Loading...
HomeMy WebLinkAbout1995-04-16 Soil ReportS -P TESTING, INC. Steven B. Schirmers — MPCA Ceit. No. 627 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497.3566 April 16, 1995 Bryson & Myers Cluster System Big Island Orono, Henn. Co., MN This On -Site Sewage Treatment System is Designed for a Type 1, two bedroom home for each site = 600 gal/day. Each site is an actual Type 11, two bedroom. Designed in accordance with the Minnesota Pollution Control Agency Chapter 7080 and loyal ordinances. This system is designed as a cluster system due to very limited space for adequately treating septic effluent. The proposed system is a 10"dia. graveless trench located at cabin A, the Bryson property. Recommend an easment & maintenance agreement be made between the 2 land owners & the City of Orono. The soils on this site are a clay loam. A seasonally saturated layer of soil was found at 66" to 78", (mottled soil). The bottom of the system must be located at least 3' above the seasonally saturated soil. The soils at a depth of 30" have a percolation rate averaging 15.6 min/inch. A pumping chamber will need to be installed to lift the effluent to the treatment area. The power supply and switches must be located outside the manhole and pumping chamber in a weather proof enclosure. A warning device must be installed with a light and sound device, this is in case of a pump failure. Due to the system being seasonally used, the ta..ks must be insulated to prevent freezing during winter months. The accumulation of sludge should be inspected no less frequent than every three years. The disposal of sludge should take place whenever the top of the sludge layer is less than 17." below the bittom of the outlet baffle cit, why nr•:ar bottom of tho scum layer is less than 1" above the bottom of the outlet baffle. Removal of septage shall include complete removal of scum and sludge. A water meter must be installed at each cabin to monitor the daily water use. Due to this site being the only area available for an On -Site Sewage Treatment System, recommend to install low water use facilities, 1.6gal/flush toilets, low flow shower heads etc. Bryson & Myers Cluster System Big Island Orono (2) Keep all heavy equipment off of the proposed treatment area before and after construction. The treatment area should be marked off before construction. This Design is not valid & the system will need to be relocated if failure to protect the areas proposed for On -Site Sewage Treatment occurs. With proper installation and maintenance, this system should have no problem in treating septic effluent effectively. Nothing other than gray water (laundry, showers, etc.) human waste & toilet tissue should be disposed into the septic tanks. Garbage disposals are not recommended. Excessive amounts of soaps, cleaning agents & chlorine agents may kill the bacteria needed to treat septic effluent. Additives are not recommended. Recommend to pump & clean your tank through the manhole by a certified pumper every year if you have 1 tank and every 2 years if you have two tanks. Note: Uue to this site being very difficult for a pump truck, recommend to inspect the tanks for the level of sludge as noted elswhere in this letter. ��16 Steven B. Schirmers SITS/ds 0 FA .i •d ji zr 10 c 2 O N L1 01 �v c A �c u N L u s V) z O 15-- w w J LL) 0 'I_ 0: O m J O V) Z n N � N 77Io Z 2 n v o� °1 - r o� Flo ; V) z O 15-- w w J LL) 0 'I_ 0: O m J O V) CL C n N � N 77Io Z 2 n v o� °1 - W ;l N o� Flo (n o o N ro n ant:= go � T �• — a s N O 1�ci 0 Y H 0 41 _1 W "J W F- CO a Ni , Ln�Q 0 T- ii:c T- i- t-- I-- ►- P w u CL ro w n n N � N 0 N E d n v o� °1 - W ;l N U Flo g v o N ro n ant:= •� d $ 1 o N (� 1 s N O 1�ci E E E E Y H Xi fi , 0 N V) to M O ILI CL w o 0 0 n 0 N E d n v = °1 - W ;l N O1 . c Flo g v o N ro n ant:= •� j ` E EE F. s J E E E E Y H O � w o 0 0 n 0 N E d n o °1 - W ;l N O1 . c O 'J , T V W O = J N u a S Y H C E , V) to O � n G � n S V W ;l N J O 'J T V O = J Ld 10 0 D CL e 0 a E c L' 7 o tD � u u� v a� O }c In* \ h m VI O -G �o U 0 Z c o i Fu p, Cro y LX \n c Cl wlj L a •z v -� � y J ` Q C O t l W O Y, z J U (t 4 €cryl I a -0 C* V P N o N N p 9 O u O 76 7 L C C." c o o u E _ n o 0 V '(\J Vn N e O O d u I d r(i •J �� \ E 1n _� � Z d o g' r�• O u L u It) rY d. i INDIVIDUAL Sl:%VAGl:'I'RL•A'I'MENT SYSTEM WORKSIME`1' LAYOUT (Use other side) 1. Select an appropriate scale; one square = feet. 2. Slow pertinent property boundaries, right-of-way, casements. 3. Slaw location of house, garage, driveway, and all other improvements, existing or proposed 4. Show location and layout of sewage treatment system. S. Shaw location of water supply well. 6. Dimension all set backs and separation distances. D-25 Gwrtd Se -age rkm 0 GA -0 ps Dq (sr." FLOW A. Estitnatctl (,.00 glxl Cit-�,rc.:.,vc}K LtA1:t►1� r�F•tter measured ---- x 1-r- gpd �tv �- y s•..1)es erg SEITIC TANK VOLUME It. _ - Jno p gallons. Type IV SOILS (Site evaluation data) C. Depth to restricting layer = 51-(.4'(0 1. -(." feet D. Maximum depth of system C - 3 ft = 'A . S S feet E. Percolation rate P�- C. _ MPI F. SSF /,b7 sq f /gpd ata TREN =11 BOTTOM AREA It. For trenches with 6 inches of rock below the pipe: 212 A x F = (&Q_ x 4th =/V_& sq ft of bottom area 1. For trenches with 12 inches of rock below the pipe: 315 AxFx0.8=,_x__x0.8=_.sghofbottom area I. For trenches ,with 1S inches of rock below the pipe: 150 AxFx0.66= x x0.66=_sq It of bottom area K. For trenches with 24 incites of rock below the pipe: 6 AxFx0.6= x_x0.6-._sgftofbottom area 523 BED BOTTOM AREA L For seepage beds with 6 or 12 inches of rock below the pipe; luso 15xAxF= 1.5x_x_-_sgftofbottom area 370 ROCK VOLUME W CU FT M. Rock depth below distribution pipe plus 05 foot times bottom area: 675 M =Rock depth + 6 inches x Arca (H,I,I,L,K) (—+05fl) x_= cu ft ROCK VOLUME W CU YDS N. Volume in cu ft divided by 27 h1+27=cu yds _+27=_cuyds ROCK WEIGHT O. Cubic yards times 1.4 = tons NxIA=tons x1.4=_tons DISTRIBUTION (Check one based on slope) _ Bed (less than 6% slope) Trenches _ Drop boxes (any slope) Distribution box (level to slightly sloping) TRENCH LENGT1f P. Select trenchwidth = �3,0_ It ° 10u-64- 0o-A.Q. Q. I)ivide bottom arra by trench width: (11, 1, I, or K) + P= lineal feet Its + ,? =Mj lineal feet LAWN AREA R. Select trench spacing, center to center - jo• feel C t h111irIv trench --i in^ by line feet R x 0 - s9 ft of I.n,•n arca I - -- %. -- — -- _' sq It LAYOUT (Use other side) 1. Select an appropriate scale; one square = feet. 2. Slow pertinent property boundaries, right-of-way, casements. 3. Slaw location of house, garage, driveway, and all other improvements, existing or proposed 4. Show location and layout of sewage treatment system. S. Shaw location of water supply well. 6. Dimension all set backs and separation distances. D-25 Gwrtd Se -age rkm 0 GA -0 ps Dq (sr." MMYc.ma. �(r C.�.�� Iledrooms)) r�F•tter erg Type 1 T)pr 0 Type 01 Type IV Ik&oM4 5 or 6 1.500 2.250 7 or 8 2 300 223 110 ata 3 450 300 212 • a rao 315 256 •� 5 150 450 294 6 900 523 332 re 7 luso 600 370 •�� t 1200 675 409 Natnba Of MMYc.ma. �(r C.�.�� Iledrooms)) r�F•tter 2 or less 750 1.125 3 or 4 1.000 1.500 5 or 6 1.500 2.250 7 or 8 2.000 3.000 over 9 See fir. C.6 (x 1.5) 6 inches= 0% Reduction" 12 inches= 20% Reduction 18 inches= 34% Reduction 24 inches= 40% Reduction • sizing for gravelless trench 6-24 inch Below the 11 3�t o tti %.o 1. uvavw. Figu►c D-26 Z)m" n...t.... Uv r�F•tter a" nd — 1%05 0� 110 .1bsW- t;� 1p O4O ttoIS127 010 16to30 167 Oj0 31to4S 200 030 Kto40a 210 0.45 S.a 1r'wa tat � ww � twr � wf V rl 6 inches= 0% Reduction" 12 inches= 20% Reduction 18 inches= 34% Reduction 24 inches= 40% Reduction • sizing for gravelless trench 6-24 inch Below the 11 3�t o tti %.o 1. uvavw. Figu►c D-26 Z)m" WIZSLLLCMN PRI)CEDURE- A. Determine pump capacity: Gravity Distribution 1. l0inimum suggested is 600 gallons per hour (10 gpm) to stay ahead of water use rate. 2. Maximum su�ivcry to a drop box of home system is 2,700 gallons per ho L(45 gpm) l Frevent build-up of pressure in drop box. Pressure Distibution 3. a. Select number of perforated laterals _ b. Select perforation spacing = feet C. Subtract 2 fL from the rock layer length. - 2 If: -' feet d. Determine the number of spaces between perforations. Length perf. spacing = _ ft.4----ft--- spaces C. _spaces+ 1 = - = perforatiotsllateral f. Niultiply perforations Tier lateral by number of laterals to get total number of perforations. u, x t��_ perforations. g' --"Ww x a .t:.i -- 9pm- SELEM'D PUMP CAPACITY 4 ' gpm "Ak . B. Determine head requirements: 1. Elevation difference between pump and point of discharge. IS-- feet 2. If pumping to a pressure disWbutlon system, five feet for pressure mluired at manifold if gravity system, zero. feel 3. Fnction loss a. Enter friction loss table with Rpm and pipe diameter. Read fnction loss in feet per 100 feet from table. F.L. = ' •- ^ r ft./ 100 ft of pipe b. Determine total pipe length from pump to discharge point. Add 25 percent to pipe length for fitting loss, or use a fitting loss than. Equivalent pile length - 1.25 times pipe length = x115=_vs._feet c. Calculate total friction loss by multiplying friction loss in, ft/ 100 ft by equivalent pipe length. Total fnction loss = '� `/_ x J 0 L-• l()0 = v feet 4 Total head required is the sum of elevation difference, sp(etal head r quirenwnts, and total friction loss. --1 S - + - --- ' 3 (I) (2) (30 (. i Al. Ill_\D _ _ Icct C. I'untp selection 1. A pump trust be selected to deliver at least ti a_),pm (Step A) with at least _i`d_ feet of total tread (Step l3). 1-A -C F-17 [Y` r(AFOnAT!f)r tr . 11WO ATID LArraM Rrquurd Pertoranon tftuhT u! p alma per nunu!r (Rpml lase harge 069 020 (len) 12 0.96 I.Oa 0.56 0.74 2.Ob 0.80 h(ti.I � w \w.• b. Use for all ether appliranots 0A8 18 Rrquurd Pertoranon tftuhT u! p alma per nunu!r (Rpml lase harge 069 020 (len) 12 0.96 I.Oa 0.56 0.74 2.Ob 0.80 1.04 a. Use for single famil% l:^:nes b. Use for all ether appliranots I Pipe Length Point of Discharge T /o b lacvaunn bdferenee f'wnP ii f -18b 1.5 Inch 2.0 inch 1.0 inch rpm F.w, k- P. bund 1-1- 10 069 020 12 0.96 0.28 11 1.28 0.38 16 1.63 0A8 18 2.03 0.60 20 2.47 0J3 U.11 25 3.73 1.11 0.16 30 5 23 1.55 0.23 35 790 2.06 0.3() t:.;i OaS 50 3.99 0 58 55 4.76 0.70 60 5.60 0.82 CIALTIFLVA'i'l(m J UU62/ I,�'l.: of soil Location or Project Bryson & Meyers, Cluster System, Big Island Orono Borings made by S -P Testing, Inc. Steve Schirmers Date 8-15-94 Classifiction System: AASIIu USDA -SCS X. Unified Other Auger used (check two): (land X or Power , Flight or Bucket X Depth, Boring number ^ 1 Depth, Boring number 2 in In 108.2 feet Surface elevation 103.4 feet Surface elevation 0 Topsoil dark brown loam 0 Topsoil dark brown loam 0 - 6" 0 - 8" Brown loam Brown clay loam 6" - 1-1/2' Brown clay loam 2 - 841 _ 2'211 2 - 1-1/2' 3 - 4 - 5 - 6 - Brown loam 2.'2" - 6-1/2'-mott 7 - Rusty olive brrwn loam End of boring at _ 8' feet. Standing water table: 1�1•r!,n1!t .l1 fef'1 (�r .?�.�,t F1. a Lul hc,rincj. Not lu went in hole X Mottled soil: Observed at 6-1/2' feet of depth. Not present in hole _ Comments: 3 - I Brown loam strong 2-1/2' - 3'10" Brown loam 3'10" - 6'2" -mot Rusty olive brown loam _602". _ 8' End of boring at 8' feet. Standing wager table: present r_ f.., or depth, 11c:ut ts: tt,'1 I/ori"y. Not present in hole X Mottled soil: Observed at 612" feet of depth. Not present in hole` Comments: I qq tL'RT11 IC�S'I'lt)1; d UUI,Z! l.0 :; cit Soil_ 13ur iny:; Location or Project Bryson & Meyers, cluster system , Big Island Orono Borings made by S -P Testing, Inc. Steve Schirmers _ Date 8-15-94 Classifiction Syatem: AAS1I0__; USDA -SCS X Unified Other Auger used (check two): (land X , or Power , Flight or Bucket X _ 3 Depth, Boring number 4 Depth, Boring number P g in in 106.1 feet Surface elevation 104.2 feet Surface elevation 0 - - -- — 0 - _-• -•• •- Topsoil dark brown loam Topsoil dark brown loam 0 - 10" 0 - 10" - Brown clay loam Brown clay loam 2 - 2 10" - 2'4" 3 - 3 - 10" - 3-1/2' Brown loam w/traces of sand 4 - 4 - Brown loam 5 - 5 - 3-1/2' - 5-1/2'-mottl d 2'4" - 5 -1/21 -mottled 5-1/2 lusty olive brown loam 5-1/2' 6 _ 6 - 5-1/2' - 6' Rusty olive brown loam 7 - 7 - 5-1/2' - 8' E'nd of boring at _Q_L_ feet. Standing water table: ,,, f.., , • r„ how :; of tet r,ot iny. Not present in hole——x Iottled soil: Observed at 5-1/2'Ieet of depth. Not present in trole—_ Comments: 8 - End of boring at S' feet. Standing water table: r i �• ,� nt ct ,.,.t of depth, hours after boring. Not present in hole X Mottled soil: Observed at 5-1/2' feet of depth. Not present in hole Comments: CI:R'I'.I:nur�,1 l 1'HICOLATION •I ESI. DATA S111•:I"A S -l' Testing,Inc. 8-16-94 9:15 K" 111 1'cri,Ldl•nI 1; ••t I; adnlir. n1,u1: hs ----- ---t,n _-------`r.aUng at II.n, flryson6Meyers,Dig Island 1 8-15-94 lest 11,11e I-K.unr11 _ -- —• 1101c nun11><r ---. Date hole %%a%prcparctL-. --- Depth of h,1lr h,1n•uu 30 unites. Diameter of hole--.- -- .N,111 1,111 dh1.1 Iran ICN htdc Depth. melte% Sud Irsturc 0 - 8" 8" - 26" 26" - 30" Topsoil dark brown loam Brown clay loam Brown loam - - — - ---- - - �---- Method of scratching sdewall-fie Depth of gravel in bollum of hole 2 Inches 8-15-94 2:30ptn 12 Date and Mout of initial walet Idling_ I k pth of lmual w,ucr (111,,,: _---_nKhes above hole bulatnt Method used to maintain at least 12 inches of water &pol 1n hole for at Icast 4 hours Automatic siphon _ _ Maximum water depth above hole bultom during lest 6 inches -- --- - into - - 1 title Interval. Honore% - Afcawlellient, Incite% - --- - t Drop III Willer h•vel. Inches I'crenlaliatt rale• minutes per Inch Remarks 9:00 ill b 9:159:45 —_pref " 3-1/4 9.2 30 min 9.'�"i~ _ 10:27 " 3-1/8 9.6 -- " " 1!1:32 11:02 " 3-1/8 9.6 Percolation tate = 9.5 minutes per inch. CI.131T.100627 111-IRCOLATION TEST DATA SHE B'1' r� S—P Testing, Inc. 8-16-94 9:16 pn �Lnnn_ aL-- p 1'ctraLtuunst tetradinttt'� g. made hr y�t 8-15-9 4 Dryson&Meyers,Dig Island 2 Test hole location . Hole numbler —. Date hole wa< Incl,•uc.L-- _--.--- Dcpdt til Iwlc iwtiunt 306 inches. Diameter of hole—'nches sell Bala Icon+ te%I little: WIWI, i1'chc% still te"Iut: 0 - 6" 6" - 18" 18" - 30" Topsoil dark brown loam Brown loam Brown clay loam Method of scratching sidewall Knife Depth of gravel in bottom of hole 2 u:ehc� 8-15-94 2:30ptn 12 Date and hour of initial water filling—.-. --- _ --. Dcl,th of initial water '11111'1• -__ +nchcs above hole Ixtttan Method u%cd tet maintain at Ieast 12 inches of water depth in hole fog at least 4 hours Automatic siphon 6 Maxintunt water depth above hole button► during test inches ; intc —_--Tune - interval. minutes -----_-- ----- Mca.urcment. Inches --------•-- -- Ulop In water level. inchc" _ 1-1/4 TPercolation rate. minutes per inch Remarks 24.0 -- — 30 min Water reglaining 9:16 9:58 10:31 in test 9:46 10:28 11:01 hole 6 Percolation rate = 2 4 .0 minutes per inch. CERT.100627 PERCOLATION TEST DATA SHEET 917 1'erculatiun test rcaJutEs made b�• S—D' Testing, Inc* 8-16-94 on starting al p tn. '`"" 8-15-94 Test hole Irxauor ole number Dryson&Meyers, Big Isla 11 3 • Date hole was prepared Depth of hole bottom 3 0 inches. Dianxter of hole_ 6 inches Soil data (roll, test 1101c. Soil texture Depth. inches — 10" To soil dark brown loam 0 10" — 30" Drown clay loam Method of scratching sidewall Depth of gravel in bottom of tole 2 inches 12 8-15-94 2:30pm iriches above hole bottom Date and Dour of initial water filling . lepth of initial water filling ..,,....... Method used to maintain at least 12 inches of water depth in hole for at least 4 hours %+u ���l�a �-� L—.. ..-- Ptaximum water depth abuvc 1K,le Nutom during tcsL 6 inches Percolation ?ime rate, Remarks interval,TNIcasurentent. Utop in watctmxlevel. inches minutes Ixr n►ututesinches inch 9:00 prefill 6 5/16 2— 13.0 30 mi — 9:17 9:47 „ 2-1/4 13.3 9:59- 10:29 10:30 11':00 2-1/4 13.3 petcolation rate a 13.2 .ninutes per inch. 12009 West Hilloway Road Minnetonka, Minnesota 55305 October 23, 1995 Mr. Stephen Weckman On -Site Systems Manager City of Orono P.O. Box 66 Crystal Bay, Minnesota 55323-0066 Re: On-site System, 660/670 Dig Island Dear Mr. Weckman; In accordance with the condition on your approval of the design for the reference system dated 6/29/95, a copy of the "Septic System Construction, Easement, and Maintenance Agreement" dated 8-21-95, and executed by the two property owners, is enclosed together with a copy of an as-b>>ilt survey of the installed system by McCoombs Frank Roos Associates, Inc. dated 9/29/95. The survey is an attachment to the Agreement. We trust that this submittal satisfies the condition of the approval and ask that receipt be acknowledged by signature to a copy of this cover letter. Thank you for your consideration. Very truly yours, rl Mason C. Myer enc: Agreement 6/29/95 Survey 9/29/95 cc: W. Bryson Listed a closures received: E. Prince - By: Position: l file: sepsys Date: �7—_