Laserfiche WebLink
ON SITE SEWAGE TREATMENT <br />INSPECTION REPORT <br />ORONO I <br />On the S'lirtb Shore of <br />Lake Minnetonka <br />POST OFFICE BOX 66 <br />1335 S. Brown Rd. <br />Crystal Bay, MN 55323 <br />473-7357 <br />OWNER I I \ADDRESS <br />PERMIT NO.'S. SP—----- dates ------ <br />Prt^ r.rJrif^ <br />---------- CONTRACTORS vv- <br />City Ordinance No. 210 requires that each on-site sewage treatment system In Orono be inspected on a regular basis. The on-site sewage <br />treatment system at the above address has been inspected and appears to fail into the category checked below. <br />(This is {S’an existing system □ new construction) <br />[ ] ^ Meets or exceeds current City standards in all respects relating to design, construction, and location. Appears to be operating <br />properly. <br />2 current City standards for new construction (1978 Code) but in most respects appears to be designed, <br />located, and constructed generally in accordance with previous codes. System appears to be functioning properly; no major <br />upgrading of the system is required at this time. <br />] 3 current City standards in many respects relating to design, construction, or location. Appears to be operating <br />*—* adequately at this time, but has a relatively high potential for future problems. No major upgrading of system is required at <br />this time. <br />I I 4 System may or may not meet current City standards for design, construction or location, but is failing topro|)criy treat and <br />dispose of the current input, and is endangering o water supply, or is a source of pollution to surface or groundwaters, or is <br />creating a safely hazard, or is otherwise creating a public nuisance. Please contact the City Inspector to discuss system repair/ <br />replacement procedures. I* drainlield replacement is necessary, soil testing will usually be required, and a design and site plan <br />must bo submitted for review. Your contractor must obtain a permit before work is started. <br />SYSTEM CONDITION f 0 Checked items may require your action) <br />Tank inspection indicates: <br />^ Pumpout not needed at this time. <br />□ Solids accumulation in tanks indicates they should be pump* <br />ed out this year to help prevent future problems. <br />□ Solids accumulation in tanks is at a critical level. Tanks <br />should be pumped out as soon as possible. <br />□ System is discharging to surface. Tanks must be pumped <br />within 48 hours to eliminate surface discharge. <br />□ Inspection risers missing-tanks could not be inspected. <br />Inspection risers 14" dia. pipe) must be installed in each tank <br />at next pumpout. If tanks have not been pumped out within <br />the last three years, they should be pumped out now. <br />O Inspection pipe is located directly over tank baffle. (Does not <br />give accurate measurement of solids accumulation.) If tanks <br />have not been pumped out within the last three years, they <br />should be pumped out now. <br />Drainfield inspection indicates: <br />H Drainfield is dry, no surfacing evident. <br />□ Some evidence of surfacing, not critical yet. <br />□ Drainfield is saturated and visibly discharging untreated <br />effluent to the surface. This condition may require replace* <br />meni or additions to drainlield. Contact the City Inspector <br />immediately. Repairs must be completed within 90 days. <br />□ Drainfield extent and condition unknown. <br />SITE CHARACTERISTICS; <br />Limiting Site Factors <br />□ Slope <br />□ Soil <br />□ High water table <br />S Lot size <br />□ Lake, wetland, or stream <br />□ Drainage <br />Potential lor System Failure <br />(depends on soil types, water <br />table, and system condition) <br />□ Low <br />IS Medium <br />□ High <br />n System is causing visible <br />surface discharge. <br />Site Capabilities for <br />Future Expansion <br />G Adequate <br />B Fair <br />□ Poor <br />□ Inadequate <br />COMMENTS: <br />Date of Inspection ^ptic System^^ior <br />Note; In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, be advised that <br />this report does not guarantee or certify that on existing system will continue to function properly, but is merely an opinion of the adequacy <br />of the system under current conditions based on the available information. <br />This report must bo kept on the premises with system location and pumping records. <br />WHITE COPY / Inspector's File GOLD COPY / Homeowner