Loading...
HomeMy WebLinkAbout1988 Percolation Test Data5-39 PERCOLATION TEST DATA SHEET Test hole location G /? L <� O R v Hole number % Date test hole was prepared Depth of hole bill,: u::1,- inahe3. Diameter of hole, �_ inches. Soil data from test hole: Depth, inches Soil texture ZO Method of scratching si'_euall SC/'h Depth of pea-sized gravel in bottom of hole, Date and hour of initial water filling Depth of initial water `illing, / ( inches above hole Method used to naintai, .:: least 12 inches of water depth in hole f.:r at le:.st 4 hours Pr l' I L L Pe:.olation test readi: -made by /./. (s---` on k star:: at Maximum t.•a:cr d. v,. (date) during test, � — inches. Time Percolatiun -- Ti=e Interval, surencnt, Drop in nater rate, I:: ares Minutes inches level, .1ches minutes I:ct Ir %ULA.. -- inch f_c. L L — !'e. l.ition rate % 8� 7�.. ` min,. !,. H-34 PERCOLATION TEST DATA SHEET Test hole location Hole number Date test hole was prepared Depth of hol-• tbottu:n,_Lc�_ 1nch.•s. Diameter of hole, & inches. Soil data from test hole: Depth, inches Soil texture 0-2. 1?.P Cl N v, -42 _/O Y.athod of scratching sidewall_ Depth of pea-sized gravel in bottom of hole, ;�_ inches. Date and hour of initial water filling Depth of initial water filling, 16 inches above hole bottom. Method used ,/- to maintain 1 at least 12 inches of water depth in hole- for at least 4 hours y 1- / L -- Percolation test readings gado by �; / :. _—.- _ on a.n. g$? starting at � � Max::.u-: :.;tut el:th at.uv:• hol. (date) during test, inches. Ti=t., Time Interval, Measurement, Minutes inches Per, -Plat . n Drop in water R rats - level, inches; I minutes ,•r II incl: _— z 671 i- 11a 1 -7/ Y r rcolati—I rat'. - 80 Rte'-'— PERCOLATION TEST DATA SHEET H-39 Test hole location r/�/: �•.'/' Mole :camber / — Date test hole was prepared / /'aI' }'- .r �i :ept.h of hole boLtum,_L& inches. Diameter of hole, 4 inches. Soil data from test hole: Depth, inches :;oil te:cturu Method of scratching sidewall Depth of pea -sired gravel in bOLLUC of hole, Date and hour of initial water filling / /- ? r• Depth of initial water filling, incheb abova h.-lr bott,r. ---L-- - 1 Method used to usintain at least. 12 inches of water .'apth in ho.a for ..t least 4 hours Percolation test readings made 1 �/p/j/ Cr/('0♦J . m. star -tin? at.2 ULIL a..iasum wu•rr de a.m' " p tt br•vc t.o. 1, ttam q3�, during test, _ �-�-- incl:s. I Time I Percolation Ti Int_. -1,1.easurem, .t, Drop in water rate, Miru, I inches level, inchrs minutes :ar it inch r a `.-�+