HomeMy WebLinkAbout09-23-2002 Tennis Court Plan Pg 2Notes
1 Lot6if 0 Lot 5 boundary trom Survay
daM 5-3-01 by Coffin and Gronberg i
2 Lot 5 irtfonnation for topograpby and tafUlc Bias from !
C4y of Oono records
3 Cut and FiH Calculations
Lot 6 Topsoil cut
' Soft subso4s cut
4 Stiff clay subsoils cut
Topsof «i
! Staff clay M
eoccy
120 cy
140 cy
100 cy
140 cy
Total Earti Moving on Lot 6 1040 cy
Lots Tofwoil AN from Lot 6 500 cy
Total eanb moving on Lot 6 500 cy
Earth material leaving site 120 cy
Remove Boxelders. Buckiftom and misceltaneous
brusli material from dashed areas, regrade to uniform
surface, restore with turfgrass
Cross-hatch area. 20.640 sf. — . _
indicates limits of 500 cy
topsoil fill material on Lot 5 j
from Lot 6. average depth 6" - ^
Front building setbacks
Secondary Septic Site - - -
Existing Septic Mound
Proposed 775 sf eretland
buffer mitigation area
26’ City of Orono setback
from delineated wetland
35’ Minr
Remove Boxelders.
Buckthorn and
miscellaneous brush
material from dashed
areas, regrade to uniform
surface, restore with
turfgrass
80 sf encroachment on
35' wetland buffer
Wetland edge
by John
Anderson. 2001
105 sf
encroachment on
35'viiotland buffer
Proposed
Tennis Court
3 Creek Watershed
Disthct setback from delineated wetland
75'City of Orono septic
system setback from
delineated wetland
113sf
encroachment
on 35' \wetland
buffer
Sheet 2 of 3
Tennis Court Project
Future swimming pool
Future pool house
Devries Residence
2180 AtXnodon Way. Orono. Mn 55356
W931S1I