Loading...
HomeMy WebLinkAbout1988-12-22 Septic System ApprovalCITY OP ORONO SEPTIC SYSTEM APPROVAL Permit # Pee $ Entered By The General Contractor will be given a copy of this report and is responsible for its distribution to all sub-contractors. Septic system design is not considered as approved unless this sheet is attached. LOCATION: 3 2-00 GENERAL CONTRACTOR; SEPTIC CONTRACTOR:PHONE: OWNER; □ approved ^(^CONDITIONALLY APPROVED;Note Changes Below COMMENTS: —e.(g t-gr-A.s7~ S~0 * b^e=%’L,______________________ ^ ^ Uou-gff^ /dOO .srC. iJvW OcOT^ Tbe^/6»M^ A30 -*rO- J <<»** <COd^ -TTC^Of 2>i?p*rT4- irv^x /2>" , ^ rr^ .________ ^ 0\AT PfLL^ auti. TSaAJkL^ I ( NOTICE TO INSTALLERS: Any changes to the approved plan and specs must have prior approval of the Inspector (473-7357). Call for inspections 24 hours in advance. NOTICE TO GENERAL CONTRACTORS; Drainfield sites must be protected prior to and after system installation to avoid compaction of the natural soil. Drainfield areas must be fenced off to eliminate all traffic over them. /2- 'Z2-'^2. Date Approved