HomeMy WebLinkAbout1989-09-27 Septic System ApprovalCC)P
CITY OF ORONO Peradt #
SEPTIC SYSTEM APPROVAL Fee $
Entered ST
The General Contractor will be given a copy of this report and is
responsible for its distribution to all sub -contractors. septic spsten
design is not considered as approved unless this sheet is attached_
LOCATION:
GEKW AL CONTRACTOR:
004- r
SEPTIC CONTRACTOR: 9
PBOWN:
❑ APPROVED
[] CONDITIONALLY APPROVED: Note Changes Belot---
C MMENTS :_ ��, Kc� � 900 -,w D - /4 DC7
iO VI N Q� • /i/ //[ AJ /ice/N"A, Qi�i� wA
?1 C-' _,7 S
N 4.,- t) e'pric
N6. _,xj0"_Cr.
//-CfMaP
! T I Q
i /2*, P U
1
.NOTICE TO INSTALLERS: Any changes to the approved plan and specs must have
prior approval of the Inspector (473-7357). Call for inspections 24 hours
in advance.
HOTICS TO GSL CONTRACTORS: Drainfield sites must be protected prior to
and after system installation to avoid
Drainfield areas must be fenced off to elicompaction of the natural soil.
minate all traffic over them.
Date Approved By