HomeMy WebLinkAbout1984-04-11 Subdivision Soil Test ReportMichael O'Donnel I, PE. CONSULTING ENGINEER April 11, 1984 Painter's Creek Development Criporation c/o Ron Bastyr and Associates, Inc. 15500 Wayzata Blvd. Wayzata, MN 55391 RE: Subsurface Exploration and Percolation Testinq at the Proposed Painter's Creek Development Site in Orono, Minnesota Gentlemen: This report presents the results of supplementary test pits and percolation tests conducted for the proposed Painter's Creek D-1velopment in Orono, Minnesota. Since the reporting of the soil tests dated December 9, 1983, the number of lots planned for -this site was reduced from twenty to ten. Soil testing was requested by the site planner and the City of Orono in the general area of lot 9, as well as additional testing in other areas. The testing was conducted in a similar manner as that described in the soil report dated December 9 The method of locating tests and test notation was also the same as shown in the earlier report. Basically, two test pits and four percolation tests were performed in a primary drain field area, and one test pit and two percolation tests were performed in an alternate area. 19,14 701h Ak. nuc Noah 111.•ckcr. rZ:gIs '.0%` J Page two April 11, 1984 For your review, the field sheets are included with this report. A summary is shown below: .1 Oc-,�K5 LOT DRAINFIELD DEPTH T F . PERCOLATION RATE IN. IN. A l2 11 #21 N3 M4 AVG. A 45 42 7 11 12 16 12 8 A 42 -- -- -- -- 9 A 48 42 30 9 11 11 15 B 48 10 8 9 10 A 44 50 10 14 9 9 11 B 60 15 11 13 The summary indicates the depth of mottling ranges from 3 1/2' to 5' in the areas tested. Since the terrain is rolling, a curtain drain is advised to be included in the drainfield design in order to intercept runoff water from entering the drainfield area. This recommendation was discussed with the site planner. The summary also indicates a relatively fast percolation rate for the fine-grained soils at this site. It should be noted that percolation rates do vary as dependent on the season, precipitation, and general soil conditions. Because soil conditions and permeability characteristics are variable across the site, it is recommended that the stakes defining the drainfield areas be surveyed. Page three April 11, 1984 If I can be of further assistance to you, please contact me. Sincerely, Michael O'Donnell -a(,i dos 'ana. zu ;It.n Art"-. • 11' TSI 7i v t 09 cl 1 '\ - elf - .•�. / / 1 ,' 1 '�. \ ' f.( 'i 1 •�� t • i tent \ 1 1 / tl , / / ilii \.•' 1� / 1• I \ � ; I / • t J 1 \ - ' i 1 1 1• jt 7- • Qt \ •1 \ 1 1 '/l t 1 • t�, 1 } IS su IIL-709 do. 1 !stj 'I . • 9Z•i 011.11Q /nFi� , ! � / • PROPOSED DRAINFIELD AREAS LOTS 7, 9, 10 PAINTER'S CREEK DEVELOPMENT ORON0, MINNESOTA I'CRCOLATION TEST DATA 1 KVjLt, I . %- 1'\f r`r I Z ICV LI✓ V!- I 'Ij I 'UU NU. TEST HOLE LOCATION, /.] AL.Tt4N AT ►POLE DATEPRE►ARCO, 3/2-.43/2- / BQ DIA4IETERI_ INCHES NO. OE►TNI INCHES SOIL. rROFILE DEPTH (INCHES) CLASSIFICATION (ASTM, 024541 i1 o - 15 CLI :.`I SI c.? 'T/LAtt op-f-kwc Ni-A�C JS"— X0'1 Sl0-`! CLay (�2owN (A) *1 CL tea„-`�(o.I SAN�y SILT �Q.cwN � GQA`I nrtorlL_4I1� METHOD OF SCRATCHING SIDEWALL DEPTH OF PEA-SIZED GRAVEL IN BOTTOM OI HOLE, INCHTS -3/ZS- N „� INITIAL FILLING CAM TIM91 - I WATER DEITN OF IN TIAL FILLING. ABOVE HOLE BOTTOMI � Z INCHES TIME INTERVAL WHIN ALL WATER FROM INITIAL FILLING SEEPED AWAY MIN. METHOD USED TO MAINTAIN AT LEAST IS INCHES OF MATER OCPTH IN HOLE FOR AT LEAST • HOURS, 1' CONO'TIONS AFTER SOAwINO FERMI. Ir _ OF STARL /N4 L.4,J A,T 1Q PERCOLATION TEST READINGS BV1 C -q Aa- / 1QNN 4 7 , S DATE PERCOLATION TEST STARTEOI TIME, Ml- -A.64- MAIIIMUM WATER DEPTH ABOVE HOLE BOTTOM DURING TES*, INCHES TIME TIME INTERVAL MEASUAEMENT (INCHES) DROP IN WATER LEVEL PERCOLATION RATE IMINUTES REMARKS (MINUTES) (INCHES) PER INCH) �0 31 % 27 S3/B14 4 G V -L s - Am = �S .s s ' Z Sq •, r U = PERCOLATION RATE SIN/INCN -- 1'CRCOLATION TEST DATA PROJECT: PAIu 4-#- .S. CQ.1-LK !.� tYtcoAn�tNT- JOI; NO. 10 /O , - tj F- Ak ""4 TEST NOL[ LOCATIONI NOL[ NO. _ `10 Z� DAT[ PREPARE01 DIA/M[TERI INCHES D[►THI INC►/[f SAIL PROFILE DEPTH (1NCNEll CLASSIFICATION IASTMI 084081 /Z" �LAyEY ALT TAActi oR.f.AN1'� o-Jq Rc.4 C!AY AT etUr m . w 514:r &Qa6,N 6Ra� n�c�-Te.♦� , rHoiST �M �� MCTHOOOFSCRATCHING SIOCWALL DEPTH Of PCA -SIZED GRAVEL IN S/OTTOM OF NOLO INCHES 3/2 A. ,,;�- TIME1 INITIAL FILLING DAM Z MATER DEPTH Of INITIAL FILLING. A[OVE HOLE [OTTOMi INCHES TIME INTERVAL WHEN ALL MATER FROM INITIAL FILLING SEEPED AWAY MIM. METHOD USEO TO MAINTAIN AT LEAST It INCHES OP WATER DEPTH IN NOL[ FOR AT L[AfT • HOURS. CONDITIONS AFTER SOAKING PER100i PERCOLATION TEST MCADINGS RVI 1' L O I ON A/ �f 3 S� OAT[ PERCOLATION TEST STARTEOI TIME. A.M. r -M rI MAXIMUM WATER OC►TN ASOVE NOLC •OTTOM OURING TESTI INCHES TIME TIME INTCRVAL MEASUREMENT (INCHES) DROP IN WATER LEVEL PERCOLATION RATE (MINUTES REMARKS (MINUTES) (INCHES) FEA INCH) .off 23/ (a �2B S%z iD ; q o 60 /0 AVE. - io 2;/ 1.0 3 3S/ 7 (o q 3 _Y1_ o Avti. = 9 I[RC OL ATION RATE yIN/INC1� PCRCOLATION TEST DATA n Al NTtR IS CkAA-r- PROJECT: 1 JOU NO. /O A _ AQ~� PQrftI AR_Y HOLE TEST HOLZLOCATIONI ._�^ DATEPREPAR[Oi 3/z4 lB4 DIAMETERi INCHES O[PTH/ NO. / Z INCHES SOIL PROFILE DEPTH (INCHES) CLASSIFICATION (ASTM% 074241 CLAYiY 1 c r Y c c.A ioAj 4.1 N ' Ar b4ArN o C � A gL11 5Am&f Il,?' C32owNt GQAY isier)c.4A I M(THOOOF SCRATCHING SIDEWALL �_ DEPTH OF &9"1290 GRAVEL IN BOTTOM OF HOLCI INCHES INITIAL PILLING DATE% 3 2 S Tlw[I A, r" Z WATER DEPTH OF INITIAL PILLING, ABOVE HOLE SOTTOM% INCHES TIMI INTERVAL WHEN ALL WATER FROM INITIAL FILLING SEEPED AWA` MIN, METHOD USED TO MAINTAIN AT LEAST 17 INCHES OP WATER DEPTH IN NOL[ POR AT LEAST • HOURSi CONDITIONS AFTER SOAKING P[RIOOi r 8 N 40 F ST,AN4 r AJ4 w4.r iQ_ rG.NA D' PERCOLATION TEST READINGS BY. • 3 7 • �"- OAT[ PERCOLATION TEST STARTEDr TIM[% A.M, .- / I MAXIMUM WATER DEPTH ASOVE HOLE BOTTOM DURING TESTI INCHES TIME TIME INTERVAL MEASURE (INCHESS)) DROP IN WATER LEVEL PERCOLATION RAT[ (MINUTES REMARKS (MINUTES) (INCHES) PER INCH) 114 4 Vs /3 :s j74- 4° 03- ;�s -4 Z. 1 R r AV r PERCOLATION RAT[ "INANCH