Thank you for the follow up.The after-the-fact application is currently incomplete because a wetland delineation has yet
to be submitted. I am currently working on a follow up incomplete letter that will most likely have a June 1, 2013
deadline for the submittal of the wetland delineation because the growing season is pretty much done for this year. I
will be sure to CC you on the letter that goes out.
Thank you,
Brandon Wisner
Compliance Officer
Minnehaha Creek Watershed District
18202 Minnetonka Boulevard
Deephaven, MN 55391
Direct: (952) 641-4505
Main Office: (952)471-0590
Fax: 952-471-0682
www.minnehahacreek.or�
.�
MINNEHAHA C1tEEK
wwTeasffEQ pasraics
�Think Green - please do not print this email unless necessary
From: Christine Mattson [mailto:CMattson@ci.orono.mn.us]
Sent: Monday, October 22, 2012 10:14 AM
To: Brandon Wisner
Subject: 720 Big Island
Hi Brandon,
I see the last correspondence I received from you regarding 720 Big Island was on June 5th. Do you have any
updated information for that property?
Thanks!
Christine Mattson
Planning Assistant
i
City of Orono � '
2750 Kelly Parkway Orono MN 55356 (physical addressJ
PO Box 66 Crystal Bay MN 55323-0066 (mailing addressJ
`�' 952.249.4620 3 952.249.4616
'�' cmattson@ci.orono.mn.us � www.ci.orono.mn.us
Office Hours: Monday- Friday 8 am to 4:30 pm
OUR OFFICE WILL BE CLOSED: Monday, November 12, 2012
z
. ,
MINNEHAHA CREEK WATERSHED DISTRICT
QUALITY OF WATER QUALITY OF LIFE
June 5,2012
Gerald A. Erickson Jr.
2630 Marshland
Wayzata, MN 55391
Re: 720 Big Island,Orono,Permit Application#12-192
Dear Applicant:
Your application for a Minnehaha Creek Watershed District Permit was received on May 22, 2012. The application does
not contain all required information and is considered incomplete at this time. As specified in District Rules,review of
your application will commence once it is complete. Delay in submitting requested information may delay the scheduling
of this application to a meeting agenda and/or the issuance of your permit. The following information or materials were
not present in your application:
Following our meeting today June, 5 2012,the below information is still needed to complete the application(some of the
information previously requested was submitted at the meeting).
1. Summary of recent work performed on the property(within the last 6 months)
2. Survey of project area showing pre-project conditions
3. Shoreline Stabilization(Riprap):
An 11" x 17" site plan/survey showing:
❑ Location of the OHW,existing shoreline, 100-year high water elevation and property lines;
❑ Elevation contours of the upland within 20 feet of the OHW;
❑ Location of existing trees and shrubs within the shoreline stabilization zone and an indication
of whether they are to be removed* or retained;
*Clear cutting is prohibited except within the access corridor,and native vegetation
shall be preserved outside of the access corridor as much as practicable and, where
removed, shall be replaced with other vegetation that is equally effective in retarding
runoff and preventing erosion
Plan view of locations and lineal footage of the proposed shoreline stabilization treatment;
❑ Location of an upland baseline parallel to the shoreline with stationing(example): (Link to
Baseline Example.pd fl
■ Baseline origin and terminus must be referenced to three fixed features;
■ Perpendicular offsets from the baseline to the OHW shall be measured and distances shown on the
plan at 20-foot stations;
■ The baseline shall be staked in the field by the applicant and maintained in-place until project
completion.
A cross section detailing the proposed shoreline treatment which includes the following information:
All Types:
❑ Must be drawn to scale, with the horizontal and vertical scales noted on the drawing;
❑ Must show the existing bank, ordinary high water and 100-year high water elevations;
❑ Must show the distance waterward of the treatment placement(hard armoring inert material, such as
riprap, shall be placed no more than 5 feet waterward of the OHW);
❑ Must provide a description of the underlying soil materials that will support the treatment;
❑ Must show the finished slope. Finished stabilization slopes shall be 3:1 or less where practical and
feasible. Finished slopes greater than 2:1 shall be considered retaining walls.
❑ Riprap shall not extend higher than the top of the bank or 2 feet above the 100 year floodplain elevation,
whichever is lower;
Provide a detailed erosion control and site stabilization plan for the proposed project which includes:
❑ Identify on a plan sheet the proposed access route for all land based application;
❑ Identify the location of any material stockpile locations;
❑ Provide a comprehensive stabilization plan for any disturbed areas on site;
❑ Identify on a plan sheet the floating silt curtain for any work below the normal water level(required
for all land-based installations).
4. Sandblanket:
Site plan showing:
❑ Property lines
❑ Indication of where sand blanket was applied
❑ Existing elevation contours of adjacent upland area
❑ Ordinary high water and 100-year high water elevations
Profile,cross-section and/or topographic contours(no greater than 1 foot) showing:
❑ Existing and proposed elevations
Sandblanket must meet the following dimensional requirements:
❑ Length no more than '/2 the length of shareline or 50 feet, whichever is less
❑ Depth no more than 6 inches
❑ Width no more than 10 feet(waterward of OHW)
5. Floodplain Alteration:
Determination by a professional engineer of the 100-year high water elevation
before and after the project.
Computation by a professional engineer of cut, fill and change in water storage capacity resulting from
proposed grading.
6. Wetland Alteration:
Complete delineation report, in accordance with the guidelines provided by the Board of Water& Soil
Resources, for the wetland near the project area. The report must be submitted for boundary&type
approval under the Minnesota Wetland Conservation Act no later than June 30,2012.
Please provide all above requested items by 4:30 PM on June 15,2012 (with the exception of the delineation report that
must be submitted no later than June 30, 2012),or the matter will be processed for formal enforcement action before the
MCWD Board of Managers. Thank you for your immediate attention to this matter. If you have any questions, please
contact me at(952)641-4505 bwisner@minnehahacreek.org.
Sincerely,
Brandon Wisner
Compliance Officer
CC: Christine Mattson, City of Orono
Jack Gleason, MN Department of Natural Resources
. �
From: Christine Mattson [mailto:CMattsonCa�ci.orono.mn.us]
Sent: Tuesday, May 29, 2012 8:32 AM
To: Brandon Wisner
Subject: RE: 720 Big Island, Orono After the Fact Permit Letter
Hi Brandon,
Do you have the specific location of the un-permitted work that took place at 720 Big Island?
Thanks!
Christine�
From: Brandon Wisner [mailto:bwisnerCa�minnehahacreek.org]
Sent: Wednesday, May 16, 2012 12:08 PM
To: Christine Mattson; iohn.gleason@state.mn.us; gnvbeckCa�lmcd.org
Subject: 720 Big Island, Orono After the Fact Permit Letter
Hello,
Please see the attached After the Fact letter that was mailed out yesterday to the property owner of the above listed
address for un-permitted work that has taken place. Let me know if you have any questions regarding the letter.
Thank you,
Brandon Wisner
District Representative
Minnehaha Creek Watershed District
18202 Minnetonka Boulevard
Deephaven, MN 55391
Direct: (952) 641-4517
Main Office: (952)471-0590
Fax: 952-471-0682
www.minnehahacreek.or�
��
MINPiEHAHA CRE�K
WA7ERStsED QISTgtCT
�Think Green - please do not print this email unless necessary
z
MINNEHAHA CREEK � WATERSHED DISTRICT
QUALITY OF WATER `—� QUALITY OF LIFE
The Minnehaha Creek May 15,2012
Watershed Distrid is Gerald A Erickson Jr.
720 Big Island
committed to a leadership Orono,MN 55331
role in protecting,
Gerald A Erickson Jr.
improving and managing 4567 American Blvd W
Minneapolis, MN 55437
the surFace waters and
affiliated groundwater
RE: Unpermitted Shoreline Work
resources within the Property Identitication Number: 2211723240001,720 Big Island,
Orono
Distrid,including their
relationships to the Gerald A Erickson Jr.,
ecosystems of which During routine inspections on May 9,2012,Minnehaha Creek Watershed District(MCWD)staff
inspected the above mentioned property on Big Island in the City of Orono. Based upon this
they are an integral part. inspection,District staff determined that land-disturbing activities subject to MCWD rules have
We achieve our mission occurred without the required permit(s).
through regulation, MCWD observations indicate that shoreline was altered on this property through the installation
of approximately 96 feet of riprap, installation of a 19 foot wide sandblanket(within riprap),
capital projects, possible wetland impacts near the shoreline and floodplain alteration.MCWD findings are as
education,cooperative follows:
endeavors,and other • Un-permitted installation of riprap
• Un-permitted installation of a sandblanket
programs based on . Un-permitted fill within the 100 year flood elevation
sound science, • Riprap boulder size larger than 30"
• MCWD records also indicate that the riprap installation may have taken place within
innovafive thinking,an fi•inge wetlands of Lower Lake North
informed and engaged
In order to address your failure to secure the necessary permit(s)for the work described above,
constituency,and the MCWD requests that the landowner provide the District with plans and specifications to repair
and/or restore site conditions as an after-the-fact permit application. Such an application will be
cost efFedive use of subject to review,analysis and approval of the MCWD Board of Managers in accordance with
public funds. standard permitting practice. Please submit the following items or information no later than
May 25,2012:
1. District application form(enclosed)
2. $10.00 application fee
I of 3
18202 Minnetonka Boulevard, Deephaven, MN 55391 •Office: (952)471-0590• Fax: (952)471-0682 •www.minnehahacreek.org
�
i
3. Date that riprap was first installed at the shoreline
4. Summary of recent work performed on the property(within the last 6 months)
5. Survey of project area showing pre-project conditions i
Shoreline Stabilization: ;
6. Erosion intensity calculations from section 3 of the Shoreline&Streambank Stabilization
Rule(enclosed) I
I
Photographs of the project site showing pre-existing conditions j
i
Site plan showing:
a. Survey locating the existing ordinary high water(O�elevation,existing
shoreline, 100-year high water elevation,and location of property lines;
b. Elevation contours of the upland within 20 feet of the OHW;
c. Plan view of locations and lineal footage of the shoreline stabilization
Cross section,drawn to scale,with the horizontal and vertical scales noted on the
drawing,detailing:
d. The existing bank,OHW,and 100-year high water elevation;
e. The proposed stabilization technique,finished slope,and distance lakeward of
the OHW;
f. Material specifications;
g. Description of the underlying soil materials.
Specification of erosion control and site stabilization practices. �
j
Sandblanket:
7. Site plan showing:
a. Property lines
b. Indication of where sand blanket was applied '
c. Existing elevation contours of adjacent upland area
d. Ordinary high water and 100-year high water elevations
Profile,cross-section and/or topographic contours(no greater than 1 foot)showing:
a. Existing and proposed elevations
Sandblanket must meet the following dimensional requirements:
a. Length no more than'/2 the length of shoreline or 50 feet,whichever is Less
b. Depth no more than 6 inches
c. Width no more than 10 feet(waterward of OHW)
2of3
Floodplain Alteration:
8. Determination by a professional engineei•of the 100-year high water elevation
before and after the project.
Computation by a professional engineer of cut,fill and change in water storage capacity
resulting from proposed gcading.
Wetland Alteration:
9. Complete delineation report, in accordance with the guidelines provided by the Board of
Water&Soil Resources,for the wetland near the project area(see attached Functional
Assessment of Wetlands/FAW map). The report must be submitted for boundary&type
approval under the Minnesota Wetland Conservation Act no later than June 30,2012.
Please provide the after-the-fact application and plans no later than May 25,2012, or the matter
wili be processed for formal enforcement action before the MCWD Board of Managers.Thank
you for your immediate attention to this matter. If you have any questions,please contact me at
(952)641-4506 or schristopher@minnehahacreek,org.
Sincerely,
��/v
Steve Christopher
Regulatoiy Manager
Encl: Combined Joint Application Form
Erosion Intensity Scoresheet
Stop Work Order(sign and return)
FAW map
CC: Christine Mattson,City of Orono
Jack Gleason,MN Department of Natucal Resources
Greg Nybeck,Lake Minnetonka Conservation District
3 of 3
Hennepin County GIS - Printable Map Page 1 of 1
Interactive PrOpe�ty
- - nnaps,�,. Map
�r
F� ,. ��
. K .�p$� .,. . ..f�..fi� „4 •'� t .��
. . ,
,
:�x - .:. . 4�� ,
�.. . ..__ _.. w�+��?r� ._. ._ .
-S 'Ki
{F �� ���� ��y � � �.,. �j�. I �r 4 � �.'.
M�11t �,,,,. , �,�, � ��t•� ��,
.,, , `,���;
> „ ;�i
:�` .� . -',� �; . k�..�;, ' ��. �� �
m.-Yra.+� +u , '� j� ��I`�;� ' 9� + ` ��* ,
�M ;
t � �(� I �
� �'� ' � � } �
�
'� ,� � „ � , *
#
•, „
�..!� , �� ,�we � 's , . �
' �' ' �Ef �" �� �� �__ ` � + � Y��
; !' .�� , ` � � i ��. ,' ',`
_ . � , f
, ,�.� � ,, ,
� � � � � '� � � � � . �., � �
; �:
� � � .. ,i � ,;�
�. �"�`��'�_�'+ �� �� � , . a'�.
.. �
� .��� �' " � � ,
� '�. �, �� � � Y e +" , �
• '� _ � � � ; ' ,
�. . , �"�y' '�. ''R�
,t
��n • , � � ,x�'+,�,y{`
{N .%"�s"'� � �i , , �`i x 'S,��� v* _ '°�a�..`. t.
R*
.n ���� �� ;_ � a
` §
o �, .
� � � �
� , , � . ��� . �
4 �, �-.
� � �� ���� ��
� , ���" #�., � ` °,� •`'�'` .
. i�e�_�a�^�'�'r���'-E YM��� � :;-�`""� y _ . �i' . -'r����
Parcel 22_117-23-24-0001 A-T-B: Torrens Map Scale: 1"=400 ft. N
��' Print Date: 5/16/2012 �
Owner Gerald A Erickson Jr Et AI Market $1,500,000 '
Name: Total: j
Parcel 720 Big Island Tax $20,819.10 �
Address: Orono, MN 55331 Total: (Payable:2012)
Property Seasonal-Residential Rec Sale
Typ@: P�IC@: This map is a compilation of data from various '
'sources and is furnished"AS IS"with no
HOme- S81e representation or warranty expressed or
Non-Homestead impiied,including fitness of any particular
stead: Date:
i,purpose,merchantability,or the accuracy and
completeness of the information shown.
Parcel 16.89 acres Sale
Area: 735,612 sq ft Code: COPYRIGHT O HENNEPIN COUNTY 2012
—�,_,-,:Green: ----'
_ _ �--
http://gis.co.hennepin.mn.us/Property/print/default.aspx?C=4545 89.685 5143002,4975015.... 5/16/2012
Christine ir"�"'ison
From: Brandon Wisner[bwisner@minnehahacreek.org]
Sent: Tuesday, May 29, 2012 10:54 AM
To: Christine Mattson
Subject: RE: 720 Big Island, Orono After the Fact Permit Letter
Christine,
I just left you a voice mail describing the approximate location of the un-permitted work at the above listed address.
Here is a print screen of the property and the location is the area along the shoreline at the beginning of the northern
facing dock. Let me know if you have any other questions.
720 big�sland. orono �,� ����.�� :����-__�a�r�,
��� �� '�.
•.r�� .�..,,,-....,,_
,'r"�"� ,,:,. .i
� �s, � - _ _ .
� .. . . � � . ,
,�'.' . � r
i. �d� .�. '.
='' � i' , J �9
R`��e/u"r' *��� �� . , i� • r r �`Y•� �
A� ` , y ��. + `` T . _e ��.'. �.
�.f, ;i , * ` . • . ` *����.
,�' " *.�`*�,_..— �, ' � r � .f���!i� , _ � ,
F y�;. - f � ' � . N a � h , ., .,.���. 11��
� � � . s.. r •-� a`;,! ' h._ ♦ „ 4 .. - _.. �."� •
y� .°•�^� �''".� .. � s M� � -� ,yl��". .�.
��A:y � � �:. .' • . � •, �"„rt � � ..
��' ."1�� �`• R� � �JP *•o �� �r;, ,
� '� - :� ;� � ���:
x� �: � �� �;
rJ s _..d.:i�� «...._...";.'., �..'':�-
Thank you,
Brandon Wisner
Compliance Officer
Minnehaha Creek Watershed District
18202 Minnetonka Boulevard
Deephaven, MN 55391
Direct: (952) 641-4505
Main Office: (952)471-0590
Fax: 952-471-0682
www.minnehahacreek.or�
.�._1
MINNEHAHA CREEK
wwtERS�EC! QIStRiCt
�Think Green - please do not print this email unless necessary
1