Laserfiche WebLink
EXHIBIT A <br />SKI TONKA WELL REHABILITATION <br />QUOTATION <br />March 20. 1993 <br />I I <br />EST I UNIT TOTAL <br />DESCRIPTION UNITS PRICE EXTENSION <br />1. MOBILIZATION OF ALL TOOLS & EQUIPItENT TO BAIL TURBINE OIL <br />FLOATING ON THE TOP OF THE WATER AND DISPOSE OF PER MPCA. <br />TRIP CHARGE <br />1 <br />L.S. <br />S <br />60.00 <br />LABOR (2 -MEN) <br />1HR <br />$97/ <br />$ <br />97.00 <br />PUMP TRUCK TIME <br />1HR <br />$60/ <br />$ <br />60.00 <br />OIL DISPOSAL <br />1BRL <br />$75/ <br />$ <br />75.00 <br />2. INSTALL AIR LIFT PIPING AND JETTING TOOLS TO CLEAN OIL FROM <br />WELL TO INCLUDE NECESSARY FOA11ING AGENT. <br />LABOR (2 -MEN) 6HR S97/ $ 582.00 <br />PUMP TRUCK TIRE 5HR $60/ S 300.00 <br />AIR COMPRESSOR (365 CFM) 1DAY $95/ $ 95.00 <br />3. FURNISH. INSTALL, REMOVE TEST PU11P FOR WATER QUALITY SAMPLING <br />OF WELL. <br />TRIP CHARGE <br />I <br />L.S. <br />$ 60.00 <br />LABOR (1 -MEN) <br />5HR <br />S50/ <br />$ 250.00 <br />PUMP TRUCK TI11E <br />3HR <br />$60/ <br />$ 180.00 <br />GENERATOR <br />1DAY <br />$60/ <br />$ 60.00 <br />PUMPING EQUIPMENT <br />1DAY <br />$95/ <br />$ 95.00 <br />WATER QUALITY SAMPLE <br />1 <br />L.S. <br />S 385.00 <br />TOTAL QUOTATION <br />$2.699.00 <br />+ER W : E.N. RENNER & SONS. INC. requests that this work be <br />paid within 30 days from date of invoic.: with a 1.5% finance charge <br />on the unpaid balance per month. crc; also offer a 2% net 10 <br />discount on the actual final invoice t(.. encourage early payment. <br />