HomeMy WebLinkAbout1988-12-22 Septic System ApprovalCITY OP ORONO
SEPTIC SYSTEM APPROVAL
Permit #
Pee $
Entered By
The General Contractor will be given a copy of this report and is
responsible for its distribution to all sub-contractors. Septic system
design is not considered as approved unless this sheet is attached.
LOCATION: 3 2-00
GENERAL CONTRACTOR;
SEPTIC CONTRACTOR:PHONE:
OWNER;
□ approved
^(^CONDITIONALLY APPROVED;Note Changes Below
COMMENTS:
—e.(g t-gr-A.s7~ S~0 * b^e=%’L,______________________
^ ^ Uou-gff^ /dOO .srC.
iJvW OcOT^ Tbe^/6»M^ A30
-*rO- J <<»** <COd^ -TTC^Of
2>i?p*rT4- irv^x /2>" , ^ rr^ .________
^ 0\AT PfLL^ auti. TSaAJkL^ I (
NOTICE TO INSTALLERS: Any changes to the approved plan and specs must have
prior approval of the Inspector (473-7357). Call for inspections 24 hours
in advance.
NOTICE TO GENERAL CONTRACTORS; Drainfield sites must be protected prior to
and after system installation to avoid compaction of the natural soil.
Drainfield areas must be fenced off to eliminate all traffic over them.
/2- 'Z2-'^2.
Date Approved