Loading...
HomeMy WebLinkAboutMound Design Procedure E-19E-19 MOUTJD DESIGN PROCEDURE (For Flows up to 1200 gpd) A. Sewage Flow Rate See D-7 or 1-3, A, or 5, or use metered value; Flow Rate = <^0 0 gpd B. Septic Tank Liquid Volume (see C-3 or C-5) /£fao gallons C. Soil Characteristics 1. Depth to restricting layer such as seasonally saturated soil, bedrock, coarse soil, etc. ; 7^ inches 2. Depth of percolation tests; /4 inches 3. Number of percolation test holes; V holes 4. Ave. percolation rate; /?. 2 mpi 5. Landslope = 3 % D. Rock Layer Dimensions 1. Multiply gpd by 0.83 to obtain required area of rock layer; (,0 0 gpd X 0.83 ° SOO sq ft 2. Select width of rock layer (10 feet or less) = /O feet 3. Length of rock layer = Area ■1 Width-T££_sq ft -j- tO ft " SO ft E. Rock Volume 1. Multiply rock area by rock depth to get cubic feet of rock; SOO sq ft X O.-ySit = 375cu ft 2. Divide cu ft by 27 cu ft/cu yd to get cubic yards; /3. 9 3. Multiply cubic yards by 1.4 to get weight of rock in tons; fjcu yds X 1.4 “ /y, y tons F. Pressure Distribution System 1. Select number of perforated laterals _ _£_ _ _ 2. Select perfor"..ion spacing = 3_ _ft 3. Select perforated lateral length; Note if manifold is at end of rock layer, lateral length is rock layer length less half a perforation spacing. If manifold is in center of rock layer, lateral length is one-half rock layer length less half a perforation spacing. Perforated lateral length = 23.5 ft. 4. Divide lateral length by perfor­ ation spacing to get number of perforations per lateral 5 feet f _3_feet = 2 porfs Note: last perforation must be in end cap, (see page E-14) 5. Multiply perforations per laternl by number of laterals to got total number of perforations; 2 pcrfs/lat X ^ lats = ^2 uur/i •/‘i" 6. Determine required flow rate by multiplying number of perforations by flow per perforation (see page E-17) perfs X .7/ gpm/perf =Jf^gpm 7, Select minimum required lateral diameter from table on Page E-17; enter table with perforation spacing, perforation diameter, and number of perforations per lateral. Select minimum diameter for perforated lateral = / y<f " inches t//<f z'/i" G. Basal V/idth 1. Percolation rate in top 12 inches of soil is /?. ^mpl 2. Select allowable soil loading rate from table on page E-lb; O. (50 gpd/f t^-