Loading...
HomeMy WebLinkAbout1970-12-11 Memo, Bid Analysis�'l q 5- bi'-" T0: Adninistrator FROM: Inspector PATI:: December 11, 1970 SIIBJECT: Bid Analysis - Village Nell I sent out four bid forms for a S" #ell for the Village and received two back, which I am forwarding with this memo. To the Stevens bid, to equate it with the Renner Well at 200' with a 1 HP pump and an 82 Rallon tank, I added, at Tem Stevens direction the following: Bid on 100' and 1/2 HP pump 510234.00 Ne=t 1.001 @ $6.25 625.00 Extra pump cost for 1 HP pump & A2 Gal. tank 145.00 Extra 20' 1-1/4" K copper for a 40' offset rather than 20' 40.00 Cost of screen over Renner 520 if needed 20.00 Stevens bid 520064.00 529064.00 Renner bid 529250.00