AGENDA
NAVARRE WATER PLANT PUBLIC HEARING
TUESDAY, SEPTEMBER 23,1997 AT 6:30 P.M.
ORONO HIGH SCHOOL CAFETERIA
795 OLD CRYSTAL BAY ROAD NORTH
ORONO, MINNESOTA
Mayor indicates this is the time and place for the scheduled public hearing regarding the
rehabilitation of the Navarre water plant.
Mayor confirms that the recorder has the affidavit of publication.
Mayor/Administrator explains the purpose of the public hearing is to provide information
to the public regarding the proposed Navarre water plant rehabilitation project and to obtain
comments from the public regarding the proposed project.
Staff presentation regarding the proposed project.
Mayor invites qui .itions and comments from the public.
Mayor closes the public hearing.
Discussion by Council.
Motion by Council regarding authorization to prepare plans and specifications and obtain
bids for the project.
■'■I
*■']
>
A
rI II
Public A ttendance
Meeting D ate V' /,; /<7 '/
C ouncil
Planning C ommission
Park C ommission
Please fill out the information
REQUESTED BELOW FOR OUR CITY RECORDS.
Other
~T7'€d-i/n>f^rrf fh n -h
NAME (please print)ADDRESS
PRESENT FOR (from agenda)
NAME OR NUMBER
1. vH.4-a7-r
2. \ vs.»‘\<xc*-v^O*J ^
7v~lDc-. ?o/cr SS' I
3.
4.
h‘/c/ /)//)L^T^
V
I
JU4C Ha !(r^S
^'iNj\,^ryA\)/
i i2j,. Cl. 3 y /
r/
viL/\^ .x4^ -^9 :^c QjJrJ /6t A/V'5 -3V.??/
10..
11.
12.
13.
14.
15.
0UfS.4
r CITY OF ORONO2750 Kelley Parkway, P.O. Box 66
Crystal Bay, MN 55323
Phone (612)473-7357 Fax 473-0510
NOTTCF.
^ Council will hold a public hearing in the Orono High School Cafeteria located at
795 Old Crystal Bay Road North on Tuesday, September 23, 1997, beginning at 6:30 p.m., to
consider the improvement of the Navarre Water Treatment Plant, pursuant to Minnesota Statutes,
Swtioia 429.011 to 429. 111. The area proposed to be assessed for such improvement is the Navarre
Water System Service Area. The estimated cost of such improvement is $740,000.
Such persons as desire to be heard with reference to the proposed improvement will be heard at this
meeting.
/s/ Dorothy M. Hallin
City Clerk
•'=
ntffii Ilf-I I fTTi^r
GlTYof ORONO
Municipal Oflkcs
StTMt Address:
2750 Kelley Parkway
Orono, MN 55356
MaHlaf Address:
P.O. Box 66
Crystal Bay, MN 55323-0066
September 9,1997
To: Project Area Residents;
Subject: Navarre Water Treatment Plant Rehabilitation
The Orono City Council will hold a public hearing at 6:30 P.M. Tuesday September 23,1997 in
the Orono High School Cafeteria at 795 Old Crystal Bay Road North to consider the
rehabilitation of the Navarre Water Treatment Plant.
Project Description
This plant provides Iron and Manganese removal filtration and softening for the Navarre water
system. The plant was originally constructed in 1971 and requires a major rehabilitation for
continued effective operation. The existing control systems and the filter media in the plant are past
their usable service life which has resulted in inconsistent water quality. One of the three softening
units is currently not operating because of corrosion problems.
The existing ground water supply exceeds the recommended secondary drinking water standards for
concentrations of both Iron and Manganese, and the water supply hardness levels are above
desirable standards. Rehabilitation and continued operation of this water treatment plant w ill
provide for a long term consistently high quality water supply.
Discontinuing operation of the plant will result in poor quality water that will exceed recommended
standards. The high levels of Iron and Manganese in the raw water supply will cause discoloration,
taste, and odor problems. Excessive levels of Manganese also causes deposit build up that reduces
the capacity of the water supply pipes. The excessive hardness levels cause the build up of calcium
deposits in the supply system and plumbing fixtures, and result in less effective operation of home
appliances.
Project Funding
The sources of funding for the w-ater plant rehabilitation are as follows;
TdcpiMMie (612) 473-7357 • FAX 473-0510
artMun. mm
*--------------------■ ■
V
niiAilfllinii-ih
1. $200,000 from Water Fund Reser\ es. These reserves are available due to water rate increases
in recent years that have enabled the City to set aside funds for major water system
infrastructure rehabilitation.
2. $ 277,000 internal loan from the Building Outlay Fund to be repaid from water operating
revenues (reflected in water rates)
3. $263,000 from assessments on all properties in the Navarre water system service area ($350 per
unit X 752 units) This assessment will be payable over a maximum five year period with
interest. The estimated yearly payment for this assessment at 8% interest is $90.
In the past, water rates w'ere not providing adequate funding for the City's water operating fund.
Over the past several years, water rates have been increased on an annual basis to provide adequate
funding for system depreciation and effective operation ai.d maintenance of the water system. These
new water rates have improved the status of the water fund and have provided cash reserv'es that can
be i:*2;d to finance part of the water plant rehabilitation project.
Based on current trends, the City is planning on maintaining an annual water rate increase of 2.95%
to provide for continued adequate funding for the water system. This will result in a yearly increase
of ^proximately $2.50 per quarter an average quarterly bill.
Project Schedule
The proposed schedule for this project is described below
September 23, 1997 Public Hearing
October to December 1997 Complete Project Plans
January 1998 Open Bids and Hold Assessment Hearing
February 1998 Award Construction Contract and Order Equipment
September to December 1998 Complete Project Construction
A project overview will be presented and public comments solicited at this meeting. Written
comments may also be submitted to the City before this public hearing. A copy of the feasibility
study for this project is available for review in the City offices during normal business hours.
Sincerely;
Grego^^. Gappa
Director of Public Services
1
- 4 *
• ^ .—-A - « 4
-'T •#•'
i--jr'»r^
"T*
;Piiblip fiearirtg
<1 < '.Vr ^ -V ® ^V’ ^ ' ■' ^-^’ ■tr «, r 0^ > 0 f- ___)iL^ E ^
* p'•r
’X
.V
j
^9a
t--
<¥ '
Navarre Water Treatment Plant Rehabilitation
vi' ,
September's, 1997 ^Vr£-'■P:
%
Water quaTity
• 4 *
■ * . '
% • *
• ..’a
•:• Treatment process schematic
J «
❖ Filter schematic
❖ Cost estimate
❖ Proposed schedule . ' -
❖ Proposed financing
"r‘
^.V,r v'
{-
❖ Softener schematic ■ ,/ * ❖ Assessment area , r
❖ Recommended improvements , V*• •• •
i*.‘ Jf_ * *<■ V V / »• <'' *) ,* ► • « •■ ••'^: f ♦ • < •■
-^* >r’ y* * ->’ * *5
t'r :\p^t
A.P.r
m* wv Tf
I «
•y . ' .. '__ ‘it • A't
.T
J
O!
4 1^'
------‘f-»- ■ jr
,
•U
Constituent
■•‘i-Recommended
Secondary StandardW^l No. 1
Iron 0.44 mg/i 0.30 mg/I
Manganese 0.74 mg/I 0 05 mg/I
,
Hardness 334 mg/I 80 -100 mg/I
*
'2'-*
•<
‘ V >:; ^♦ r 4-
■'^". <
» '
f . • <
>V > : t- «
T
f • • e *
" .' T '■'
f • r<-
■ *:
^ .t •‘»,V ♦•' V' t ‘.’.V V _/ ,-t *»> .«•' *. ■*•
y;> * '.> *
A'-
> •’
r
•V^.L
9 ; !?«^Wneh^
.f
4
Ct/
-4^
4
■•V
'■4-
U-^‘
r/* ;
*. r
I
• • <■%
Item
1 niter refurbishment -
2 Softening unit control replacement t-
3 Chlorine solution water line relocation
4 Brine storage tank cleaning
5 Softening unit renovation . • •
6 Softening unit discharge meters
7 Electrical systems replacement 9
8 Automatic control valve replacement
9 Ventilation/dehumidification improvements
10 Controls replacement (SCADA)% '
11 Piping replacement 0
/ * •: i' A r' 't v S /
4^ ■
''r*!.Vr , <
r-vs
%
Jf
A
*C*i
%
f**
• ♦ <1
J .
i
%
VO WO' -V
: 5 I I Item Estimated Cost I
'<
.- P
4
•>
•V
4
1
Item Estimated Cost
1 Filter refurbishment $220,900
2 Softeninq unit cxxitrol replacement 17.000
3 Chlorine solution water line relocatKXi 0.500
4 Brine storage tank cleaning 8.000
5 Softening unit renovation 79.900
6 Softening unit discharge meters 23.400
7 Electrical systems replacement________43.100
8 Automatic control valve replacement 9.600
9 Ventilation/dehumidification improvements 102.500
10 Controls replacr'.ment (SCAOA)73 100
11 Piping replacement 30.000
12 Engineering and contingency 123 200
TOTAL 739,200
A
t«-
tf-
V
• ' < . » ^ ' ‘
W.WL- ;• :;^• • <
-> :I "
r j.A
. »•
‘A »>r
f'
sed P/ofect §fhedu|f; ' --i' v-
^ v>
« ‘ r
«. r
V » , t -' V *"
■>^»»»^» / ' -Xl*-'’ ,■ ■;•
.r
vt
.r
‘1
r<
•«»»' •<
*IT
Date Event
Sepi 8,1997 Schedule Pubic Hearing
WMkofSepI 8. 1997 Advedise and mail notice of pubic heanng
Sept 23. 1997 Pubic Heanng
Oct 13. 1997 Authorize plans and specifications
Oct 13-Dec 1. 1997 Complete plans and speaficahons
Dec 8.1997 Authorize advertising
Week of Dec. 8.1997 Advertise for bids
Jan 8.1998 Open bids
Jan 12.1996 Schedule assessment hearing
Week of Jan 12. 1998 Advertise and mail notice of assessment hearing
Week of Jan. 26. 1998 Assessnrent heanng
Feb. 10.1998 Award construcbon contract
Feb 25.1998 issue Notice>to-Proceed
Feb. 25-Aua 31. 1998 Equipment delivery
Sepl. 1. 1998 Begin construction
Nov. 30. 1998 Cornplete construction
y.4" *>■ y -*/*■ .V ► * ' * ' * » • < * V / »
,■ 4' > ‘.'•v r /■ ;
4"-
4»'rv
4-
.3
♦'
•y?::
1' ""i’
V-
4V -if I
- 4
J
Oi
^ >
^ 4
I* i
-4
4*
lAssessment:.' ^ ^-------^ .. ---------- ------^
' k r *
! '■^, ■- A $263,200
^ . ■ r
>■ •*-2»’
lr
1 V.f /
Cash Reserves:. A
c *• $200,000 :
<* *"
-ri-
4.1
T’
Internal Loan Sewer Fund: $276,800
TOTAL V V
■t i ■
•-
'
• ' ■>1 0 p. • ^ • . •
f' *. *'*
! $740,000 ‘.V.*
y^r •4'-
*:> V' V V-r,;. V V y,;-;;*..f-*>' \ -,
tl
REQUEST FOR COUNCIL ACTION
DATE: September 23,1997
ITEM NO:
Department Approval:
Name Ron Moorse
Title City Administrator
Adminbtrator Reviewed:
Item Description:
Navarre Water Plant Public Hearing
Agenda Section:
City Administrator's
Report
Attachment: Public Hearing Agenda
The Navarre water plant provides water treatment to improve the quality of the water supplied to
Navarre residences and businesses. The water plant provides iron and manganese removal,
softening, chlorination, and fluoridation. The plant is 26 years old and is in need of substantial
rehabilitation. Bonestroo and Associates, the city's consulting engineer, has conducted a study to
identify the specific areas of rehabilitation necessary to ensure the plant continues to adequately
serve the Navarre area well into the future. These needs include the replacement of the three water
softening filters, replacement of the current plant controls with an electronic control system, a
substantial rehabilitation of the iron and manganese removal filter, and ventilation/dehumidification
improvements.
The cost of the rehabilitation project is estimated at $740,000. It is proposed that the project be
funded using the following sources:
1. $200,000 from water fund reserves
2.$263,000 from special assessments levied against all properties in the Navarre water service
area. ($350.00 per property paid over 5 years)
3. $277,000 from an internal loan from the building fund to be repaid over 10 years, with
interest, from water fund operating revenues.
The Council has reviewed a feasibility study for the rehabilitation project, and has authorized a
public hearing to receive comments from the public regarding the project.
After receiving the public comments, the Council will determine whether to authorize the
preparation of plans and specifications and the advertising for bids for the project.
COUNCIL ACTION REQUESTED: r um r
Motion to authorize the consulting engineer to prepare plans and specs and advertise for bids for the
Navarre water plant project.
AGENDA
fell i-crV
1.
NAVARRE WATER PLANT PUBLIC HEARINGTUESDAY, SEPTEMBER 23,1997 AT 6:30 P.M. ORONO HIGH SCHOOL CAFETERIA 795 OLD crystal BAY ROAD NORTH ORONO, MINNESOTA
Mayor indicates this is the time and place for the scheduled public hearing regarding the
rehabilitation of the Navarre water plant.
Mayor confirms that the recorder has the affidavit of publication.
Mayor/Administrator explains the purpose of the public hearing is to provide information
to the public regarding the proposed Navarre water plant rehabilitation project and to obtain
comments from the public regarding the proposed project.
Staff presentation regarding the proposed project.
Mayor invites questions and comments from the public.
Mayor closes the public hearing.
Discussion by Council.
Motion by Council regarding authorization to prepare plans and specifications and obtain
bids for the project.