My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-06-16 Septic System Design and Soil Testing
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road North
>
960 Brown Road North - 27-118-23-43-0025
>
Septic
>
1986-06-16 Septic System Design and Soil Testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:22:49 PM
Creation date
3/27/2023 4:18:16 PM
Metadata
Fields
Template:
x Address Old
House Number
960
Street Name
Brown
Street Type
Road
Street Direction
North
Address
960 Brown Road North
Document Type
Septic
PIN
2711823430025
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SYSTE14 DESIGN <br />FOR MAXWELL ALYORD <br />960 N. BROWN ROAD <br />O^ONO, MINNESOTA <br />6-16-86 <br />1. Percolation Rate, Type of System. <br />20.0 minutes per inch. Shallow Trench System. <br />2. Proposed Flow Rate. <br />2 bedrooms 0 150 G.P.D. = 300 G.P.C. <br />3. Soil Treatment Area Required. <br />2.0 percolation factor .r 300 G.P.U. = 600 Sq. Ft. F+nimum. However, it is <br />recommended that 750 Sq. Ft. be installed at this time. <br />4. Size and Number of Trenches. <br />3 trenches 3 feet wide and 83.3 feet long = 750 Sq. Ft. These trenches would <br />be spaced 7.5 feet apart center to center and no deeper than I foot deep in <br />the natural soil, unless an interceptor drain is used to lower the water <br />table. The trenches are shown more toward soil boring # 2 which had a lower <br />water table, since near soil boring q 1, they could only be 0.5 feet deep <br />in the natural soil. Some fill will be needed over the top if an interceptor <br />drain is not used. <br />5. Drainfreld Rock Needed. <br />28 cubic yds. of rock is needed to have 6 inches under and 2 inches over a <br />4 inch distribution pipe. <br />6. Septic Tanks. <br />Iwo septic tanks exist. These should be checked tc, lee if they are in com- <br />pliance <br />rcurrent standards. nt <br />nd <br />respectively are needed. I tappearsthatgrravitywo s 0 <br />flow couldabe usedto <br />reach the drainfield area. <br />7. Additional Information. <br />All construction and materials must adhere to the provisions of Lire City of <br />Orono. All construction traffic must be kept from the drainfield site and <br />runoff water should be diverted.trom the drainfiLld area. <br />If there are any other questions, please contact me. <br />PERCOR, INC <br />�1 a'rk S. Gronberg. <br />PCA certified <br />
The URL can be used to link to this page
Your browser does not support the video tag.