Loading...
HomeMy WebLinkAboutVan Dale Addition bridge easementRIGHT OF ENTRY TEMPORARY EASEMENT TO CONSTRUCT BRIDGE Old Crustal Bay Road North Street Improvement Project This Agreement made this _ day of , 1993, between VCI Capital, Inc., a Minnesota corporation, its successors and assigns (hereinafter "Owner"), and the City of Orono, a Minnesota municipal corporation (hereinafter "City"). 1. Right to Construct Road and Bridte. The Owner hereby grants the City, its successors and assigns, the temporary right and easement over, under, across and through the real property located in Hennepin County, Minnesota, legally described in the attached Exhibit A which is made a part of this document (hereinafter "Property"), for the City to use and occupy the Property for the purposes stated herein, including but not limited to, the accommodation of equipment, tools, materials and excavated earth, at all times prior to June 30, 1995. This easement includes the free right of the City, its contractors, agents and employees to enter over, under, upon and through the Property at all times prior to June 30, 1995, for the purpose of facilitating the installation and construction of the public road and bridge on the land abutting and/or adjacent to the Property. This easement includes the right, with respect to the Property to: (1) excavate, fill and grade soil thereon, to remove trees, bushes, grass, and other structures which interfere with construction; (2) operate machinery and equipment on and over the Property, to store machinery, equipment, materials and supplies on the Property in connection with the construction of the public improvements; and (3) do what is necessary, useful or convenient for the enjoyment of the easement as granted herein. Following construction, the City will remove all machinery, equipment, materials, supplies and debris, return the Property to grade, replace the existing fence at a location on or near the Property acceptable to Owner, replace the surface soil with the original type of material, seed the Property, and leave the Property in a neat and presentable manner. 2. Agreement Documents. This Agreement consists of this Agreement and Exhibit A. 3. Covenant of Ownership. The Owner covenants that it is the record fee owner of the Property, that it has legal title to the Property and has lawful right and authority, without restriction, to convey and grant the right of entry and temporary easement as granted in this Agreement, subject only to the consent of any party having a record interest in the Property. 357/2201796111/30/93 CITY OF ORONO : 1.9 VCI CAPITAL, INC. STATE OF MINNESOTA ) ss. COUNTY OF HENNEPIN ) The foregoing instrument was acknowledged before me this 1c��`day of nuc , 1993, by 4. and 71� .G�i% , the ayor and ity Clerk of the City ofhron0, a Min esota municip corporation, who executed this Agreement and acknowledged that they executed the same on behalf of the City. �•.I IE L. BOSMA PUBLIC -MINNESOTA NEPIN COUNTY m. Expires 12-19 97 STATE OF MINNESOTA ) )ss. COUNTY OF nne i n ) Nod �ublic The foregoing instrument was acknowledged before me this zoo' day of DeeAm h a r- , 1993, by berg P 1n3� the of VCI Capital, Inc., a Minnesota corporation, on behalf of the corporation. Notary This instrument was drafted by: Popham, Haik, Schnobrich & Kaufman, Ltd. 3300 Piper Tower 222 South 9th Street Minneapolis, MN 55402 (612) 333-4800 -2- 357/2201796111/30/93 ELAINE THOMPSON iV ROTARY PUBLIC—MINNESOTA HENNEPIN COUNTY �', My Comm. tWrat Jum 20. 19% v ■ Legal Description A temporary easement for construction purposes over, under and across the west 10.0 feet of Lot Three (3), Block One (1), Van Dale Addition. Said temporary easement shall expire automatically on June 30, 1995, without the need for further recording. 357/2201796111/30/93