HomeMy WebLinkAbout1988 Percolation Test Data5-39
PERCOLATION TEST DATA SHEET
Test hole location G /? L <� O R v Hole number %
Date test hole was prepared Depth of hole bill,: u::1,- inahe3.
Diameter of hole, �_ inches.
Soil data from test hole:
Depth, inches Soil texture
ZO
Method of scratching si'_euall SC/'h
Depth of pea-sized gravel in bottom of hole,
Date and hour of initial water filling
Depth of initial water `illing, / ( inches above hole
Method used to naintai, .:: least 12 inches of water depth in hole f.:r at le:.st
4 hours Pr l' I L L
Pe:.olation test readi: -made by /./. (s---` on
k star:: at Maximum t.•a:cr d. v,.
(date)
during test, � — inches.
Time Percolatiun --
Ti=e Interval, surencnt, Drop in nater rate, I:: ares
Minutes inches level, .1ches minutes I:ct
Ir %ULA.. -- inch
f_c. L L —
!'e. l.ition rate % 8� 7�.. ` min,. !,.
H-34
PERCOLATION TEST DATA SHEET
Test hole location Hole number
Date test hole was prepared Depth of hol-• tbottu:n,_Lc�_ 1nch.•s.
Diameter of hole, & inches.
Soil data from test hole:
Depth, inches Soil texture
0-2. 1?.P Cl N v,
-42 _/O
Y.athod of scratching sidewall_
Depth of pea-sized gravel in bottom of hole, ;�_ inches.
Date and hour of initial water filling
Depth of initial water filling, 16 inches above hole bottom.
Method used ,/- to
maintain
1 at least 12 inches of water depth in hole- for at least
4 hours y 1- / L --
Percolation test readings gado by �; / :. _—.- _ on
a.n.
g$? starting at � � Max::.u-: :.;tut el:th at.uv:• hol.
(date)
during test, inches.
Ti=t.,
Time Interval, Measurement,
Minutes inches
Per, -Plat . n
Drop in water R rats -
level, inches; I minutes ,•r
II incl:
_—
z 671 i- 11a 1
-7/ Y
r
rcolati—I rat'. - 80
Rte'-'—
PERCOLATION TEST DATA SHEET
H-39
Test hole location r/�/: �•.'/' Mole :camber / —
Date test hole was prepared / /'aI' }'- .r �i :ept.h of hole boLtum,_L& inches.
Diameter of hole, 4 inches.
Soil data from test hole:
Depth, inches :;oil te:cturu
Method of scratching sidewall
Depth of pea -sired gravel in bOLLUC of hole,
Date and hour of initial water filling / /- ? r•
Depth of initial water filling, incheb abova h.-lr bott,r.
---L-- -
1 Method used to usintain at least. 12 inches of water .'apth in ho.a for ..t least
4 hours
Percolation test readings made 1 �/p/j/ Cr/('0♦J . m.
star -tin? at.2 ULIL a..iasum wu•rr de a.m' " p
tt br•vc t.o. 1, ttam
q3�,
during test, _ �-�-- incl:s.
I
Time I Percolation
Ti Int_. -1,1.easurem, .t, Drop in water rate,
Miru, I inches level, inchrs minutes :ar
it inch
r a `.-�+