HomeMy WebLinkAbout1992-06-05 Septic System ApprovalTY OF ORONO Permit t
�.I SYSTEM APPROVAL Fee $
F ti ;'.-, .• Entered By of this this report and is
The General Contractor will be given a copy
DESIGN IS for its
distribution
AS APPROVED UNLESSnTHIS SHEETtISsATTASCHLDC SYSTEM
LOCATION:
PflONS:
GENERAL CONTRACTOR:
P—___._______
SEPTIC CONTRACTOR: HONE:
PHONE:i_.
OWNER: T 1i ��� --
APPROVED (Note Changes Below)
CONDITIONALLY APPROVED:
COMMENTS:
st
NOTICE
pproC aTO l ofl�theAinsp inspector (477 7357)$ to Call forpinsp ctiroved ons 24 hours lans and pinsadvance have prior
NOTICE TO GENERAL CONTRACTORS■ Primary and alternate drainfield sites MOST be protected
prior to and fter system installa:_on to avoid compaction of the natural1-
a
ion
ALL DRAINFIELD AREAS MOST BE PENCED Of? prior building
pourtfootingstwill and
notfencing
be granted
remain in place until final aite grading. Approval
until the Inspections Department has verified that primary and alternate sites ars
adequately protected.
so VEHICULAR TRAIlIC OF ANY MIND (cars, trucks, earth moving equipment, etc.) is allowed
within 20' of tested drainfield sites either before or after system construction. This
applies to the lot you are working on and all adjacent lots. You could be held liable for
damaging sites on neighboring lots.
VEHICDLAR TNATlIC CAN CAUSE SOIL COMPACTION, KORRlNGfor D^RAX"IatiOn °LbuiSIT" 4 Npermits.
BX
Evidence of traffic on drainfield sites may
Damaged alternate sites must be replaced before a Certificate of occupancy will be issued.
Date —Approved S �� Bylty o Orono