Loading...
HomeMy WebLinkAboutP22-000037 - New HomeCity of Orono CERTIFICATE OF OCCUPANCY This certificate is issued pursuant to the requirements of 1300.0220 of the 2020 Minnesota Building Code verifying that at the time of issuance this structure was in compliance with the various ordinances of the local jurisdiction regulating building construction or use. For the following: Building Address:605 Blossom Circle Orono, MN 00000 PIN:3311823110167 Lot/Block:/ Zoning District: Permit Number:RPS22-000037 Construction Type:VB Residential Occupancy Group: IRC-3 Fire Sprinkler: Owner Name: Owner Address: FOR YOUR INFORMATION For any police, fire or medical emergency - Call: 911 In purchasing a new home, file for your homestead at Hennepin County offices. Register your address for voting, driver's license, and automobile registration. City Water and Sewer is billed monthly. Septic inspection fees are billed annually. Permits are required for any additions or alterations on your property including garages, decks, patios or other accessory structure. Special regulations prohibit any excavation, filling, grading, dredging, tree removal, or construction of any kind within 75 feet of any lakeshore or within 25 feet of any wetlands. Please Note: The property owner is responsible for all Legal/Engineering charges resulting from this project. Due to varying billing cycles, bills may be mailed up to 90 days after the issuance of this Certificate of Occupancy October 24, 2023 LAURA OAKDEN ZONING ADMINISTRATOR October 24, 2023 NICOLE EGAN BUILDING OFFICIAL File #:22-000271 Permit #:RPS22-000037 Address:605 Blossom Circle Orono MN 00000 Description:New 5 unit town home Document:605 Blossom Circle Survey.pdf 1.1 G. Comment, Adam Edwards Comment: City Utilities: Separate utility permits will be required for the sewer and water connections. Adjacent roadway, curbing and drainage structures must be protected. City Utilities: The water service connections must be protected from construction traffic during construction. SWPPP - Sediment/Erosion Control: Perimeter sediment control measures should be installed by the contractor and inspected by the City prior to any work, including demolition. The contractor must provide a minimum 24-hour notice prior to inspection. SWPPP - Street Cleaning: Streets shall be cleaned and swept within 24-hours whenever tracking of sediments or soils occurs and before the site is left idle for weekends and holidays.