My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-11-10 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
L
>
Lakeside Trail
>
1925 Lakeside Trail - 34-118-23-12-0013 (690 Brown Rd N)
>
690 Brown Rd N - 34-118-23-12-0007 - OLD (now Willow Bay Sanctuary)
>
Septic
>
1986-11-10 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:53:51 PM
Creation date
5/23/2023 11:51:30 AM
Metadata
Fields
Template:
x Address Old
House Number
1925
Street Name
Lakeside
Street Type
Trail
Address
1925 Lakeside Trail
Document Type
Septic
PIN
3411823120013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />- 0 -ft <br />SYSTEM DESIVI / O \v J <br />FOR ROiIERT WAADE CONSTRUCTION 0 <br />C'RONO, MINNESOTA <br />11-7-86 <br />1. I.ercolation Rate. Typa of System. �! <br />Iri:,ary site(holes 1-2) = 64.0 minutes per inch, Pressure mound system. <br />Alternate site(holes 3-4) = 108.0 minutes per inch. Pressure mound sys- <br />tem if ever needed, but shift toward holes 2 and 3 for better soils. <br />2. Proposed flow Rate. 100 <br />& 4'tedroc-is 0 150 G.P.D. _'0 G.P.D. <br />3. Soil Treatment Area Needed. -7 s D <br />q(O,,M G.P.D. x O.83 factor for at least 12" depth of clean sand •/4'5 SQ. Ft. <br />or a rock bed 10 feet wide by fi2:5Tfeet long minimum. <br />4. Basal Width Requirements. W <br />For 64.0 perc. rate use 5.0 factor x 10 foot wide bed = 50 feet total or <br />40 feet downslope from the edge of the bed. This should amount to greater <br />than a 3: 1 slope on the downslope. Slope other sides at least 3: 1. <br />S. Distribution. <br />Distribution is to be by pressure through to 3 perforated laterals spaced <br />40" apart center to center in the 10 foot wide rock bed. <br />6. Septic Tanks. <br />Two septic tanks, each of at least 1000 gallons are needed. In addition, <br />a third pumping tank and pump are needed for the pressure distribution. <br />Iii alarm device is needed to warn of pump failure. <br />7. Aiditional Information. <br />All construction and materials must adhere to the provisions of the <br />C?ty of Orono. Runoff water should be diverted from the drainfield <br />area. and both the primary and alternate site must be kept free from <br />construction traffic and grading. <br />If any additional information Is needed, please contact me. <br />Sincerely, <br />PERCOR, INC. <br />'1�,�i r `ii <br />Mark S. Gronberg, <br />PGA certified <br />
The URL can be used to link to this page
Your browser does not support the video tag.