Loading...
HomeMy WebLinkAboutP19-000219 - plumbingPERMIT PROJECT FILE #: 19-001486 1525 BAY RIDGE RD WAYZATA MN 55391 SUPPLY & INSTALL PPLUMBING FIXTURES AT 1ST, 2ND, BASEMENT.  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Rough In   Assign To Permit #: P19-000219 supply & install pplum... Created On 01/10/2020 by Anne Hentges Notes DATES Date 01/16/2020    From 2: 30  PM To 3: 00  PM Completion Date 01/16/2020 Status Inspection Passed: Proceed #STATUS COMMENTS     INSPECTION COMMENTS  0 Provide radon vent for golf simulator area. 100 DWV PVC Schedule #40 102 5# air test holding Jason R.  PERMIT PROJECT FILE #: 19-001486 1525 BAY RIDGE RD WAYZATA MN 55391 SUPPLY & INSTALL PPLUMBING FIXTURES AT 1ST, 2ND, BASEMENT.  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Rough In   Assign To Permit #: P19-000219 supply & install pplum... Created On 02/21/2020 by Anne Hentges Notes DATES Date 02/24/2020    From 11: 00  AM To 11: 30  AM Completion Date 02/24/2020 Status Correct Work & Proceed #STATUS COMMENTS   INSPECTION COMMENTS  0 AG DWV PVC sch 40 with 5lb air test holding. Radon vent from golf simulator area provided per previous inspection. 1. Provide structural straps on top plates of all bearing walls with plumbing penetrations. 2. Finish insulating water lines. Correct and ok to continue. Jim H.  PERMIT PROJECT FILE #: 19-001486 1525 BAY RIDGE RD WAYZATA MN 55391 SUPPLY & INSTALL PPLUMBING FIXTURES AT 1ST, 2ND, BASEMENT.  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Final   Assign To Permit #: P19-000219 supply & install pplum... Created On 08/20/2020 by Alicia Johnson Notes DATES Date 08/27/2020    From 2: 30  PM To 3: 00  PM Completion Date 08/27/2020 Status Permit Finaled  Erosion Control Checked, Found Compliant Is Vegetation Established #STATUS COMMENTS        INSPECTION COMMENTS  0 Add vacuum breakers to water heater. will check at building nal Jason R. 0 Install air gap at main level bar. 0 Install main level and master bath tops 100 Manometer holding 101 Fixtures set &and sealed 102 Remove roof caps 