Loading...
HomeMy WebLinkAboutRPS22-000167 Building Final-CO-As builtFrom:gnelson@oronomn.gov Sent:11/16/2023 - 08:55 AM To:Paul@Chamberlaincap.com CC:gnelson@oronomn.gov Subject:Inspection Report Individual CITY OF ORONO 2750 KELLEY PARKWAY ORONO, MN 55356 PH: (952) 249-4600 FAX: (952) 249-4616 Inspection Report 2860 Lillian LN Permit Number:RPS22-000167 Site Address:2860 Lillian LN, Orono, MN 55356 Property Owner:Chad Schwarze Et Al Description:New Home Inspection Date: 11/16/2023 Inspection Type: Building Final Inspection Results: Permit Finaled Sincerely, Gary Nelson 952-242-4442 To schedule your inspections please call: (952) 249-4600 CODE REQUIREMENTS ARE FOR YOUR PERSONAL HEALTH AND SAFETY! City of Orono CERTIFICATE OF OCCUPANCY This certificate is issued pursuant to the requirements of 1300.0220 of the 2020 Minnesota Building Code verifying that at the time of issuance this structure was in compliance with the various ordinances of the local jurisdiction regulating building construction or use. For the following: Building Address:2860 Lillian LN Orono, MN 55356 PIN:3311823310015 Lot/Block:002/001 Zoning District: Permit Number:RPS22-000167 Construction Type:VB Residential or Commercial Un-Protected Occupancy Group: IRC 1 Fire Sprinkler: No Owner Name: Chad Schwarze Et Al Owner Address:401 N 2ND ST UNIT 407 MINNEAPOLIS MN 55 5401 FOR YOUR INFORMATION For any police, fire or medical emergency - Call: 911 In purchasing a new home, file for your homestead at Hennepin County offices. Register your address for voting, driver's license, and automobile registration. City Water and Sewer is billed monthly. Septic inspection fees are billed annually. Permits are required for any additions or alterations on your property including garages, decks, patios or other accessory structure. Special regulations prohibit any excavation, filling, grading, dredging, tree removal, or construction of any kind within 75 feet of any lakeshore or within 25 feet of any wetlands. Please Note: The property owner is responsible for all Legal/Engineering charges resulting from this project. Due to varying billing cycles, bills may be mailed up to 90 days after the issuance of this Certificate of Occupancy December 20, 2023 LAURA OAKDEN ZONING ADMINISTRATOR December 20, 2023 NICOLE EGAN BUILDING OFFICIAL