Loading...
HomeMy WebLinkAbout1991 - Homeowner Sewer AgreementAGRBBNBMT Parti€8, This is an agreement by and between Todd Ziesmer and Marie Ziesmer, husband and wife, (hereinafter "the Owners") and the City of Orono, Minnesota, a Minnesota Municipal Corporation, (hereinafter "the City"). Recitals. A. The Owners own property in Hennepin County, Minnesota legally described in Exhibit A, attached (hereinafter "the Property"). B. This agreement is to amend the November 6, 1989 Holding Tank Agreement whi.;h the Owners signed on December 4, 1989, hereto attached as Exhibit B. This amendment is for the purpose of allowing the Owners to construct a trench-type drainfield as a temporary supplement to the holding tank sewage system currently in use. C. This approval is not transferrable to a new owner. 3.Agreement of the Parties. The City and the Owners in mutual consideration hereby agree as follows: A. The City agrees to extend until July 1, 1992 the Temporary Certificate of Occupancy previously granted on March 1, 1989 and extended to September 1, 1990. That Temporary Certificate will note the completion of the septic system as a requirement for issuance of a Pinal Certificate of Occupancy. B. If no City Council decision has been made by July 1, 1992 regarding installation of municipal sewer, the Owners agree to: 1) complete the mound drainfield system within 60 days of that date, or 2) appear before the City Council to request an extension of this holding tank/temporary drainfield agreement and the Temporary Certificate of Occupancy. C. The City agrees to allow the Owners, at the Owners* expense, to have a licensed septic system contractor install a minimum site trench drainfield in the front yard, as a supplement to the holding tank system. The intent of such a drainfield system would be to treat some portion of the sewage load on site, to minimize the need for regular holding tank pumpouts. Such a system, if installed, shall include an overflow holding tank, 1000 gallons minimum capacity. The intent is that whatever portion of the sewage load cannot be treated by the drainfield system will overflow to the holding tank for pumpout as necessary, thereby greatly reducing the potential for surface discharge of sewage. This drainfield/holding tank system shall be install^ by a licensed septic system contractor, who shall be responsible for obtaining the necessary permits. The minimum standards and requirements for design and construction of the drainfield shall be determined by City staff in conjunction with the Owners. Page 1 of 4 n E. The City agrees to allow the installation of this system on a temporary basis o-.ly, because soil testing has indicated that soils in the front yard are not suitable for permanent use of a trench type drainfield. P. The Owners agree to abandon the temporary drain- field system and construct the previously approved mound system within 90 days of any of the following events 2 i. A final determination by the City Council that the property will not be served by City sewerr ii. Any incident of surface discharge of sewage; iii. Sale of the residence. G. The Owners agree to maintain the holding tank/temporary drainfield system so that it does not become a health or safety hazard or a public nusiance. H. The Owners agree to continue to maintain a current contract for regular pumpout, until such time that the holding tank system is abandoned. I. The Owners agree to connect the residence to the municipal sewer in the standard 16 month time period allowed for such connection, should City sewer become available. J. The Owners agree to cooperate with the City in having this agreement recorded and further agree that the agreement shall run with the property and will be binding upon all purchasers, successors, or assigns. 4. Miscellaneous. This agreement contains the entire agreement between the parties pertaining to the subject matter herein and it shall be modified only by written agreement signed by the parties. This agreement shall be governed and enforced under applicable City Ordinances and the laws of the State or Minnesota. Page 2 of 4 1 • J • I i m 1 STATE OP MINNESOTA ) )sa. CODNTY OP HENNEPIN ) Tha foregoing Inatrunent waa acknowledged before me on thia //^ day of 19 °n . by Barbara Ae P«terson ft Dorothy Me Rallln# Mayor ft City Clark of the City of Orono, a Minnesota municipal corporation and said instrument was executed on behalf of the City. L/XD4 S. VEE notary public - mm____HENNEPIN COUNTY _ My cowwUNOH B»lMi t. I Mot«]^ Public This instrument was drafted byi The City of Orono 1335 South Brown Road P.O. Box 66 Crystal Bays MM 55323 (612) 473-7357 Page 4 of 4