Loading...
HomeMy WebLinkAbout1992-05-27 On Site Sewage Treatment Inspection ReportCITY OF ORONO Municipal Offices Pott Office Dox 66 Crystal fay, MN 55323-0066 ON—SITE SZWAGX TRSI►mR I11151PIRMION REFORT Owner: Airk PZ&11� Address: Permit I' •: aces: Q Contractors: %,9'V ._bn1�► City ordinance saber 100 requires that each on-site semoge treatment system in Orono be iropected on a rt_"lar beefs. Tlta on-site sewpe treatment system at the above address has been inspected and appears to fall Into chi category Hacked below. (This to (k an existing system I ) new construction) "CODE SYSTEM" -A system which moats all the location, design. and construction standards of the current City Codas, and which is operating satisfactorily by treating and disposing of the entire current Some" input without discharging any pollutants into ground or aurfaca motors. "CONFORMING SYSTEM -A system which does not set all the location, design, and construction standards of the current City Codes but was installed according to the code in effect at the time of installation, and which is operating satisfactorily by treating and disposing of the entire current sawmge input without dfsOarging any pollutants into ground or surface motors. "MON-COMFOgMIMG SYSTEM" -A prohibited system; a system located within a designated 100 -year floodplain; any system which may or may not set all the location, design, and construction standards of the current City Codes and which Is failing for any reason; and any system with less than 3 feet of unsaturated soil or send between the distribution device and the limiting soil character is:ics. (Tho limiting soil characteristic JA hes or I ) has not been Wentified at this time. if the limiting soil characteristic has not been Identified, this classification may to subject to revision.) T/ltnk inspection Indicates: V'P�pp�t not nsedsd at this time. 6 Solids accumulation in tanks indicates they should be pumped out this year to help prevent future problems. 7 Solids accumulation in tanks is at a critical level. Tanks should be pumped out as soon as possible. 81 too Is discharging to the surface. Tanks must be pumped out within 4a hours to eliminate surface discharge. V election risers missing -tanks could not be Inspected. Inspection risers (i" die, pipe) must be installed in each tent at next ptapotrt. If tanks have not been pumped out within the last three years, they should be pumped out now. 10 inspection pipe is located directly over tank baffle (does not give mccurate measurement of solids accumulation). if tanks have not been pumped out within the lost three years, they should be pumped out now. D told Inspection indicates: grainfield is dry, no surfscirp evident. 1qr Some evidence of surfacing, not critical yet. 13 Drainfield is saturated and visibly discharging untreated effluent to the surface. Contact the City Inspector ismodistely. Repoirs must be completed within 40 days. 14 grainfield extent and condition unknown. LIMITING SITE FACTORS (slooe.setbacks.etc.): POTENTIAL FOR SYSTEM FAILURE (doi nds on soile.water table.etc.): COMM MTS: Nota: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, be advised that thisreport does not guarantee or certify that an existing system will continue to function properly but is merely an opinion of the mosque of the system under current conditions based on the available information. This report must be kept on the premises with the system location and pumping records. WW111 COPY) Inspectors Fib YELLOW CI)PTMonmeowrw