Loading...
HomeMy WebLinkAbout10-30-2003 Council Work SessionCouncil Woric Session 5:30 p.m., Thursday, October 30,2003 Orono City Council Chambers AGENDA I. Landform Development Proposal 2. Sur&ce Water Management Plan-Additional Costs 3.2004 Compensation Adjustments 4.1nitiate City Administrator Annual Performance Review 5. Other V ^ -V, mmmI- -t' *. - . TO: FROM: Mayor Peterson and Council Members Ron Moorse, City Administrator ^ DATE:October 27,2003 SUBJECT: Landform Commercial Development Proposal for Willow and Highway 12 Description of Proposal Landform has requested an opportunity to present a development proposal to the Council for the property at Willow and 12. The development proposal is attached. The proposal includes three commercial buildings on the outlot at the comer of Willow and 12, with a total of 29,560 square feet. The buildings include a 14,560 sq. ft. pharmacy, a 2-story bank building with a total of 5,400 sq. ft., and a 9,600 sq. ft. retail building. Kev Issues For Discussion There are a number of key issues to be discussed regarding the proposal. These include the proposal ’s compliance with the City ’s Comprehensive Plan, the compatibility of the proposal with the overall development plan for the Highway 12 commercial area, and the traffic impact of the proposal on Willow Drive and the Willow/12 intersection. Compliance with Comprehensive Plan The City ’s Comprehensive Plan guides this property for office use, and allows retail uses accessory to the office use. The 24,160 squai e feet of retail space is far beyond retail accessory to office. The scale of the proposed development is much more consistent with a neighborhood retail center. The scale of the proposed retail development requires an amendment to the Comprehensive Plan. Compatibility with the Development Plan for the Highway 12 Commercial Area. One question to be addressed is whether the proposed location is the best site for this level of retail use, and particularly the pharmacy, in terms of the long term development plan for the Highway 12 commercial area. Three legs of the Willow/12 intersection are currently developed for retail uses. It would generally follow that the fourth leg would also be retail, unless there is a specific plan or reason to do something different. Orono ’s Comprehensive Plan has guided this leg of the intersection for office use due to two factors. First, to direct strong retail anchors to the areas in which they will have the greatest impact in terms of facilitating retail development and strengthening the retail market. Second, to manage the level of traffic on Willow Drive, and at the Willow/12 intersection. Since the City ’s development plan does not encourage retail development on the NW quadrant of Willow and 12, locating a pharmacy at this location does not take the best advantage of this retail anchor. However, there are two factors that, to some extent, offset this disadvantage. First, a pharmacy building, with the corporate-required design and parking layout, does not meet the current •AiBaiai design guidelines of the Lx>ng Lake Downtown Master Plan. AH of the other intersection options for a pharmacy use are located in Long Lake. Second, a pharmacy use located anywhere along the Highway 12 commercial area will provide the benefit of drawing traffic fiom the new Highway 12 corridor into the Highway 12 commercial area. It is not clear at this point in time what impact new Highway 12 will have on the retail uses in the Highway 12 commercial area, whether the retail market will be strong enough to enable the types of development and redevelopment anticipated in the Long Lake Downtown Master Plan, what role a pharmacy use might play in that process, or whether creating a neighborhood retail center at Willow and 12 will help or hinder the implementation of the Downtown Master Plan. Traffic Impacts The uses for which the property at Willow and 12 is guided reflect the City's desire to avoid drawing substantial traffic to Willow Drive, and to avoid creating a congested intersection at Willow Drive and 12. As part of the decision process regarding the Landform proposal, it is important that a traffic study is conducted to deteimine the impact of the prq|x»ed development on trahic levels on Willow Drive and at the WiIlow/I2 inteisection. is*' ■r‘ y 5 i OUTLOT A ----------------------------------------------------J . ) i ■ 1. ' -• -- 4 ^ JT> ------ . ^ *=S=. fCT I (i Kelley Parkway CSD 10,300 sf Office Baildmg" 4 mm <r^ r % 14,560 sf Pharmacy 1 H i g h w lift: t^[«f PROPOSED OFRCE/BANK BfVAnON :^<-'-.x t ■'■ .-‘r •'?•^1. '-;4.,i 1 :^fmiiiiif>w»Bii«i*' ^*f}i A'S»£!!i!.?JI!SS&IS^^ mm:lis;iiii PK •II '•!Bi MttI SSA7SAV*'' im‘lltttIBllMBWIlIlt|lti^<»g ^•ll«BllttlBMaOTinilllB>N^ ^fi|IIMMraill|lli|IIBir> «>B1M5mBIWft|ll 111 111 nifriii»»<«iiirBiiit ^ ilWitpiMrBIHflUltl.BU. BWiintBifKfiiiiiiiiii 'WMmtcviii liiif I ifiiiiiiittiitiiiiiff ilfillllfVlllfV’ IHU lllltlllll' II = Bse lIu mmmm S» 1= E <ii|ii(iiiii:iuiiBipif III. ''•IIIIIBIIIIIIIIIKIIIII^ - Hill |llil■llll■Ilill f=^iSE aifiimi bii>s:«S555«5otiv«i»:^.Biiif iiiii iiit^casssSSSSS irilllVIllflBlllfillllltlllllTKS^VMiMi D■llllll>llf«ltlllilll;•lltfl■l^^7■S55 ll lllll Btlliillllf ■lllflBlltAVU^^^OSS c «iiiBiiiriiHfiifiacBiiii iflimitiWfmiiicBi^ I iiiif ■iitOT(iiaiiitf;iii? '^liiiiimeiBiiifiBiiiiiiii «lllHBI1lfIBlllflBlllf:i ^^hShhh>B8S t-:588S882. E-; I>-Z-2| lOpnam figpirp PI FWATiQW ■ s- L-'i - • TO: Mayor Peterson and Council Members FROM: Ron Moorse, City Administrator DATE: October 27,2003 f SUBJECT: Bonestroo Associates Request for Additional Budget for Completion of Surface Water Management Plan In the mid 1 990*s the City contracted with Bonestroo Associates, the City ’s engineering consultant, to develop a Surface Water Management Plan (SWMP) at a cost of $108,000. The process and timeline for the development of the plan were extended significantly as Bonestroo experienced stafBng changes, and as the rules and conditions under which the SWMP uas being developed were changed. This resulted in a flnal product that is substantially beyond what was initially envisioned, but also doubled the costs. Bonestroo has requested these additional costs be divided between the City and Bonestroo. Two letters fix>m Bonestroo regarding the additional costs are attached. Representatives of Bonestroo will attend the worksession to review the cost infoimation. I i__ 1/1 Bonestroo Rosene Anderlik& Associates Engineers & Architects I. Im. U sn Affifmntiv* Acllon/Cqu«i Opporlunity fmploytr■oncstroo. Rotene. Anderlik snd Asioci 4nd Employee Owned Principelt: Otlo O Boncviroo Pt • M.rrvm L iorv«»f.i, PI • Gifon R Cook. Pt • O Schunithf, P| • icrry A UourUon. Pt • M.tfk A H.unun. P£ Senior Consullunti: Robert W Roiene. Pfc • Joseph C Andcriik. P£ • Richard E. Tufnrr. PE • Swtan M Eberim C PA Atiociaie Principeli: Kcilh A Gordon. PE • Robert R Pfefferk* PE • Richard W Foster PE • David O Losfcota. PE • Michael T Rautmann PE • fed K Field. PE • Kenneth P Anderson. PE • Ma'k R Rods PE • David A Bonestroo. MB A • Sidney P Willi.irhson. P£ . LS • Aijnes M Ring MU A • AD.wi Rick Schmdi. PE • Thomas W Pete'son. PE • J.irresR Mai.ind PE • Miles B Jensen. PE • I Phillip Gravel lU. PE • Dai Mel J tdgerton. PE • Ismael Martme/. PE • Thomas A Syfko PE • Sheldon j Johnson • Dare A Grove. PE • Thomas A Roushar. PE • Robert i Devety. PE Officei: St Paul St Cloud. Rochester arsd Wilimar. MN • Miiw.iukee. Wl • Chic^sgo. It M^biile; wwwDorsestroocom May 21, 2003 Mr. Ron Moorse, Administrator Gty ofOrono 2750 Kelley Parkway, PO Box 66 Crystal Bay, MN 55323-0066 Re: Additional Budget for the Orono Surface Water Management Plan Bonestroo Project # 198-98-063 Dear Ron: This letter is in follow-up to our meeting of March 12, 2003. At that meeting, we discussed Bonestroo's request for additional budget/reimbursement for the Orono Surface Water Management Plan (SWMP). At that time, it was determined that there were two primary groupings of tasks that accounted for the additional costs associated with completing the SWMP. They are 1) determining the stormwater utility and trunk/area fee schedules, and 2) transforming the SWMP from an engineering document to an Implementable planning tool. Below are estimates for the value or cost of these tasks with a listing of the primary sub-tasks. 1. Fee Determination.$14,400 $25,6002. SWMP Transformation ....... > Redevelopment Issues > Basis For Financing/Fee Determination > Wetlands Section (other than inventory/assessment) > Implementation S^tion > Changes to Technical Section > General, across the document Ron, In the time since that meeting, we have been able to identify a few tasks that should be counted as notable contributors to cost of the SWMP. These are in addition to the issues cited in our letter to you dated September 19, 2002 $15,2003. Additional Tasks............... > Highway 12 Coordination > MCWO Rule Changes (not related to approval process) > Ravine Stabilization Needs > Mapping 4. Total.$55,200 2335 West Highway 36 • St. Paul, MN 5SII3 • 651-636-4600 • Fax: 65I-636-I3II f These numbers are based on estimate s of hours needed to complete the tasks. We took a conservative approach (to Orono's benefit) to estimating the hours, and did so after discussion with the individuals involved at the time. In most cases, the work was intertwined with other aspects of the project and therefore difficult to determine an exact amount. Attached is a description of the tasks performed that did not fail under the original scope. Along with the tasks/description provided in our letter of September 2002 (attached), this letter represents the basis for our request for additional budget for completion of the SWMP. Please call if you have any ns or concerns. Respectfully submitted. ROSENE, ANDERUK & ASSOCIATES, INCBOI^STROO, ROSENE, ANDERUK Andrew M. Budelis, CPESC Project Scientist Attachments cc: Mike Gaffron, Orono Tom Kellogg, Bonest File 139-98-063 t < f ^•1111^ 11 it - Additional Budget LL-t af AiMm«inal Ta«k« Migb)»9yJl^UDfkitPiCQQQUi»!tjQn • The 1997 draft SWMP was based on pre*TH 12 conditions • TH 12 predicated changes in watershed configuration and discharge rates • Next draft SWMP nKxlified to reflect new ponding requirements, mapping, etc • In 1996, MCWD adopted Rule B, wh;ch included Stormwater Management and ESC • In 1998, MCWD adopted Rule N, which separated and updated both issues • Both instances mandated review of the SWMP and some changes to models, and caused a ripple effect to appendices, text, and mapping Rayjnft staWlUfltiPP-Neefe. • While locating pipes for conveyance of runoff, degraded or susceptible ravines were identified aty initiated effort to inventory and prioritize all such ravines for the CIP • As a result of the tasks/issues described above • Also see the tasks/issues described in the September 2002 letter I Stomwater/Afea Charge Determination • Evolved from a single City-wide fee (original scope) to a watershed based fee • Expansion of watershed fee to consider MUSA and Non-MUSA areas • Final fee was calculated using QP indicator projects Stormwater Utility • Research, compilation of information, and determination done coincidental to SWMP development • Performed gradually as compared to a separate study SWdP.IiaritQnnftfjRn Redevelopment Issues • Qty identified a need to address stormwater Impacts associated with expansion and new construction • Led to the preparation of flow charts, guidelines, fee curves, and tables • Addressed water quality requirements and/or cash contributions in lieu of improvements W^nds Section • Integrate a wetland section into the SWMP, including wetland inventory, mapping, restoration, and management Imf^ementation Section • Expanded %o be more comprehensive • Required a series of meetings to reflect the goals and objectives of the Council and SWMP task force Technical Section • Expanded to provide guidelines for new developments including Bioretenbon and Biofiltration • Curves and tables were prepared speciftcally for Orono's conditions. General/ Document • Format and content of the document changed for readability and logic as a planning tool • Modified after original draft approved by staff in 1997 # September 19, 2002 Mr. Ron Moorse, Administrator Oty of Orono 2750 Kelley Parkway, PO Box 66 Crystal Bay, MN 55323-0066 Re: Additional Budget for the Orono Surface Water Management Plan Bonestroo Project # 198-98*063 Dear Ron: As you are aware, the development of Orono's Surface Water Management Plan (SWMP) has exceeded the original time and budget In this letter we have prepared a description of additional services associated with runoff management planning in Orono, as well as the amount of additional costs associated with the SWMP. Also, Mike Gaffron and 1 have recently completed work to resolve issues for final approval from Minnehaha Creek Watershed District (MCWD). From the submittal of the review draft to MCWD (May 2001) to the present, we have included hours spent on this project under the "general” billing number, with detailed descriptions. Descriotion of Additional Services Because this SWMP has evolved over a six-year period, it has effectively had two lives. The first was the draft approved by staff in 1997. Subsequent edits, updates, and changes to the SWMP have resulted in a better, more implementation-oriented runoff management tool. It now has detailed schedules, priorities, cost estimates, and strategies to approach a variety of surface water issues. This means that Orono will realize immediate, tangible benefits from its investment in runoff management. Some of these additional services have already been put to work, while others will happen as the SWMP is implemented. Following is a brief d^ription of changes and updates to the SWMP since the 1997 draft. ♦ GIS Maps and Databases The originally approved GIS for system mapping was a UNIX-based system. Over the life of the project, GIS has evolved into a PC-based sy^em. In order to be compatible with Orono's PC-based system and to be able to keep up with current GIS technology, the entire data set for producing maps and associated information was converted. ♦ Work Flow Interruption There have been periods of time that work on the SWMP stopped. The lengths of time, source, and reasons for interruption have varied. When the project resumed after an extended period of time, "getting back up to speed ” resulted in additional hours. Consequently, some parts of the SWMP had to be revised to reflect new information. ♦ Trunk Fee/Stormwater Utility The research, compilation of information, and rate determination for the "trunk fee” and the "stormwater utility” were done coincidental to SWMP development The method used to determine i • trunk fee rates was also devised as part of these tasks. The hours spent on these was charged to the SWMP, which was then updated, as these issues were resolved. ♦ Changes In Scope The originally approved scope was designed to meet the standards and requirements (at that time) of reviewing agencies, notably MCWD. These standards and requirements have evolved over the course of the project. For example, there is considerably more emphasis on the use of infiltration as an on-site runoff management tool today than there was in 1996. Also, as the SWMP took shape, both Qty and Bor>estroo staff saw ways to improve it to reflect the goals and objectives of the Council and residents of Orono. As a result, there have been several minor alterations to the scope, which, when incurred individually, seemed to pose an insignificant impact to the budg^. When the changes are looked at collectively, the impad to the budget was notable. Some examples of this are: minor format/content changes as well as those described below v' development of water quality treatment flowcharts determination of CIP project priorities ♦ Additional Meetings We have participated in several additional meetings with staff. Council, and MCWD to review and discuss SWMP content and develop short-term strategies for moving forward. In particular, along with City staff, we have spent time coordinating with MCWD staff to review comments and discuss resolutions. Often, as suggested earlier, this coordination would lead to additional or modified requests to be addressed in order to obtain approval. Also because of the length of the SWMP process, there has been the need to familiaiire new Council and Commission members with the content and objectives of the SWMP. ♦ Format and Content of the SWMP Revisions, deletions, additions, and modifications to the format and content have been ongoing throughout the second life of the project due to the issues discussed above. Along with many minor editing changes, these majw editorial/fbrmat changes to improve readability, flow, and appearance have created a document that is a notable improvement over the 1997 draft: ✓ ✓ ✓ ✓ ✓ ✓ assimilation of the Executive Summary into the Introduction reformatting and rewriting the Technical Background section development of the current comprehensive Implementation Section expansion of discussion of water quality treatment and wetland management style/format of font, tables, paragraphs, footers, figures, and page setup reconfiguring subject headings and numbering Transitions In addition to the SWMP improvements, Bonestroo has changed key personnel over the life of the project. At tfiese transitions, time and effort needed for the new person to "ramp up” their familiarity and proficiency to move the SWMP forward. The final transition was to put me in as project manager, which began the SWMP's second life. Since then the SWMP has deveioped, through much coordination with and effort by Mike Gaffron and others at the City, into the current document. Budget Status To date, invoices for 90% complete (of the original budget) have been submitted and paid by the City. Another invoice, originally submitted July 1997, for an additional 5% ($5,410) has not been paid, and is enclosed. Also at this time, we are submitting an invoice for the remaining 5% of the original budget. Payment of these two invoices would complete remittance of the contracted budget amount of $108,000. The total amount charged [for the SWMP] to Bonestroo project number 139-98-063 is $201,600. The original contracted budget amount was $106,000. Some of the factors contributing to this difference have been beyond City or Bonestroo control. On the other hand, some can be directly attributable to decisions, requests, and actions by the three primary parties involved - Bonestroo, the City, and the MCWD. We feel that because we are responsible for a portion of the additional hours spent on the Plan, we should accept responsibility for a portion of the excess budget. The difference between the contracted amount and the costs for additional services is $93,400. This represents our efforts up to subnritting the draft SWMP to MCWD and the Met Council (May 2001). Again, work done since then, as part of the review and approval process has been charged to the general billing number. Considering ail factors, including those under our control, and our desire to provide the City with an date, high qualiiy Surface Water Management Plan, we feel that a divi^ of the additional costs [be twee n Orono and Bone stroo] is a reasonable approach. Therefore, we request your review of this matter and a meeting in the near future to work out a solution. Thank you in advance for your consideration. Respectfully submitted, BONESTROO, ROSENE, ANDERUK & ASSOCIATES, INC. Andrew M. Budelis Project Scientist Enclosures cc: Mike Gaffron, aty of Orono Gregg Gappa, Ofy of Orono Glenn CO^ Principal - Bonestroo Tom Kellogg, Borrestroo Ismael Martinez, Bonestroo File 139-98-063 ------ TO: FROM: Mayor Peterson and Council Members Ron Moorse, City Administrator DATE:October 28,2003 SUBJECT: 2004 CompcnsatioB Adimttttf ats Compensation Adjustment Criteria An outline of the criteria on which pay and insurance adjustments are generally based is as follows: A.Pay Adjustment Criteria I. Cost of living increase a.U.S. Consumer Price Index: annualized increase from September, 2002 to September, 2003 is 2.3%. b.Minneapolis/St. Paul Consumer Price Index: annualized increase from the first half of 2002 to the first half of 2003 (July 2002 to July 2003) is 1.3%. The increase for the first six months of 2003 was .9%. This increase annualized over 12 months would be 1.8%. 2.Market comparison. a. Cities in the metro area are providing pay adjustments of 1.75% to 3.25%. Cafeteria Benefit Plan Contribution Adjustment The insurance premiums for 2003 will inc.’- rase by 13.6%. Although this increase is significantly larger than we had hoped, it is also significantly lower than the increases most other organizations are experiencing. The magnitude of the premium increase was reduced by increasing the office co ­ pay from $15.00 to $30.(X). The monthly family coverage premium increases for the three Medica options are as follows: MedicaHigh: $117.96 Medica Elect: $ 108.21 MIC 1000: $149.77 The MIC 1000 plan is a high deductible plan that has had a 20% office visit co-pay. The premium increase for the MIC 1000 plan could not be reduced by the increased office visit co-pay, because the co-pay did not change in the MIC 1000 plan. Recommendation For 2004, it is recommended that the compensation adjustment be focused on pay rather than on the cafeteria benefit plan contribution, and that pay levels be increased by 3%. and the cafeteria benefit plan contribution remain at the 2003 level of $500.00 per month.I •5, V‘ A L NOTICE OF PUBLIC MEETING ^'o**®* *s hereby given that the Orono City Council will meet in a worit session at 5:30 p.m. on Thursday. October 30,2003, in the <>ono City Council Chambers, 2780 KeUey Parkway. Orono, Mumesota. The purpose of the meeting is to review a commercial development proposal for the northwest comer of Willow Dnve and Highway 12, review a request regarding additional costs for development of the City’s Surface VV'ater Management Plan, review proposed compensation adjustments for 2004, initiate the City Administrator performance review process, and other issues of current interest This meeting is open to the public. ( Lin Vee, City Qerk