Loading...
HomeMy WebLinkAboutP19-000231 - plumbingPERMIT PROJECT FILE #: 19-001577 490 SANDHILL DR LONG LAKE MN 55356 PLUMBING NEW CONSTRUCTION  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Rough In   Assign To Permit #: P19-000231 Plumbing new construction  Created On 12/30/2019 by Nola Dickhausen Notes DATES Date 12/31/2019    From 11: 30  AM To 12: 00  PM Completion Date 12/31/2019 Status Correct Work & Proceed #STATUS COMMENTS   INSPECTION COMMENTS  0 UG DWV PVC sch 40 with 5lb air test holding. Backwater valve provided. Radon vented out of 2 10ft lengths of PVC draintile . OK to continue. 1. Do not backll center footing void. Footing must be doweled and extended for mech room doorway header bearing. Jim H.  PERMIT PROJECT FILE #: 19-001577 490 SANDHILL DR LONG LAKE MN 55356 PLUMBING NEW CONSTRUCTION  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Rough In   Assign To Permit #: P19-000231 Plumbing new construction  Created On 01/10/2020 by Nola Dickhausen Notes DATES Date 01/14/2020    From 3: 00  PM To 3: 30  PM Completion Date 01/14/2020 Status Inspection Passed: Proceed #STATUS COMMENTS   INSPECTION COMMENTS  0 AG DWV PVC sch 40 with 5lb air test holding. Water lines are insulated. OK to continue. Jim H.  PERMIT PROJECT FILE #: 19-001577 490 SANDHILL DR LONG LAKE MN 55356 PLUMBING NEW CONSTRUCTION  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Final   Assign To Permit #: P19-000231 Plumbing new construction  Created On 02/26/2020 by Anne Hentges Notes DATES Date 02/27/2020    From 3: 30  PM To 4: 00  PM Completion Date 02/27/2020 Status Inspection Passed: Proceed  Erosion Control Checked, Found Compliant Is Vegetation Established #STATUS COMMENTS       INSPECTION COMMENTS  0 Finish dishwasher install. 0 Provide irrigation vacuum breaker test. 100 Manometer holding Jason R. 101 Fixtures set &and sealed 102 Remove roof caps  PERMIT PROJECT FILE #: 19-001577 490 SANDHILL DR LONG LAKE MN 55356 PLUMBING NEW CONSTRUCTION  INSPECTION INFORMATION Department Community Development Inspection Type Set & Seal   Assign To Nola Dickhausen Permit #: P19-000231 Plumbing new construction  Created On 02/26/2020 by Anne Hentges Notes DATES Date 02/27/2020    From 1: 30  PM To 2: 00  PM Completion Date 03/27/2020 Status Permit Finaled  Erosion Control Checked, Found Compliant #STATUS COMMENTS   INSPECTION COMMENTS  0 rdg: 0000098.42 3/4" ert # 1564680458 serial # 54740718  PERMIT PROJECT FILE #: 19-001577 490 SANDHILL DR LONG LAKE MN 55356 PLUMBING NEW CONSTRUCTION  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Final   Assign To Permit #: P19-000231 Plumbing new construction  Created On 08/24/2020 by Anne Hentges Notes DATES Date 08/25/2020    From 3: 30  PM To 4: 00  PM Completion Date 08/25/2020 Status Permit Finaled  Erosion Control Checked, Found Compliant Is Vegetation Established #STATUS COMMENTS        INSPECTION COMMENTS  0 All work satisfactory. 1 Complete Finish dishwasher install. 2 Complete Provide irrigation vacuum breaker test. 3 Complete Manometer holding Jason R. 4 Complete Fixtures set &and sealed 5 Complete Remove roof caps 