision+Easements&Covenants $280.00 Minimum plus any additional costs Renewal of Subdivision Approval $300.00 (Class I,II &III,and Subdivision of a Lot Line Rearrangement) (No Change From Original Approval) VACATIONS Pubtic Road $75.00 per beneftting Sec.78-42 property ($600.00 minimum per application) Easement Vacations with Subdivision Applications $100.00 Sec.78-42 Easement Vacations not Associated with Subdivision Applications $600.00 Sec.78-42 2004 Fee Schedule—Page 3 ZONING APPLICATIONS(CONT.) Applicable Application Tvpe Fee Code Sect�on SPECIAL IMPROVEMENTS Sec.82-213(4) Non-refundable charges for City Engineer's review for applications and design drawing,including construction inspection fees. If improvements are proposed as part of a Subdivision,Review Charges are payable with Preliminary Plat application. Proposed Private Roads $650.00 plus SOEflineal foot Proposed Public Roads $950.00 plus SOE/lineal foot Request for City to accept eaisting private road $950.00 Request for City to maintain unimproved public road $225.00 Proposed Sanitary Sewer Main Eztension $275.00 plus$25.00 per stub Proposed Watermain Eatension $275.00 plus$25.00 per stub Proposed Storm Sewer System(eacluding culverts) $250.00 On-Site System-Site Evaluation Review $60.00 per new lot proposed (applicable to rural subdivision applications) for on-site RIP-RAP Staff Review(normal rip-rap) No Charge(MCWD Permit Required) Unusual Rip-Rap:a)New installation $100.00+CUP review b)Repair previously approved Staff permit=$100.00 APPEAL OF ADMINISTRATIVE DECISION $100.00 Sec.78-99 INDUSTRIAL REVENUE BOND APPLICATIONS Minimum Project Valuation:$250,000.00 Application Fee: 0.1%of project valuation ($250.00 minimum)plus $5,000.00 deposit for IegaU administrative ezpenses 2004 Fee Schedule—Page 4 ZONING APPLICATIONS(CONT.) Applicable Application Tvae Fee Code Section SURCHARGE FOR STAFF F.XPENSE IN F.XCESS OF APPLICATION FEES Sec.78-42 Per Fee Schedule set forth below: Professional Time $50.00/hour Clericat Time $30.00/hour LegaUEngineering Consultants Actual Billed Cost Mileage/Copies/Postage/Etc. Actual Cost AFTER-THE-FACT APPLICATION INVESTIGATION FEES(Resolution 1306) (Applies to all application types including variances,conditional use permits,subdivision, zoning amendments,rip-rap permits,special improvement reviews,grading permits,moving permits,business licenses,kennel licenses,all building permits and all general permits.) This permit fee may be waived by staff for resident property owners who have not involved a contractor in their work,have no previous history of work without a permit and where such work does not entail any zoning violations. Whenever any work,use or division of land for which a formal application is required has been commenced without Crst making such application and receiving City approval therefore,a special investigation of the circumstances shall be made during the application process. Because of the extra administrative costs involved in the special investigation,the minimum �pplication fee for after-the-fact applications shall be twice the fee set forth in the basic fee schedule,whether or not the application is thereafter approved or denied. Payment of an after-the-fact application fee shall not constitute approval or authorization of the work,use, or division of land,and shall not constitute a penalty or a waiver of the right of the City to institute civii or criminal legal actions against the applicant for commencing such work,use or division of land without the required prior approval of the City. After-the-fact Investigation Fee Amount: Equal to and in addition to the basic fee amount(total fee is twice the basic fee amount). Res.1306 2004 Fee Schedule—Page S ZONING APPLICATIONS(CONT.I Applicable Fee Code Section PARK DEDICATION FEES I Sec.82-227 Land Dedication Minimum Area-Subdividers shall be required to dedicate to the City for parks,playgrounds,trails,open spaces and other public purposes as a minimum that percentage of gross land area,or other such amount as may be determined by the City Council,as set forth below: (1) Residential/Agricultural/Multiple Residential Zoned Land. Dedication requirement of 8%of the land being platted or subdivided. (Eaclusive of lot that includes an eaisting residence.) (2) CommerciaUIndustrial Zoned Land. Dedicated requirement of 8%of the land being platted or subdivided. Cash Contribution in Lieu of Lands. In those instances where a cash contribution is to be made by the subdivider,in lieu of a conveyance or dedication of land,the cash contribution to be contributed shall be equivalent to the fair market value of the equivalent undeveloped land that would otherwise have been conveyed or dedicated. The City shall account for such funds in a special fund named Park Dedication Funds. The City Council has established by resolution a minimum residential park fee of Res.4738(12-10-01) $3,250 per dwelling unit and a maximum of$5,550 per dwelling unit. 'I'I�c City Councll I�as cstablished by resolution a minimum commercial/industrial park fcc of Res.4739(12-10-01) $8,125 per acre and a maximum of$13,875 per acre. 2004 Fee Schedule—Page 6 ZONING APPLICATIONS(CONT.� Anplicable Fee Code Section - STORM WATER AND DRAINAGE TRUNK FEES Sec. 14-281 thru 14-287 Storm water trunk fees apply to new development and redevelopment of existing properties and provide funding for the storm water infrastructure necessary to serve the City. The trunk fee is based on the land use and acreage of the property being developed. An equivalency factor multiplier is assigned to each land use type,with a 2-acre residential lot considered as the standard in the City with an equivalency factor of 1.0. The table below lists the storm water trunk fees per acre for the various zoning districts and land uses in the City,with a base fee of$2,700 per acre. 2003 Storm Water and Drainage Trunk Fees New Development Trunk Fee/ (1)Buffer Easement Reduction.For the 5-acre zoning Land Use AC1'e district,a reduction of up to 50%of the trunk fee for the lot will be allowed for the percentage of the lot protected by Single Family Residential 5 Acre Zone(1) $2,160 P��ter and/or drainage way buffer easements.These buffer easement areas shall remain in a natural condition. Single Family Residential 2 Acre Zone $2.�� (2)Maximum Fee.For the 5-acre zoning district,any lot exceeding 7.0 gross acres including wetland,shall be Single Family Residential 1 ACre Zone $3,510 charged a mazimum trunk fee equal to the trunk fee for a 7.0 acre parcel.Such lot shall remain eligible for the up to 50% Single Family Residential %z Acre Zone $4,050 reduction noted in(1)above,such reduction based on the percentage of 7.0 acres that is placed in buffer easements. Multi Family Residential 4 Units/Acre or Less $4,860 (3)Maximum Fee.For the 2-acre wning districts,any lot exceeding 4.0 gross acres including wetland,shall be Multi Family Residential Greater than 4 Units/Acre $5,670 charged a maximum trunk fee equal to the tn,nk fee for a 4.0 acre parcel." Commercial or Industrial $6,480 Redevelopment projects will bc defined as any project to either remove and replace existing structures or to enlarge existing structures. These projects will be charged a portion of the base trunk fee adjusted for the area of expansion of impervious surface above the existing conditions. The table below lists the base trunk fee based on the area o[impervious surface expansion and adjusted for the type of land use. The trunk fee shall be determined by multiplying the appropriate fee by the acreage of the development site. Area of Impervious Surface Residential Redevelopment or Expansion Commercial or Industrial Expansion of Existing Development Redevelopment or Expansion of Existing Trunk Fee/Acre Development Trunk Fee/Acre 0-1000 Square Feet $950 $2,270 1000-2000 Squaze Feet $1,890 $4,535 More than 2000 Square Feet $2,700 $6,480 2004 Fee Schedule—Page 7 CONSTRUCTION PERMITS AND INSPECTION FEES Applicable Permit Tvae Fee Code Section BUILDING PERMIT Ord.216 Minimum Fee $23.50 Normal Fee (per 1997 UBC/SBC Standard Schedule) Plan Review Fee: Commercial (per 1997 UBC/SBC Standard Schedule) Residential 65%of Building Permit Fee Building Valuation Standard (per Current I.C.B.O.Building StandardsBuilding Valuation Data) ZONING CERTIFICATE OF OCCUPANCY WITHOUT BUILDING PERMIT $50.00 (change in use) RETAINING WALLS(in ezcess of 42" also $23.50 minimum multiple tiered walls that ezceed 42" (per 1997 UBC/SBC Standard Schedule) and not located in lakeshore protected area) NOTE: Retaining walls in 0-75'lakeshore protected zone-see Cond.Use Permit section of fee schedule. TREE REMOVAL WITHIN 0-75' $30.00 Sec.78-281 thru 78-283 DOCKS-RESIDENTIAL $30.00 (Permanent(CUP Required)and Initial Seasonal] DOCKS-COMMERCIAL Per 1997 UBC/SBC Standard Schedule DEMOLITION PERMIT Ord.216 Principal Structure $50.00 Initia!inspection $25.00 for each requested or required inspection beyond initial inspection Accessory Structure $30.00 Initial inspection 2004 Fer ^-hedule—Page 8 CONSTRUCTION PERMITS AND INSPECTION FEES(CONT.) : Applicable Fee Code Section Permit Tvpe — PLUMBING PERMIT 1.25%of contract price or Minimum Fee for Plumbing Permit $35.00 minimum per project Replacement of residential fiature or appliance(meets code requirements) $15.00 Mail-in postage&handling charge $ 1.50 MECHANICAL PERMIT Residential SinQle Familv&Duplex bv Unit Tvpe Minimum Fee for Mechanical Permit 1.25%of contract price or $35.00 minimum per project Replacement of residential Gature or appliance(meets code requirements) $15.00 Mail-in postage&handling charge $ 1.50 Under Ground Tank Removal Per mechanical permit fees Commercial Industrial&Multi-Familv Residential bv Unit Tvae $35.00 minimum fee or 1.25%of contract price MUNICIPAL CONNECTION PERMIT(together with area connection charges) Sewer $35.00 Water S 35.00 5/8"(3/4"g7%:")meter including sales tag $130.00 3/4"(3/4"a9")meter including sales tag $180.00 1" meter including sales taz $260.00 larger meter quote basis Mail-in postage&handling charge $ 1.50 (sewer and water permits only) 2004 Fee Schedule–Page 9 ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES(If not previousty assessed or if an improvement project is not deemed to be required in the sole discretion of the City. If an improvement is required,the connection charge may be in addition to any assessment.) The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be charged the connection fee for that area. Such connections are subject to City Council approval. SEWER PROJECTS By District-Project Unit Charge+ Area Or Credit To Area Acrea e Char e 1963 ST-lA,LS-lA,ST-1B,LS-1B $5,825.00 1 1964 LS-lA or LS-1B $5,825.00 1 1965 LS-1 $5,825.00 1 1965 LS-lA $5,825.00 1 1967 LS-1 $5,825.00 1 1969 LS-1 Shore Hills $14,535.00 1 1969 LS-2 Che Chase $11,370.00 1 1970 LS-1 Sa a Hill $11,370.00 1 1971 LS-1 Dunwood $11,370.00 1 1973-1 $14 535.00 1 CREDIT TO AREA: (1) 602-37691 Sewer Operating (6) 311-37691 1997 Improvements (4) 406-37691 PIR Fund#7 LS&Forcemain (� 313-37691 1998-1999 Sewer Improvements (5) 308-37691 1992 Improve Stubbs Bay (8) 314-37691 2000 Sewer Improvements 2004 Fee Schedule—Page 10 ALL SANI'1'AI2Y SEWER AND MUNICIPAL WATFR CONNECTION CHARGES(If not previously assessed or if an improvement project is not deemed to be required iu the sole discretion of the City. If an improvement is required,the connecrion charge may be in addirion to any assessment.) ' The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be charged the connection fee for that area. Such connections are subject to City Council approval. SEWER PROJECTS 1980-1 Minnetonka Bluffs $12,615.00 1 1980-1 West Ferndale/Count Road 15 $29,305.00 1 1980-1 Orono Lanc $23,450.00 1 1980-1 Coun Road 15/Marinas $9,820.00 1 1980-2 North Shore Drive/Scotch Pine Lane $29,305.00 1) 1981-1 North Si�orc Drive/Hi hwood $15,085.00 1 1982-1A Navarre Utilities �3,205.00 Trunk Area (1) $1,315.00 1982-1B Navarre Utilities Northern Avenue $520.00 $3,475.00 (1) (trunk unit Per Acre acre/unit) 1985-1 C stal Ba $15 260.00 1 CREDIT TO AREA• (1) 602-37691 Sewer Operating (6) 311-37691 1997 Improvements (4) 406-37691 PIR Fund#7 LS&Forcemain ('� 313-37691 1998-1999 Sewer Improvements (5) 308-37691 1992 Improve Stubbs Bay (8) 314-37691 2000 Sewer Improvements 2004 Fee Schedule—Page 11 ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement project is not deemed to be required in the sole discretion of the City. If an improvement is required,the connection charge may be in addition to any assessment.) The connection charge for properfies wishing to connect to the sewer or water but which are located outside the dclineated boundaries of the atfected project area shall bc charged the connection[ee for that area. Such connections are subject to City Council approval. 1983-1 Hi hwa 12 Orono-Lon Lake-Medina $1,495.00 1 1989 Hi hwa 12 $5,510/acre 1 1992 Stubbs Bay Sewer I Stubbs Bay NE/NW-Bayside East $17,170.00 (5) II Bederwood $26,590.00 (5) III Bayside North $22,515.00 (5) IV Oxford $31,780.00 (5) V Cygnet and Leaf S25,685.00 (5) 1997 SEWER 97-1 North L.L./L.L.C.0 $22,370.00 (() 97-2 Bracketts Point $37,244.00 (() 97-3 Bay Ridge $19,885.00 (6) CREDIT TO AREA: (1) 602-37691 Sewer Operating (6) 311-37691 1997 Improvements (4) 406-37691 PIR Fund#7 LS&Forcemain ('n 313-37691 1998-1999 Sewer Improvements (5) 308-37691 1992 Improve Stubbs Bay (8) 314-37691 2000 Sewer Improvements 2004 Fee Schedule—Page 12 ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement project is not deemed to be required in thc wlc discrclion of Il�c Cily. If an improvcmcnt is rcquircd,tl�c conncction char�c may bc in uddition to uny asscssmcnt.) - The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be charged the connection fee for that area. Such connections are subject to City Council approval. 1998- 1999 SEWER � 1998 Shoreline/Heritage Sewer $18,785.00 (7) 99-1 Orono Orchard Sewer $24,760.00 (7) 99-2 Edgewood Hills Sewer $31,465.00 ('� 2000 SEWER 2000-1 Webber Hills $8,155.00 Ezcludes Grinder Allowance (8) 2000-2 Fox Ridge $18,000.00 Ezcludes Grinder Allowance (8) 2000-3 East Long Lake 514,290.00 Excludes Grinder Allowance (8) 2003 SEWER 2003-1 North Long Lake East $11,000.00 (1) 2003-2 Old Long Lake Rd $6,500.00 (1) 2003-3 Sixth Ave NBrown Rd $8,500.00 (1) (Phillips) CREDIT TO AREA: (1) 602-37691 Sewer Operating (6) 311-37691 1997 Improvements (4) 406-37691 PIR Fund#7 LS&Forcemain ('� 313-37691 1998-1999 Sewer Improvements (5) 30&37691 1992 Improve Stubbs Bay (8) 314-37691 2000 Sewer Improvements 2004 Fee Schedule-Page 13 ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement project is not deemed to be required in the sole discretion of the City. If an improvement is required,the connection charge may be in addition to any assessment.) The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be charged the connection fee for that area. Such connections are subject to City Council approval. 1984 Forcemain and Lift Station#7 upgrade: (An additional fee is charged for properties benefitting from the 1984 forcemain and lift station#7 upgrade,as follows,see map for affected areas): All Char es Are Per Unit #6 B Pass+ #7 Forcemain Credit To Area Existin Pro erties/Increase $590.00 4 New Bldgs Replacing Ezisting Bldgs(If usage $590.00 (4) increases from existin New Residential w/Existin Stub $1,685.00 4 New Residential without Stub $525.00(1 $1,685.00 4 (1 and 4 Freshwater Biological(Incl. "Marsh at Lafayette' $525.00(1) $660.00(4)Per unit on (1)and(4) Lots) connection(previously assessed$2,000/acre 1989 Gravity Line and Lift Station #10 By Pass: An additional fee is charged for properties benefitting from the 1989 gravity line and lift station #10 by-pass per Resolution #2671: Fixed Char e+ #10 B Pass Credit To Area see ma for affected areas $225.00 $2,970.00 1 CREDIT TO AREA: _ (1) 602-37691 Sewer Operating (6) 311-37691 1997 Improvements (4) 406-37691 PIR Fund#7 LS&Forcemain (7) 313-37691 1998-1999 Sewer Improvements _ (5) 308-37b91 1992 Improve Stubbs Bay (8) 314-37691 2000 Sewer Improvements 2004 Fee�,...edule Page 14 • ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement project is not deemed to be required in the sole discretion of the City. If an improvement is required,the connection charge may be in addition to any assessment.) _ The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be charged the connection fee for the area. Such connections are subject to City Council approval. WATER PROJECTS By District- Project Unit Charge+ Area Or Acreage Front Foot Credit To Area Char e+ Char e 1967 LW-1 Highway 12/Crystal Bay S 4,960.00 $36.85 (1) Road 1969 LW-2 Chev Chase $4,960.00 -- 1 1970 LW-1 Navarre Residential $2,455.00 $ 24.55 1 1970 LW-1 Navarre Commercial $3,690.00 $ 36.90 1 1982-1 A Navarrn �2,620.00 1 1989 Hi hwa 12 $9,110/acre 1 1999 Navarre Water Treatment $ 405.00 (1) Plant Rehabilitation* *1999 Navarre Water Treatment Plant Rehabilitation Connection Charge-All properties within the Navarre Municipal Water District(the area served with municipal water service via the Navarre Water Treatment Plant)which were either not assessed or not fully assessed via special assessment for the 1999 Navarre Water Treatment Plant Rehabilitation Project shall pay a connection charge of$390.00 per unit upon connection to the municipal water system. Such charge shall be collected at the t(me a building permit is issued for new construction,or at the time a connection permit is issued for ezisting structures. CREDIT TO AREA: (1)601-37391 Water Operating 2004 Fee Schedule—Page IS SEWER AND WATER UNIT ADJUSTMENT CHARGES CHARGES Charges shall result from either an intensification of an existing non-residential use or a new non-residential use that replaces a former use on a property tocated within an area already assessed and served by municipal sewer and water. CREDIT Credit for previously assessed sewer or water units shall be applied against the total number of sewer and water units established for the new use. UNIT CHARGE I�;nc4 scwcr and cach watcr unit adjustment charge shall be equal to the current Service Availability Charge established by the Metropolitan Council Wastewater Services or its successor and shall be payable to the City of Orono upon application for a building permit. 2004 Fee.. ..dule—Page 16 . CONSTRUCTION PERMITS AND INSPECTION FEES Applicable Permit Tvae Fee Code Section ON-SITE SYSTEMS Ch.58,Article II Design Review Fees Included with permit fees Subdivision Site Evaluation Report Review $60.00/per new lot Residential System Permit: Repair existing system $50.00 New/Replacement System $100.00+$20.00 per each inspection over 3 (Includes outhouse on Big Island) Non-Residential System Pcrmit: New or Total replacement $100.00+$20.00 per each inspection over 3 Partial replacement $60.00+$20.00 per each inspection over 3 Annual Service Charge $50.00/system/year plus an additional$10.00 fee for late penalty plus 8% interest[or unpaid charges certified GRADING,EXCAVATION,FILLING 500 cubic yards or less $50.00(staff permit)+actual engineering fees if required ($100.00 if engineering fee necessary) $25.00 per each inspection over lst 501 +cubic yards $50.00+Conditional Use Permit ($100.00 if engineering fee necessary) $25.00 per each inspection over lst NOTE: 501 cubic yards or more requires a Conditional Use Permit unless approved as part of building permit. SIGNS Temporary $35.00 Permanent Per 1997 UBC/SBC Standard Schedule Minimum$35.00 2004 Fee Schedule—Page 17 CONSTRUCTION PERMITS AND INSPECTION FEES(CONT 1 Applicable Permit Tvpe Fee Code Section SPECIAL INSPECTION CHARGES Site Inspection without permit $30.00 (when called by owner) Inspection surcharge for work or $30.00 per trip+boat rental if application on Big Island or transportation is not Deering Island provided by owner Reinspection fee after failure to comply $30.00 per trip+$30.00 per with Building,Septic or Zoning Code hour after lst hour Correction Notice-3rd trip FIRE PROTECTION Ord.223 Fire Prevention Inspection No Charge Fire Code Permits $30.00 each Commercial Fire Alarm Per 1997 UBC Schedule Plan Review Fee 65%of permit fee Fire Sprinkler Systems-Commercial $35.00 minimum fee or 1Z5%of contract price Surcharge based on valuation Kitchen Fire Eztinguishing System-Commercial Per 1997 UBC/SBC Standard Schedule LAWN SPRINKLER SYSTEM $35.00 BURNING PERMITS Up to 5 times per year No Charge For Each Reinspection $20.00 More than 5 times per year $100.00 (for all organizations and individuats regardless of tax status) CONTRACTUAL INSPECTION SERVICE Per Contract Monthly Retainer Fee $25.00 per month (Includes clerical time) Inspection Charge $25.00 per inspection Plan Review Charge Per 1997 UBC/SBC Standard Schedule Clerical Fee(Only charged if clerical $20.00 per hour use is eacessive) 2004 Fee ,iule—Page 18 LICENSES&MISCELLANEOUS CHARGES " Applicable Fee Code Section COMMERCIAL MARINA LICENSE Application Fee(initial) $300.00 Renewal Application&Inspection Fee $200.00 (annual)plus: Late fee $100.00 JOINT USE DOCK LICENSE Application Fee(Initial) $50.00 Renewal Application Fee $20.00 Plus each slip $ 2.00 Late Fee $25.00 CANOE RACK RENTAL $40.00/slip GARBAGE HAULER LICENSE -flat rate $_50.00 Ch.54,Article III -per haulcr !6 IS.pO/Iruck -transfer fee $30.00 HOME OCCUPATION LICENSE(Leve12) $ 100.00 Initial Review Fee Sec.26-76 $30.00 (Annual Review Fee) TEMPORARY TRAILERS&BUILDINGS $30.00 LICENSE ZONING DEPARTMENT DOCUMENTS 2000-2020 Comprehensive Plan $75.00 Municipal Code Book-complete $60.00 w/binder (Ch.1-94 w/revisions) Municipal Code Aook-Porti�ns Ch 78 only(l.ontng Codc)w/revisions $25.00 loose Ch 82 only(Subdiv.Codc)w/revisions $ 15.00 loose Other Individual Chapters $ .25/page Binder $ 5.00 Comp.Plan Amendment#2(Hwy 12) $ 5.00 2004 Fee Schedule—Page 19 LICENSES&MISCELLANEOUS CHARGES(CONT 1 Applicable Document Tvae Fee Code Section GIS and City Maps 8-%:zll 11x17 17z22 22g34 Black&white $0.25 $1.00 $2.00 $ 4.00 Color $2.00 $4.00 $8.00 $16.00 Topographic Information $I2.00 per acre+engineering consultant fee if computer diskette is required Building&Planning Publications As Posted-Prices subject to change General Administrative Licenses/Fines Tobacco Licenses $100.00 Ch.50,Article II Licensee or Employee Violations within 24 month period ist Offense $75.00 2nd Uffensc $200.00 3rd Offense&Over $250.00 Gambling&Ratfle License $10.00 Ch.38,Article Ii Transient Merchant/Peddler License $100.00 plus actual costs Ch.30 up b�I,S00 General Adminlstrative Documents Listing Information $10.00 Assessment Search-Written $20.00/parcel (Verbal searches not given) Fax Charge No charge up to 6 pages;$.25 each additional page Copy Service(for public City records only) $ .25 each 11" x 17"copies $ 1.00 each Individual copies of Ordinances(1 copy) No Charge Reprint of Oversized Documents that Cost of copying service,Messenger service& I�avc been microtilmed Min.Clerical Fee of$5.00(entire amount to be paid upon request) Building Plan Copies Cost of Copying,Messenger Service& Min.Clerical Fee of$5.00(entire amount to be paid upon request) Current Street Address Book $25.00 . Labels from Utility Billing System $.OS per label(approzimately$150.00) � Audio Recording Duplication $ 10.00 per tape Information Provided on CD $10.00 per CD - 2004 Fee �ule—Page 20 LICENSES&MISCELLANEOUS CHARGES(CONT.1 Applicable : Document Tvpe Fee Code Section General Administrative Documents(Continuedl Surcharge for Staff Ezpense in Eacess of Regular Fees Professional Time $50.00/hour Clerical Time $30.00/hour LegaVEngineering Consultants Actual Billed Cost Mileage/Copies/Postage/Etc. Actual Cost Electronic Labels $50.00 Returned Check Charge $20.00 DOG LICENSES Sec.62-131 thru 62-135 Biannual License(issued in odd years) $15.00 Annual License(issued in even years only) $ 7.50 KENNEL LICENSES Sec.62-161 thru 62-185 Commercial Application&Inspection Fee $150.00 (Annual) Rcsicicntial Applicafion&Inspection Fcc $25,00 (Annual) NOTF: n�a�kept in reRidential kcnnclA maRt bc inclividoally licenacd. IZCdIlICt1IINI ItC1111CI rCC IM I11 HII/IIII011 �O lltlq II�CI1hC�CCM. DOGS AT LAR(:E-RELEASE FEE Sec.62-104 First Offense $55.00 Second Offense $65.00 Third Offense $75.00 After Hours,Weekend&Holiday Release Charge $75.00 ANIMALS AT LARGE(Other than dogs)-Release Fee Ch.62,Article I First Offense $55.00 Second Offense $65.00 Third Offense $75.00 Trace&Catch Animal $35.00/hour Trailer Charge $55.00 pius.31 mile (total distance) CARE OF IMPOUNDED ANIMAL Actual Cost 2004 Fee Schedule—Page 21 LICENSES&MISCELLANEOUS CHARGES(CONT.) Applicable Permit Tvae Fee Code Section Police Department Administered BEER,WINE&LIQUOR LICENSES Initial Investigation On-Sale/Off-Sale Liquor/3.2 Beer On Sale/ $500.00 per License Ch.34,Article II 3.2 Beer Off Sale/Wine Collected at Application In state investigation Actual cost up to$10,000 Out state investigation Actual cost Off-Sale Liquor License $150.00 Sec.34-66 On-Sale Liquor License $5,000.00 Sec.34-66 On-Sale Wine License $2,000.00 Sec.34-77 3.2 Beer Off-Sale(Annual) $ 50.00 Sec.34-66 3Z Beer On-Sale(Annual) $ 100.00 Sec.34-66 Setup(Annual) $ 100.00 Sec.34-126;34-143 Club Liquor License (weekday) $ 200.00 Sec.34-66 (Sunday) $ 200.00 Sec.34-66 Temporary Set-up Permit(one day) $ 25.00/each Sec.34-42 Temporary Beer Permit(one day) $ 25.00/each Sec.34-82 Liquor Violations 1"Violation $500.00 2ad Violation $1,000&3 day license suspension 3'�Violation $2,000&2 week license suspension 4'"Violation License revocation AMUSEMENT DEVICE LICENSES Sec.38-601 thru 38-603 Per Establishment(Annual) $100.00+machine fee Per Machine Fee $25.00 each PUBLIC DANCE LICENSE(annual) $100.00 Sec.38-501 thru 38-506 (Individual Permit) $ 10.00 LARGE ASSEMBLY PERMIT(over 300 people) $200.00+$60.00 each Sec.38-801 thru 38-803 additional day;actual costs up to$1,500 FIREWORKS PERMIT Sec.70-99 Display of Fireworks/Pyrotechnic Special Effects $50.00 Sale and/or Storage o[Consumer Fireworks $50.00 � 2004 Fee Schedule—Page 22 - - LICEN &MISCELLANEOUS CHARGES(CONT.) Applicable Aaalication TvQ,e Fee Code Section Police Department Administered FIREARMS DISCHARGE PERMIT Ch.70,Article III Occasional (limited use) $10.00 Game Animals(limited use) $25.00 Annual(Club Only) $25.00 LIMITED TRAPPING PERMIT $20.00 Sec.70-71 SPECIAL EVENTS PERMIT $50.00 or$200.00 if over Ch.66,Article VI (Includes Parades,Noise Ezemption,Use of Public Property) 200 people; actual costs up to$1,500 FALSE POLICE ALARM USER FEES Ch.42,Article III First false alarm/calendar year No Charge Second false alarm/calendar year $50.00 Third false alarm/calendar year $100.00 Fourth false alarm/calendar year $150.00 Fifth and over false alarm/calendar year $250.00 FALSE FIRE ALARM USER FEES Ch.42,Article III First false alarm/calendar year No Charge Second false alarm/calendar year $ 75.00 Third false alarm/calendar year $250.00 Fourth false alarm/calendar year $350.00 Fifth&over faise alarm/calendar year $500.00 each call FINGERPRINTING SERVICE $25.00/application for 2 cards- RESIDENTS ONLY $13.00 each additional card (Citiicntiiip Nn Ch��ruc) 2004 Fee Schedule—Page 23 LICENSES&MISCELLANEOUS CHARGES(CONT] Applicable Application Type Fee Code Section Police Department Administered COPY SERVICE-Police Records First Two Copies $ 5.00/first page+$.25 each additional page Additional Copies $ 0.25 each SUMMARY DATA REPORT $10.00 COPY OF ACCIDENT REPORTS $ 5.00 each Accident Photos $25.00 minimum or actual cost COPY OF DRIVER'S LICENSE RECORD $ 5.00 each COPY FROM MICROFICHE FILE First Two Copies $10.00 Additional Copies $ .50 each "NO PARKING ORDER OF POLICE" $1.00 each paper signs (no lath included) AUDIO TAPE DUPLICATION $10.00 each VIDEO TAPE DUPLICATION $50.00 each 2004 Fee Schedule—Page 24 - • PUBLIC .RKS DEPARTMENT MISCELLANEOUS CHARGES Applicable • ' Application Type Fee Code Section Utilitv Service Rates-Effective beginning First Quarter 2004 . MUNICIPAL SEWER RATE by unit: lst $9135 per quarter 2nd $82.75 per quarter by flow: $ 3.44/1000 gallon plus $ 8.60 per quarter per connection Area#1 Area#2 Area#3 MUNICIPAL WATER RATES Navarre Hwp 12 Chew Chase Billing&Ready to Serve Chg $26.15/qtr $9.50/qtr $9.50/qtr Water Usage Rate $2.21/1000 gal $3.06/1000 gal $230/1000 gal Unconnected Property Chg $26.15/qtr -0- -0- (ready to serve/hydrant chg) Fee Federally Mandated Safe Drinking Water $ 5.21 per year on second quarter billing Testing Program (Charged per service connection) Quarterly Service Charge for Non-Functioning $50.00 Ord.218,2ad Series or Inaccessible Water Meter Bulk sale to Minnetonka Beach for Lafayette Ridge Area-Area#1 Rate $26.15/qtr billing charge plus$2.21/1000 gallon total flow at border meter. Bulk sale-All Others-$25.00 per location plus area rate per/1,000 gallons. i.e.Fill swimming poot or watering sod. Penalty for late payment of sewer/water bills-8% after 30 days from billing date(applied to the total unpaid balance). Interest at 8%on unpaid water/sewer bills certified. Water Turn-On $20.00 Minimum Water Turn-off $20.00 Minimum Watcr Systcm Itcpair/Itcplaccment If damagc causcd by property owncr: Labor-Current Hourly Rate Parts-At Cost 2004 Fee Schedule—Page 2S PUBLIC WORKS DEPARTMENT MISCELLANEOUS CHARGES(CONT 1 Applicable Application Type Fee Code Section MUNICIPAL STORM WATER UTILITY RATES Sec.14-251 thru 14-287 The basic intent of storm water regulations is to minimize the impact of development on natural drainage systems. Any development in an area will change the natural conditions by increasing the total volume of runoff and the level of pollutant loading. The storm water utility provides dedicated funds to operate,maintain,manage,construct or reconstruct the municipal storm water drainage system. Residentiai properties will be charged one residential unit fee for each residential unit on the property. Non-residential properties will be charged the appropriate number of residential unit fees based on the"Residential Equivalent Factor"for the property. One residential unit: $9.00 per quarter Non-residential unit: Based on"Residential Equivalent Factor" RECYCLING CHARGE $23.08/year Recycling Container-Initial for new residence No Charge Replacement Container $3.00 each (including sales taa) Wheel Kit $5.00 GOLF COURSE CHARGES-Effective date 2004 Season Monday thru Friday(excluding Holidays) Begin Play Before 12:00 Noon lst Nine Holes $ 10.00 2nd Nine Holes $ 8.00 Aftcr 12:00 Noon and Weekcnd Rates lst Nine Holes $ 13.00 2nd Nine Holes $ 10.00 2nd Nine Holes $ 8.00 (Weekday After 12:00 Noon) League Rates Monday thru Friday $ 11.00 Senior Citizen(Over 60 years old) Begin Play Before 12:00 Noon-Weekdays lst Nine Holes $ 7.00 . 2nd Nine Holes $ 7.00 ' Season Ticket(Senior Citizens Only) $170.00 2004 Fee 'ule—Page 26 PUBLIC WORKS DEPARTMENT MISCELLANEOUS CHARGES(CONT.) � Applicable Application Type Fee Code Section GOLF COURSE CHARGES-Effective date 2004 Season (continued) GOLF CART RENTAL Motorized: lst Nine Holes(After 12:00&Weekends) $ 12.00 2nd Nine Holes $ 10.00 Begin Play Before 12:00 Noon lst Nine Holes $ 10.00 2nd Nine Holes $ 8.00 Pull Carts-Per Round $ 3.00 Golf clubs-Per Round $ 3.00 STUDENT RATE(AGES 12-17) Begin Play Before Noon Monday-Friday,Eacluding Holidays lst Nine Holes $ 7.00 2nd Nine Holes $ 7.00 FALL GOLF RATES Will begin the third Monday of September. -Weekend Rates: lst Nine Holes $ 10.00 2nd Nine Holes $ 8.00 Riding Cart $ 9.00/per nine -Weekday Rates: lst Nine Holes $ 8.00 2nd Nine Holes $ 5.00 Sr.&Jr. $ 5.00 Riding Cart $ 7.00/per nine CONCESSIONS As Posted 2004 Fec Schedule—Pnge 27 PUBLIC WORKS SUPPLIES&SERVICES Street or Traffic Signs $100.00/std.sign (sale includes installation) Driveway Culverts On Quote Basis (sale only,not installed) Water Meter Sales(See Building Permit Section) Temporary No Parking Signs(without lath) $ 1.00 each Driveway/Curb-Cut Permits Individual Driveways $30.00/permit New Street Intersections(See zoning section-Special improvement fees) Address Change Request by Owner $50.00 per address SECTION 3. This ordinance establishing the 2004 Fee Schedule shall be published as a Summary Ordinance in the Laker and Pioneer Newspaper and shall be effective the week of January 1,2004. Adopted by the City Council of the City of Orono on this 8th day of December,2003. ATTEST: . � n a S.Vee,City Clerk Barbara A.Peterson,Mayor is� e �.�+ t e La er �one a r e wee � ber 2Q, 2003. 2004 Fee dule—Page 28 INDEX FOR 2004 FEE SCHEDULE ' A Accident Reports ........ .. .. . . ......... 24 E M � Address Book ............ . ............. 20 Easement Vacation ... . . .................. 3 Mail InPostage and Handling ... . . .........20 Address Change ........... .............28 Electronic Labels ..... ..................20 Maps For Sale . .........................20 Administration Document Copies .......... 20 Marina Licenses ..... . .. .. . .. . .......... 19 After-The-FactFees ..... . . . .............. 5 F MechanicalPermitFees . . .. ...............9 Amusement Devices.... ...... ........... 22 False Alarm User Fees .... ........ . .. . . .. 23 Microfiche Copies(PD) ............. . ....24 Animai Impound Fees ............ . . .....21 Fingerprinting(Police) ... .......... .. ....23 Municfpal Water Annual Service Charge .. ..25 Animals at Large ........................21 Fire Alarm Permit ................ .. ..... 18 Municipal Code Copies .................. 19 Appeal of Adminlstrative Decision ..........4 Fire Protection ......................... 18 Municipal Water Connection Charge ....... 15 Assessment Search .....................20 Fire Sprinkler Permit ........... ......... 18 Muntcipal Connection Permits(Sewer/Water) .9 Audio Recording Duplication .......... 20,24 Fireworks Permit Fee ... ................. 22 Muntcipal Sewer Annual Service Charge ....25 B G N Beer,Wine 8 Liquor License ..............22 Gambling/Raffle License ....... .......... 20 "No Parking"Stgns .................. 24,28 Bullding Permit Fees ..................... 8 Garbage Haulers License ....... . ........ 19 Noise Exemption Permit ............. .... 23 Building Plan Copies ............. . ......20 Golf Course Charges ........... . ........ 26 Burning Permits ................. ....... 18 Grading,Excavattng,Filling ...... . . . . .... 17 O On-Site Systems(Septic) ........ . .... .... 17 C H Ordinance Copy .......... ..... .........20 Canoe Rental Slip ............. .......... 19 Home Occupation License ... ...... ...... 19 Outhouse Construction(See On-Site Systems�7 CD(Information provided on) .... . ........20 Oversized Document Reprint ....... ...... 20 Certificate of Occupancy ...... .... . ....... 8 I Code Book Copies ......... ... ...... . ... 19 Impound Fees .... . . .... ......... . .. . ... 21 P Commercial Site Plan Review .... ...... . ... 2 Information Provided on CD ........ ......20 Parades Permit ..... .. . . ...... .. .... ....23 Commercial Marina License ..... ......... 19 Industrial Revenue Bond Appl. . . ...........4 Park Dedication Fees . .. . .... .............6 Comprehensive Plan Amendment ..........2 Inspections . .......... ........ ......... 18 Peddler/Transient Merchant License .......20 Comprehensive Guide Plan Copies ........ 19 Plumbing Permit .................. .......9 Conditional Use Permit Fees ............... 1 J Public Dance License.................... 22 Connection Charges ......... ........ 10-16 Joint Use Dock License .. ........ . ....... 19 Public Works Supplies&Services ......... 28 Contractual Inspection Service ............ 18 PUD Rezoning .......... .................2 Copy Charges-Administration ............ 20 K Copy Microflche File-PD ....... ......... 24 Kennel License ....... .............. . . .. 21 R Copy Service-Police Dept ....... ........24 Kitchen Fire Extinguishing System....... .. 18 Raffle License .......... .......... ...... 20 Culverts ....... ........................28 Recycling Charge ....... .......... ...... 26 L RecycUng Replacement Bins.............. 26 D Labels from Utility Billtng ................20 Reprint Oversized Documents On Microfilm . 20 Dance License .........................22 Large Assembly Permit ................ ..22 Retaining Watls ................... .......8 Demolition Permit Fee ......... .... .......8 Lawn Sprinkler System ................. . 18 Returned Check Charge ....... ..... . .....20 Docks-Commerctal ........... ........... 8 Licenses ........................... 19-22 Rezoning Application Fes .......... ...... .2 Docks-Residential ........... . ....... ... 8 Limited Trapping Permit ................. 23 Rip Rap Application Fee ............ ..... .4 DogLicense ........................... 21 LiquorLicenses ................ . ....... 22 Dogs at Large ..........................21 Listing Info-Realtors . .... ....... . .. .... 20 S Driver's License Record .......... ........24 Sanitary Sewer Connection Charge . ..... .. 10 Driveway/Curb Cut Permits .. . . ... .. . .....28 Septic Mnual Service Charge.. . ..... ..... 17 Driveway Culverts...... . . . . . .. . ...... ... 28 Septic System Permits .. . ... ...... . ...... 17 2004 Fee Schedule-Page 29 S(cont) Sewer Connection Permit Fees .............9 W Sewer Projects(1963-1973) ............... 10 Water Connectlon Permit Fee .............. 9 Sewer ProJecta(1880-1992) ............ 11�12 Water Meter Fees ... .....................9 Sewer Projects(1987-2000) ............... 13 Water Projects .. ..... .................. 15 Sewer Projects(Lift Stations) ............. 14 Water Rates ... ........ ................. 25 Sewer Rates ...........................25 Water Turn-0ff Charge ................... 25 Signs .................. ......... 17,24�28 Water Turn-0n Charge ..... ..............25 Sketch Plan ........ ....... ..............2 Wheel Kits for Recycling Bins .............26 Special Event Permits ..... ..... ... ......23 Special Improvements Application ..........4 Z Special Inspection Charges. . .... . ........ 18 Zoning Amendments ..... ................ 3 Special Assessment Searches ............20 Zoning Document Copies . ............... 19 Sprinkler Systems-Commercial and Lawn .. 18 Stormwater/Drainage Trunk Fees ........... 7 Stormwater Utility ....... . .... .. . ........26 Street Address Book ..... . .... ... ....... 20 Street Signs(Pubflc Works)....... ........28 Subdivision Application Fee ........... .... 3 Summary Data Report ................... 24 Surcharge for Staff Expense ............... 5 T Tape Duplication(Admin)-Audio ..........20 Tape Duplication(PD)-Audio .............24 Tape Duplication(PD)-Video ............. 24 Temp."No Parking"(P.W.)Signs ..........28 Temp."No Parking"(P.D.)Signs...........24 Temporary 8 Permanent Signs ............ 1T Temporary TraileriBuilding ............... 19 Tobacco License .......................20 Topographic Information .................20 TrafficSigns ........................... 28 Transient Merehant License ..............20 Trapping Permit ......... ....... ........23 TreeRemoval ................... ... ..... 8 U Underground Tank Removal ........... .. .. 9 Unit Adjustment Connection Charge ....... 16 Use of Public Property ...................23 Utility Rate Mnual Service Charge ...... 17,25 V Vacation Applicatlon Fees ......... ........ 3 Variance Application Fees ................. 1 � Video Tape Duplication(PD) ..............24 , � zno3 r����, .�«<<�-p�,b•��.�o ,