Loading...
HomeMy WebLinkAboutWell info f "�' 333 East Main Street � P.O.Box 388 Elk River,MN 55330 (763)441-7509 � SiYiS�TEMS (800)554-7509 Fax:(763)441-9176 ECO SYSTEMS ENGINEERING,INC. A-R1dl�:h2018b�11(dlllflk.tl9i July 9, 2003 ���E�VE� PeterThiss '�p� � � ���a 34 Water Street CITY UF p�pNO Suite 200 Excelsior,MN 55331 Subject: Piezometers and Monitoring Well Installation 270 Big Island; City of Orono Hennepin County,Minnesota. Mr. Thiss, As requested, Eco Systems Engineering visited the subject site and installed three piezometers and one monitoring well. The piezometers and monitoring well will allow the observation of groundwater elevations on the subject property. The groundwater elevations will be recorded for a minimum of 12 months to determine the presence of high groundwater on the subject site. The presence of high groundwater is a detemuning factor in the locating of a drain field for a new onsite wastewater system(OWS). Three piezometers were installed at depths of 66 inches, 38 inches and 28 inches below the ground surface. These depths were selected based on the results of ow soil investigation indicating a soil texture, soil color or soil structure change at or neaz these depths. The piezometers are constructed of 1.5 inch schedule 40 pvc pipe with the bottom of the pipe capped. Holes were drilled from the bottom of the pipe to six inches from the bottom of the pipe. A mesh screen was installed around the perforated area of the pipe to prevent clogging. A sand pack was installed around and 2 inches above the screened area with a bentonite bacl�ill to the ground surface. One monitoring well was installed to a depth of 68 inches. The monitoring well is constructed of 1.5 inch schedule 40 pvc pipe with the bottom of the pipe capped. Holes were drilled from the bottom of the pipe to within 12 inches from the ground surface. A mesh screen was installed around the perforated area of the pipe to prevent clogging. A sand pack was installed azound and 2 inches above the screened area with a bentonite backfill to the ground surface. At the time of the installation, groundwater was not observed in any of the piezometers or the monitoring well. Observations will be made and recorded at a minimum of once per month for . .�, Piezometers and Monitoring Well Installation Page 2 the next 12 months with additional observations as climatic conditions warrant at the discretion of Eco Systems Engineering. Atta.ched is the invoice for the services completed to date. You will be billed aga.in at the completion of the monitoring period. Please contact Eco Systems Engineering if you have any questions or require further information. Sincerely, � Peter G. Miller,P.S.S. cc: Matt Bolterman, City of Orono