HomeMy WebLinkAboutFA22-000011 - Fire SprinklerDATE TIME
CITY OF ORONO CALLED IN I. Q
INSPECTION TICE_ SCHEDULED �— �9
PERMIT NO. COMPLETED
ADDRESS & 12 d; las�c - io r
OWNER
TELEPHONE NO.
�t
CONTRACTOR
DESCRIPTION
❑ FOOTING
❑ DEMO -FINAL
❑ SEPTIC FINAL
❑ EXCAV/GRADING/FILLING
El POURED WALL
❑ FOUNDATION WATERPROOF
❑ PLUMBING RI
[I PLUMBING FINAL
ElTREE REMOVAL
[3 RADON SLAB
[I MECHANICAL RI
❑ SITE INSPECTION
❑ RATED WALLS
❑ FRAMING
❑ MECHANICAL FINAL
❑ WOOD BURNEWFIREPLACE
❑ COMPLAINT
❑ INSULATION
❑ FINAL
❑ WATER HOOK-UP
❑ FOLLOW-UP
❑ AS BUILT -SURVEY
❑ SEWER HOOK-UP
ElFOUNDATION/REMOVAL
C1DEMO -SITE
❑ SEPTIC INSTALL
NO
OWNEWCONTRACTOR TO MEET YOU:ES _
COMMENTS:
O
W
W
tt
Q
L'
2
W
Lu
W
ccO
W RKSATISFACTORY: PROCEED
QCZ
Lu❑ CORRECT WORK & PROCEED
O ❑ CORRECT WORK CALL FOR REINSPECTION
U BEFORECOVERING
❑ CORRECT UNSAFE CONDITION WITHIN __ HOURS.
INSPECTOR WILL RETURN
❑ STOP ORDER POSTED -CALL INSPECTOR
❑ INSPECTION REQUIRED. CALL TO ARRANGE ACCESS.
❑ PROJECT COMPLETE
❑ ISSUE CERTIFICATE OF OCCUPANCY
TEMPORARY
PERMANENT
❑ PHOTO TAKEN
❑ CITATION ISSUED
Call for the next inspection 24 hours in advance. (952) 249-4600
OwnerlContracto nn site: C U
Inspector. ff
Canary CopYtSlte Na*e
White CapYllnspector's File-
DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NO C E SCHEDULED
11 s /L ort�s�
PERMIT NO.. !� 7 COMPLETED L 1✓:_
ADDRESS v, G,'t
OWNER TELEPHONE NO.
CONTRACTOR Str ✓'
DESCRIPTION T • ^ \
❑ FOOTING ❑ DEMO -FINAL
❑ POURED WALL ❑ PLUMBING RI
❑ FOUNDATION DRAIN TILE ❑ PLUMBING FINAL
❑ LATHE ❑ MECHANICAL RI
❑ FRAMING ❑ MECHANICAL FINAL
❑ INSULATION ❑ WOOD BURNER/FIREPLACE
❑ FINAL ❑ WATER HOOK-UP
❑ AS BUILT -SURVEY ❑ SEWER HOOK-UP
❑ DEMO -SITE_ ❑ SEPTIC INSTALL
OWNERICONTRACTOR TO MEET YOU: OYES _ NO
COMMENTS:
❑ SEPTIC FINAL
❑ EXCAV/GRADING/FILLING
❑ TREE REMOVAL
❑ SITE INSPECTION
❑ RATED WALLS
❑ COMPLAINT
❑ FOLLOW-UP
❑ FOUNDATION/REMOVAL
❑ CORRECT WORK & PROCEED
❑ ISSUE CERTIFICATE OF OCCUPANCY
❑ CORRECT WORK CALL FOR REINSPECTION
TEMPORARY
13EFORECOVERING
PERMANENT
❑ CORRECT UNSAFE CONDITION WITHIN —HOURS.
0PHOTO TAKEN
INSPECTOR WILL RETURN
❑ STOPORDER POSTED. CALL INSPECTOR
0 CITATION ISSUED
❑ INSPECTION REQUIRED. CALLTO ARRANGE ACCESS.
_
Call for the next inspection 24 hours in
advance. (952) 249-4600
Owner/Contractor on site:
Inspector V + �
❑ WORK SATISFACTORN. PROCEED
.PROJECT COMPLETE
❑ CORRECT WORK & PROCEED
❑ ISSUE CERTIFICATE OF OCCUPANCY
❑ CORRECT WORK CALL FOR REINSPECTION
TEMPORARY
13EFORECOVERING
PERMANENT
❑ CORRECT UNSAFE CONDITION WITHIN —HOURS.
0PHOTO TAKEN
INSPECTOR WILL RETURN
❑ STOPORDER POSTED. CALL INSPECTOR
0 CITATION ISSUED
❑ INSPECTION REQUIRED. CALLTO ARRANGE ACCESS.
_
Call for the next inspection 24 hours in
advance. (952) 249-4600
Owner/Contractor on site:
Inspector V + �
White Copygnspector's File Canary COPyIShe Notice