Loading...
HomeMy WebLinkAbout09-23-2002 Tennis Court Plan Pg 2Notes 1 Lot6if 0 Lot 5 boundary trom Survay daM 5-3-01 by Coffin and Gronberg i 2 Lot 5 irtfonnation for topograpby and tafUlc Bias from ! C4y of Oono records 3 Cut and FiH Calculations Lot 6 Topsoil cut ' Soft subso4s cut 4 Stiff clay subsoils cut Topsof «i ! Staff clay M eoccy 120 cy 140 cy 100 cy 140 cy Total Earti Moving on Lot 6 1040 cy Lots Tofwoil AN from Lot 6 500 cy Total eanb moving on Lot 6 500 cy Earth material leaving site 120 cy Remove Boxelders. Buckiftom and misceltaneous brusli material from dashed areas, regrade to uniform surface, restore with turfgrass Cross-hatch area. 20.640 sf. — . _ indicates limits of 500 cy topsoil fill material on Lot 5 j from Lot 6. average depth 6" - ^ Front building setbacks Secondary Septic Site - - - Existing Septic Mound Proposed 775 sf eretland buffer mitigation area 26’ City of Orono setback from delineated wetland 35’ Minr Remove Boxelders. Buckthorn and miscellaneous brush material from dashed areas, regrade to uniform surface, restore with turfgrass 80 sf encroachment on 35' wetland buffer Wetland edge by John Anderson. 2001 105 sf encroachment on 35'viiotland buffer Proposed Tennis Court 3 Creek Watershed Disthct setback from delineated wetland 75'City of Orono septic system setback from delineated wetland 113sf encroachment on 35' \wetland buffer Sheet 2 of 3 Tennis Court Project Future swimming pool Future pool house Devries Residence 2180 AtXnodon Way. Orono. Mn 55356 W931S1I