HomeMy WebLinkAbout1992-05-04 Septic System ApprovalOP ORONO
I� SYSTEii APPROVAL
T56,io
Permit t
Pee $
Entered By
The General Contractor will be given a Copy ,JOfthis report and i
responsible for its distribution to all sub -contractors. SEPTIC S
DESIGN IS NOT CONSIDERED AS APPROVED UNLESS IS SHEET IS ATTACHED
LOCATION:
PHONE:
GENERAL CONTRACTOR:
SEPTIC CONTRACTOR: PHOIT �
r I E }/ -
OWNER: �1-�✓l PHON�
C] APPROVED
CONDITIONALLY APPROVED: (Note Changes Below)
CUP94ENTS : d �`� kT l O'RYr'PmPn )s YP�] LA �' Gr c�-0 0-
approvaTO l of �theAInso ctor 0173 7357)• Call forto the pinspe tirovcd ns plans4 hoursoecsamust
uance have prior
NOTICE TO GENERAL CONTRACTORS: Primary and alternate drainfield sites MUST be protected
prior to and after system installation to avoid compaction of the natural soi..
ALL DRAINFIELD AREAS MOST BE FENCED OFF prior to building site excavation and fincing must
remain in place until final site grading. Approval to pour foo•.ings will not be granted
until the Inspections Department has verified that primary and alternatf: sites are
adequately protected.
No vEEICULAR TRAFFIC OF ANY RIND (cars, trucks, earth moving equipment, etc.) is allowed
within 20' of tested drainfield sites either before or after system construction. This
applies to the lot you are working on and all adjacent lots. you could be held liable for
damaging sites on neighboring lots.
VEHICULAR TRAFFIC CAN CAUSE SOIL COMPACTION, RENDERING DRAINFIELD SITES UNUSABLE.
Evidence of traffic on drainfield sites may be cause for revocation of building permits.
Damaged alternate sites must be replaced before a Certificate of Occupancy will be issued.
1 �
Date Approved
By City o£ Orono