Loading...
HomeMy WebLinkAboutP19-000272 - plumbingPERMIT PROJECT FILE #: 19-001849 3180 NORTH SHORE DR WAYZATA MN 55391 INSTALL OWNER PROVIDED FIXTURES AT MAIN LEVEL BAR, UPPER 3/4 BATH. FLOOR DRAINS @ MAIN AND LOWER LEVEL GARAGE.  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Rough In   Assign To Permit #: P19-000272 Install owner provided... Created On 01/08/2020 by Nola Dickhausen Notes DATES Date 01/14/2020    From 1: 30  PM To 2: 00  PM Completion Date 01/14/2020 Status Inspection Passed: Proceed #STATUS COMMENTS   INSPECTION COMMENTS  0 UG for detached garage with living space above. DWV PVC sch 40 with 5lb air test holding. Draining to grinder pump with built in check valve. One trench oor drain with trap and accessible clean out draining to grinder pump. OK to continue. Jim H.  PERMIT PROJECT FILE #: 19-001849 3180 NORTH SHORE DR WAYZATA MN 55391 INSTALL OWNER PROVIDED FIXTURES AT MAIN LEVEL BAR, UPPER 3/4 BATH. FLOOR DRAINS @ MAIN AND LOWER LEVEL GARAGE.  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Rough In   Assign To Permit #: P19-000272 Install owner provided... Created On 02/21/2020 by Anne Hentges Notes DATES Date 02/24/2020    From 2: 00  PM To 2: 30  PM Completion Date 02/24/2020 Status Correct Work & Proceed #STATUS COMMENTS   INSPECTION COMMENTS  0 Detached garage with living space above. AG DWV PVC sch 40 with 5lb air test holding. Radon vented to exterior and insulated. 1. Finish garage oor drains. 2. Provide nail plates and nish water lines and insulate hot waterlines. Correct and ok to continue. Jim H.  PERMIT PROJECT FILE #: 19-001849 3180 NORTH SHORE DR WAYZATA MN 55391 INSTALL OWNER PROVIDED FIXTURES AT MAIN LEVEL BAR, UPPER 3/4 BATH. FLOOR DRAINS @ MAIN AND LOWER LEVEL GARAGE.  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Final   Assign To Permit #: P19-000272 Install owner provided... Created On 09/07/2021 by MnSpect Admin Notes DATES Date 10/04/2021    From 11: 00  AM To 12: 00  PM Completion Date 10/04/2021 Status Permit Finaled Erosion Control Checked, Found Compliant Is Vegetation Established #STATUS COMMENTS     INSPECTION COMMENTS  0 Install pressure relief pipe on water heater in garage 0 Seal pump basket in garage 0 Install water hammer on main dwelling lower level washing machine 