HomeMy WebLinkAbout05-06-2003 Council Work SessionCouncil Worksession
5:35 p,m. Tuesday, May 6,2003
Orono City Council Chambers
AGENDA
1. Structuring of the Bond Issue for the Navarre Fire Station
2. Assessor Update Regarding Property Reviews for the
Reconvened Board of Review Hearing
15 minutes
30 minutes
I
3. Discussion of "Open Book" meeting as option to Local
Board of Review Hearing
15 minutes
JIf ^
V.
TO:
FROM:
DATE:
Mayor Peterson and Council Members
Ron Moorse, City Administrator
April 30,2003
SUBJECT: Structuring of Navarre Fire Station Bond Issue
At the May 2 woric session, Carolyn Drude, die City ’s Bond Consultant, provided three options for
structuring the Navarre Fire Station Bond Issue. The Council determined a structure that would
allow some flexibility regarding tax levies in the future would be preferable because of the
uncertainty regarding State legislative impacts on local levies, and because the City has upcoming
needs that will require additional expenditures. The Council directed the City Administrator to
provide information regarding upcoming needs and expenditure increases, and regarding additional
options for structuring the bonds that would most cost-effectively provide the levy and expenditure
flexibility the City will need.
Future Expenditures
The attached materials provide information regarding future expenditure needs. In the near future,
there will be a need for increased expenditures for both capital and operating needs. These needs
include the replacement of equipment in the Police, Fire and Public Works areas, increased
expenditures for street rehabilitation, and increased staffing needs, particularly in the Police
Department.
Bond Structure
Tom Kuehn, Carolyn Drude, and I will meet prior to the work session to review the bond structure
options, as well as the City ’s current bond schedules, to determine how best to provide some
expenditure flexibility while limiting interest costs.
■JLm
I?-"’
-:v ,
TO:
FROM:
Mayor Peterson and Council Members
Ron Moorse, City Administrator
DATE:May 5,2003
SUBJECT: Future Expenditure Needs
1. Long Lake Fire Department Equipment Replacement
— 2005: Self-Contained Breathing Apparatus(SCBA)-$90,000
— 2007: Tanker Truck-$135,000
— 2011: Light Rescue-$55.000
— 2013: Pumper-$600,000
— 2016: Utility Truck-$80,000
2. Public Works Equipment Replacement
— Current transfer(levy) for equipment replacement is insufficient for future
needs Current transfer is $65,000/yr. The transfer amount needs to be
increased to $100,000/yr. (Please see the attached Capital Spending Plan for
the Public Services Department)
3. Police Equipment Replacement/Upgrades
A. The Police will need to replace/upgrade the computer terminals in their
squad cars in the next 2-3 years. This wit! cost approximately $70,000.
B. The Police Department needs to replace or upgrade its Police Records
System. This is planned to cost approximately $90,000, to be financed over
the next six years.
4. Staff Needs
— The PD needs another Investigator.
— When the Dahlstrom and Willow View developments are built-out (3-5 years), we
will have added approximately 500 new residents. This Is a 7% increase. This
will require the addition of at least one Police Officer.
— We have discussed the need for an Assistant City Administrator.
5. Street Rehabilitation
— The level of expenditures for street rehabilitation will need to increase
substantially due to the need to move beyond simple overlays to a mill and
overlay or to full reconstruction. This could double the cost of rehabilitating a
mile of street. We are currently levying $130,000 per year for street overlays.
If the cost of street rehabilitation doubles, we will only be able to improve one-
half of the number of miles of streets we improve today.
t
■,i
I
2004
2004
Total
2004
Replace 1992 John Deere Model 2355
Roadside Mower/Sweeper
Replace Public Works1982, #710 4 Wheel
Drive 3/4 Ton Pickup
50,000
35,000
50,000
35,000
125,1 95,000
2005
2005
2005
Total
2005
2006
2006
Replace 1992, #424 Dump/Plow Truck 100,000 105,000
Lift Station Rehabilitation 95,000 95,000
Paint Navarre Water Tower 250,000
105,(95,000 250,(
Replace 1979 Tractor Backhoe Loader 80,000 90,000
Replace Building Inspection1996 4 Wheel
Drive 3/4 Ton Pickup
35,000 35,000
• 1
% i
2006
Total
2006
Lift Station Rehabilitation 95,000 95,000
125,(95,(
2007
2007
Replace 1994 Case Loader 110,000 130,000
Lift Station Rehabilitation 100,000 100,000
Total
2007
2008
130,000 100,000
Replace 1996, #426 Dump/Plow Truck 110,000 110,000
2007 Lift Station Rehabilitation 100,000 100,000
Total
2008
110,(100,(
^ - ■*-- ■ --------------------------------—
TO: ' Mayor Peterson and Council Me*nbers
FROM: Ron Moorse, City Administrator
DATE: May 5.2003
SUBJECT: Assessor Update and **Opcn Book** Meeting Option
Property Review update
The Assessor is completing property reviews today, and will have a better idea as to on wUch
properties there continue to be significant valuation issues. The Assessor will provide this information
at the work session.
**Open Book** Meeting Option
The Open Book meeting option is an option available to Cities in vi^ch the County Assessor provides
property valt ;'tion services. These cities can choose to transfer the Local Board of Review powers to
the County Board. Rather than having a Local Board of Review hearing, the County Assessor would
hold an “open book" meeting, at which the local property owners would have an oppor tunity to
question the valuation placed on the property. This is an informal process with the Assessing staff,
rather than a formal process with the City Council acting as the Local Board of R lew. The formal
appeal of the Assessor ’s valuation would be to the County Board, rather than to i i local Board of
Review.