Loading...
HomeMy WebLinkAbout1989-09-27 Septic System ApprovalCC)P CITY OF ORONO Peradt # SEPTIC SYSTEM APPROVAL Fee $ Entered ST The General Contractor will be given a copy of this report and is responsible for its distribution to all sub -contractors. septic spsten design is not considered as approved unless this sheet is attached_ LOCATION: GEKW AL CONTRACTOR: 004- r SEPTIC CONTRACTOR: 9 PBOWN: ❑ APPROVED [] CONDITIONALLY APPROVED: Note Changes Belot--- C MMENTS :_ ��, Kc� � 900 -,w D - /4 DC7 iO VI N Q� • /i/ //[ AJ /ice/N"A, Qi�i� wA ?1 C-' _,7 S N 4.,- t) e'pric N6. _,xj0"_Cr. //-CfMaP ! T I Q i /2*, P U 1 .NOTICE TO INSTALLERS: Any changes to the approved plan and specs must have prior approval of the Inspector (473-7357). Call for inspections 24 hours in advance. HOTICS TO GSL CONTRACTORS: Drainfield sites must be protected prior to and after system installation to avoid Drainfield areas must be fenced off to elicompaction of the natural soil. minate all traffic over them. Date Approved By