Loading...
HomeMy WebLinkAbout1992-06-05 Septic System ApprovalTY OF ORONO Permit t �.I SYSTEM APPROVAL Fee $ F ti ;'.-, .• Entered By of this this report and is The General Contractor will be given a copy DESIGN IS for its distribution AS APPROVED UNLESSnTHIS SHEETtISsATTASCHLDC SYSTEM LOCATION: PflONS: GENERAL CONTRACTOR: P—___._______ SEPTIC CONTRACTOR: HONE: PHONE:i_. OWNER: T 1i ��� -- APPROVED (Note Changes Below) CONDITIONALLY APPROVED: COMMENTS: st NOTICE pproC aTO l ofl�theAinsp inspector (477 7357)$ to Call forpinsp ctiroved ons 24 hours lans and pinsadvance have prior NOTICE TO GENERAL CONTRACTORS■ Primary and alternate drainfield sites MOST be protected prior to and fter system installa:_on to avoid compaction of the natural1- a ion ALL DRAINFIELD AREAS MOST BE PENCED Of? prior building pourtfootingstwill and notfencing be granted remain in place until final aite grading. Approval until the Inspections Department has verified that primary and alternate sites ars adequately protected. so VEHICULAR TRAIlIC OF ANY MIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' of tested drainfield sites either before or after system construction. This applies to the lot you are working on and all adjacent lots. You could be held liable for damaging sites on neighboring lots. VEHICDLAR TNATlIC CAN CAUSE SOIL COMPACTION, KORRlNGfor D^RAX"IatiOn °LbuiSIT" 4 Npermits. BX Evidence of traffic on drainfield sites may Damaged alternate sites must be replaced before a Certificate of occupancy will be issued. Date —Approved S �� Bylty o Orono