HomeMy WebLinkAboutP19-000240 - plumbingPERMIT PROJECT
FILE #: 19-001650
2587 KELLY AVE EXCELSIOR MN 55331
COMPLETE ROUGH IN OF WASTE, VENT, WATER PIPE AND INSTALLATION OF FIXTURES
INSPECTION INFORMATION
Department
Community Development
Inspection Type
Plumbing - Rough In
Assign To
Permit #:
P19-000240 complete rough in of w...
Created On
12/20/2019 by Nola Dickhausen
Notes
DATES
Date
12/23/2019
From
11: 30 AM
To
12: 00 PM
Completion Date
12/23/2019
Status
Correct Work & Proceed
#STATUS COMMENTS
INSPECTION COMMENTS
0 Detached garage with studio above. DWV PVC sch 40. No air test at this time. Water lines are insulated.
1. Provide some sort of heat source for water lines and DWV in so t area, ( to be built).
2. Provide plumbing manometer at nal inspection. Correct and ok to continue. Jim H.
PERMIT PROJECT
FILE #: 19-001650
2587 KELLY AVE EXCELSIOR MN 55331
COMPLETE ROUGH IN OF WASTE, VENT, WATER PIPE AND INSTALLATION OF FIXTURES
INSPECTION INFORMATION
Department
Community Development
Inspection Type
Plumbing - Final
Assign To
Permit #:
P19-000240 complete rough in of w...
Created On
04/28/2020 by Nola Dickhausen
Notes
DATES
Date
05/01/2020
From
11: 30 AM
To
12: 00 PM
Completion Date
05/01/2020
Status
Inspection Passed: Proceed
Erosion Control Checked, Found Compliant
Is Vegetation Established
#STATUS COMMENTS
INSPECTION COMMENTS
0 Install vacuum breaker on boiler drain in mechanical room.
0 Provide manometer test for new plumbing install.
Jason R.
PERMIT PROJECT
FILE #: 19-001650
2587 KELLY AVE EXCELSIOR MN 55331
COMPLETE ROUGH IN OF WASTE, VENT, WATER PIPE AND INSTALLATION OF FIXTURES
INSPECTION INFORMATION
Department
Community Development
Inspection Type
Plumbing - Final
Assign To
Permit #:
P19-000240 complete rough in of w...
Created On
05/05/2020 by Anne Hentges
Notes
DATES
Date
05/07/2020
From
9: 30 AM
To
10: 00 AM
Completion Date
05/07/2020
Status
Permit Finaled
Erosion Control Checked, Found Compliant
Is Vegetation Established
#STATUS COMMENTS
INSPECTION COMMENTS
0 Corrections complete.
Jason R.
1 Complete Install vacuum breaker on boiler drain in mechanical room.
2 Complete Provide manometer test for new plumbing install.
Jason R.