Loading...
HomeMy WebLinkAbout2709 Walters Point Easement, Pence Lane AdditionExisting Certs 1479204 11111111111111111111111111111111111111111111111111 �111 LAND TYPE Torrens (T) DOC NUM 5737151 Certified, filed and/or recorded on Aug 5, 2020 4:30 PM Office of the Registrar of Titles Hennepin County, Minnesota Martin McCormick, Registrar of Titles Mark Chapin, County Auditor and Treasurer Deputy 55 Pkg ID 2052280M Attested Copy or Duplicate Original $2.00 Document Recording Fee $46.00 Document Total $48.00 This cover sheet is now a permanent part of the recorded document. (resowd for recording information) DECLARATION AND EASEMENT THIS DECLARATION AND EASEMENT (Declaration) is made this 8th day of July , 2020, by William M & Susan K Dunkley, individuals (Declarant) in favor of the Minnehaha Creek Watershed District (MCWD), a special purpose local unit of government with purposes and powers pursuant to Minnesota Statutes Chapters 103B and 103D and the Declaration and Easement in favor of the City of Orono ("City"), a Minnesota municipal corporation. RECITALS WHEREAS Declarant owns real property within the City of Orono, Hennepin County, Minnesota, platted and legally described as: Lot 1, Block 1, PENCE LANE ADDITION Property ID: 21-117-23-23-0060 2709 Walters Port Lane, Orono, MN 55331 (the Property) and no one other than Declarant, William M & Susan K Dunkley, has any right, title or interest in the Property; and WHEREAS, the Property constitutes the entirety of the land to which MCWD Permit # 20-292 applies; and WHEREAS, the Declarant desires to subject the Property to certain conditions and restrictions imposed by the MCWD as a condition to issuance of Permit # 20-292 for the mutual benefit of the MCWD and the owners of the Property; and WHEREAS the Declarant intends to construct Stormwater Facilities on the Property that are subject to the requirements set forth in City of Orono City Code; and NOW, THEREFORE, Declarant makes this Declaration and hereby declares that this Declaration shall constitute covenants to run with the Property in perpetuity, and further declares that the Property shall be owned, used, occupied and conveyed subject to the covenants, restrictions, easements, charges and liens set forth in this Declaration, all of which shall be binding on all persons owning or acquiring any right, title or interest in the Property, and their heirs, successors, personal representatives and assigns. All features requiring maintenance identified on the scaled site plan for the Property attached hereto and incorporated herein as Attachment A will be maintained in perpetuity in accordance with as follows: 1. WATERBODY CROSSINGS & STRUCTURES a. Crossings and structures in contact with the bed or bank of a waterbody will be inspected at least once every 5 years and maintained in good repair in perpetuity to ensure continuing adequate hydraulic and navigational capacity is retained in accordance with approved plans, to ensure no net increase in the flood stage beyond that achieved by the approved plans, to prevent adverse effects on water quality, changes to the existing flowline/gradient and increased scour, erosion or sedimentation, and to minimize the potential for obstruction of the waterbody. 2. STORMWATER FACILITIES a. Underground storage facilities. Underground storage facilities will be inspected at least annually to ensure continuing performance per design. Capacity will be considered inadequate if sediment has decreased the storage volume by 50 percent of the original design volume. Accumulated debris and sediment will be removed, and inlet and outlet structures will be kept clear of any flow impediments. b. Grit chambers, sump catch basins and sump manholes. Grit chambers, sump catch basins and sump manholes will be inspected once each year. All sediment and debris will be removed as needed such that the stormwater facilities operate as designed and permitted. c. Proprietary stormwater facilities. Proprietary stormwater facilities will be inspected at least annually and maintained as specified or recommended by the manufacturer and/or installer as described in Attachment B. d. Scope of Inspection. The inspection shall cover, without limitation, the entire stormwater runoff management facilities, including access roads and buffers. Deficiencies shall be noted in the inspection report. A stormwater runoff management facility will be considered inadequate if it is not compliant with all requirements of the Plan approved by the City and MCWD and City stormwater maintenance standards. e. Reporting. The Declarant will submit to the MCWD and to the City once every 5 years a brief written report that describes stormwater facility maintenance activities performed under this declaration, including dates, locations of inspections and the maintenance activities performed. The Declarant shall be responsible for the payment of any associated costs. f. City Access and Maintenance Rights. The Declarant hereby grants permission to the City, its authorized agents and employees, to enter upon the Property and to inspect the stormwater runoff management facilities whenever the City deems necessary. The City shall provide the Declarant, its successors and assigns, copies of the inspection findings and a directive to commence with the repairs if necessary. g. Failure to Maintain. In the event the Declarant, its successors and assigns, fails to maintain the Stormwater Facilities in good working condition acceptable to the City and such failure continues for 60 days after the City gives the Declarant written notice of such failure, the City may enter upon the Property and take whatever steps necessary, including excavation and the storage of materials and equipment, to correct deficiencies identified in the Inspection Report. The City's notice shall specifically state which maintenance tasks are to be performed. The City may charge the costs, including assessing the City's costs to the Declarant's property taxes of such repairs, to the Declarant, its successors and assigns. This provision shall not be construed to allow the City to erect any structure of permanent nature on the land of the Declarant outside of the Easement Area for the Stormwater Facilities. It is expressly understood and agreed that the City is under no obligation to routinely maintain or repair said Stormwater Facilities, and in no event shall this Agreement be construed to impose any such obligation on the City. In addition, Declarant agrees that it is, and will be, solely responsible to address complaints and legal claims brought by any third party with regard to the maintenance and operation and the consequences there from the Stormwater Facilities. The Declarant expressly agrees to defend and hold the City harmless from any such third -party claim. 3. GRANT OF EASEMENT a. Declarant hereby grants to the City, its successors and assigns, a permanent non- exclusive easement for the purpose of accessing and maintaining the Stormwater Facilities pursuant to the terms of this Agreement over, on, across, under and through the Easement Area. b. The easement shall include the rights, but not the obligation, of the City, its contractors, agents, servants, and assigns, to enter upon the Easement to construct, reconstruct, inspect, repair, and maintain said private Stormwater Facilities together with the right to grade, level, fill, drain, pave, and excavate the Easement Area, and the further right to remove trees, bushes, undergrowth, and other obstructions interfering with the location, construction, and maintenance of said private Stormwater Facilities systems. 4. REIMBURSEMENT OF COSTS The Declarant agrees to reimburse the City for all costs incurred by the City in the enforcement of this Agreement, or any portion thereof, including court costs and reasonable attorneys' fees. 5. INDEMNIFICATION. This Agreement imposes no liability of any kind whatsoever on the City. The Declarant hereby agrees to indemnify and hold harmless the City and its agents and employees against any and all claims, demands, losses, damages, and expenses (including reasonable attorneys' fees) arising out of or resulting from the Declarant or the Declarant's agents or employee's negligent or intentional acts, or any violation of any safety law, regulation or code in the performance of this Agreement, without regard to any inspection or review made or not made by the City, its agents or employees or failure by the City, its agents or employees to take any other prudent precautions. In the event the City, upon the failure of the Declarant to comply with any conditions of this Agreement, performs said conditions pursuant to its authority in this Agreement, the Declarant shall indemnify and hold harmless the City, its employees, agents and representatives for its own negligent acts in the performance of the Declarant's required work under this Agreement, but this indemnification shall not extend to intentional or grossly negligent acts. 6. RECORDING, BINDING EFFECT. This Agreement is a personal obligation of Declarant for so long as Declarant owns fee title to the Subject Property and shall be binding upon the executors, administrators, successors, heirs and assigns of Declarant with respect to Declarant's obligations and liabilities under this Agreement that relate to the period of its ownership. This Agreement shall be recorded against the title to the Subject Property and shall run with the land and be binding upon each owner of fee title to the Subject Property with respect to the period of its ownership. Upon the conveyance of fee title to the Subject Property, the transferor will have no further obligations or liabilities under this Agreement that relate to any time after the conveyance, and the new owner will, by accepting title to the Subject Property, become bound by this Agreement with respect to all obligations and liabilities of the "Declarant" that relate to any time after the conveyance, for as long as the new owner owns fee title to the Subject Property. Both the Declarant and a subsequent property owner are liable to the MCWD and the City for performance under this Declaration, and the MCWD and/or the City may seek any remedy in law or equity against the Declarant as long as the declarant owns the Property, and thereafter against a subsequent property owner to enforce this Declaration. [the remainer of this page is left intentionally blank] DECLARANTS: r� illiam M. Dunkley Susan K. Dunkley STATE OF MINNESOTA ) )ss. COUNTY OF HENNEPIN ) The foregoing instrument was acknowledged before me this lb"- day of ,.2020, by William M. Dunkley and Susan K. Dunkley, husband and wife. lo ry Public fREBECCA L. SCHEMER s. Notary Public-MWMota My Comda M E0ft Jan 31,2= - - •�,' - �-�,`\,. 'rig � }r � , CITY OF ORONO (SEAL) Administrator STATE OF MINNESOTA ) (ss. COUNTY OF HENNEPIN ) City The foregoing instrument was acknowledged before me this day of 20_;o, by bt0fl'i5 b/a15ti and by ()tit k (' respect vely the Mayor and City Administrator of the City of Orono, a Minnesota municipal corporation, on behalf of the corporation and pursuant ttq the authority granted by its City Council. NOTARY PUBLIC ANNA MARIE CARLSON eytkit �_ NOTARYPUBLIC- MINNESOTA ��'y My Commission Expires Jan. 31, 2025 This Instrument Was Drafted By: Beth Keister, P.E., ENV SP Pinnacle Engineering, Inc. 11541 95h Ave. N. Phone: 763.315.4501 Email: bkeister@pineng.com MINNEHAHA CREEK QUALITY OF WATER WATERSHED Declaration & Easement Attachment B DISTRICT QUALITY OF LIFE Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, maps, and all other supporting data submitted by the applicant, and made a part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant named below for use and development of land in the Minnehaha Creek Watershed District. Issued to: William and Susan Dunkley Permit No: 20-292 Location: 2709 Walters Port Lane, Orono Purpose: Erosion Control — Stormwater BMP Installation Date of Issuance: 07/08/2020 Date of Expiration: 07/08/2021 By Order of the Board of Managers &6�-- mew l Erin Manlick Permitting Assistant This permit is not transferable without District approval, and is valid to the date of expiration. No activity is authorized beyond the expiration date. If the permittee requires more time to complete the project, an application for renewal of the permit must be received by the District at least 30 days before expiration. The applicant is responsible for compliance with all District Rules and for the action of their representatives, contractors, and employees. Conditions: Project to be completed as described in plans submitted to the MCWD office on June 12, 2020 according to the provisions of this permit. • Properly install and maintain all required erosion control measures until the disturbed areas are re -stabilized • Notify MCWD in writing upon completing installation of perimeter and sedimentation controls • When the site is re -stabilized and the MCWD staff has performed a final inspection, all perimeter control must be removed (Statement concerning fees for inspections, violations, etc... on following page) We collaborate with public and private partners to protect and improve land and water for current and future generations. ...................................................................................................................................................................................... . ...................................................................................................................................................................................... . ....................................................................................................................................................................................... ....................................................................................................................................................................................... 15320 Minnetonka Boulevard, Minnetonka, MN 55345 • (952) 471-0590 • Fax: (952) 471-0682 • www.minnehahacreek.org MINNEHAHA CREEK QUALITY OF WATER WATERSHED DISTRICT QUALITY OF LIFE Inspection/Analysis/Monitoring Fees A site inspection and monitoring by District staff will be performed where the activity involves: • a commercial/industrial/multi-family residential development • a single family residential development greater than 5 acres or of any size if within the Minnehaha Creek subwatershed • any alteration of a floodplain or wetland • dredging within the beds, banks or shores of any protected water or wetland • a violation • any project which in the judgment of the District staff should be inspected due to project location, scope, or construction techniques In these cases, the applicant shall pay to the District a fee equal to the actual costs of field inspection of the work, including investigation of the area affected by the work, analysis of the work, and any subsequent monitoring of the work, which in the case of a violation shall be at least $35. District professional staff District clerical staff Consulting Senior Engineer Consulting Engineer/Technician District Counsel Application fee Copy costs Color copy costs * Hourly Standard Fee Schedule $ 65.51 * $ 46.69* $ contracted rate $ contracted rate $ contracted rate $ 10.00 $ .25 + actual staff time $ 1.00 + actual staff time We collaborate with public and private partners to protect and improve land and water for current and future generations. ...................................................................................................................................................................................... . ....................................................................................................................................................................................... ...................................................................................................................................................................................... . ....................................................................................................................................................................................... 15320 Minnetonka Boulevard, Minnetonka, MN 55345 • (952) 471-0590 • Fax: (952) 471-0682 • www.minnehahacreek.org Declaration & Easement z zW� § z A 4F, a v'oi i e � / _�III —"//�/%- / /—�y�Q_; /\ // \ \\ _ `_`i:— — _ �\\ _\_\�_g_\ /�t/ :. M�I:I .\y ...n ._„...y.s9../'\%-9j 95./�b.i._d..s.:...\,�.:-/—...i... • N/ /7- \`�y 2yu_•`,FiE'.�^ a} \q ' \t ,as ' I 6€ `•`r.II W aa zVi3 . Attachment A E-6 ,c0a ao00s .... 010 .............. 003425 W 414.33............................................................. Oo .J...2OJJ w 20.0063.94 ------------------ w6 46A — vj o DME z .........gO°34'25212.4}6 04 0 W4 PC; J� "rn,an = z a 4' � I O �, _ ..........._ ...................I 1 I , '-I�i \\ham nrl \ a IG �I Z ; N 06:.. ) I II o \I I I Iol la I i I �I �/ al /zQ gyp\ I ,\� 11 \ I �\ al :' X 1 W� neo I I , o l l I I l a 20 � N/ j �/ j � � � �8 � Amo '���� �', I � 1�,� � \�� I \\ s I6 r_•1`: i x 20/I I • I I $ 3, 3 �\ ; 1 \ \ 0000` I n�I sl (•; I I I I i �ql� /1 I a i l l xl a' 1 1' I �\\ 41 I `�------------ I L—• I "-------------- -� I I —a \ \ �Ssr 6�� S..., 5' 40" W U .............................................. --------- —L�— \ 011010.00 W _----- — o 44'O P05' 43" E — -- -- ---- 320.64�--m........,..�....../...9n_........L.. 213.83 O WALTERS PORT LANE ^ \ J / 320.64 r' wn \ or fa' a\52 Ssi ' z = o I W MMI Gns 9raas @ d S r s X N E zo o E p ao c v �H o1 �Qi3j 0O v v � � ° ...`'` 5,. J.:: '' I � I— = N •� 'a YAC - a� \ rW� O W Y v v oo o<o ,... t•. a :/.�. ,1 './ o i o —— ' No a /_l-Zo WF oo.E">v oS/ D105'40" W 76 °mo aIR / 1 I Qao / � N oo "oWZ Eyo Y �� W C C O r ��I of o 0 0 c v 3:0 Ts I1--�� (/�► Z v `o F y c 3$z a a» 1--� 1"�1 F-1 w z z `o o v m v o o •c o 3 W� .� �i /r \ cj �'� I 8 4> a v �, Ui IT, oo c y `v a h o v o.N ' \ o � .'-i � O z z w w � E E � o � o � uvi " a- o, o— — �t •' i \ � �, •� .. °`°`� ' � � / /o+`' // �'-: a¢ v = c o o f° c W o a JJ o o .� n 9x o No °a q H C)O N N N N N N N � �✓ 0 1Z 000 78 C, ¢ wwo 0 0 o vX�o ac c c c c co y3i ' }4 W (1% (� to Y Y o o v a v o c `o z gt `'^......; 10 I w �� E --I �Jr ,•i C .J -9.2 0 • O v? a I j7J4.16 may' f -L{ GO mm _ ...—......i_. — �..—— --------- vyy f _v G}ABEp p _W JJ ........._N qg7 116,20 $ 00°32' 43" E HZ o oar vQ� w o� mmm mmmm m 20-046A DUNKLEY UNDERGROUND STORMWATER SYSTEM CITY OF ORONO: MELANIE CURTIS, PLANNER 952.249.4627 ART TAYLOR, CITY INSPECTOR 612.756.2048 PINNACLE ENGINEERING, INC. BETH KOSTER, P.E. 11541 95TH AVENUE NORTH MINNEAPOLIS, MN 55369 763.277.8408 1 BKEISTER@PINENG.COM UTILITY CONTACTS: GOPHER STATE ONE CALL CALL 48 HOURS PRIOR TO EXCAVATION TO LOCATE UTILITIES 651.454.0002 0 20 40 Miles ORONO, MN DRAWING INDEX SHEET NO. TITLE 00 TITLE SHEET 01 EXISTING CONDITIONS 02 PROPOSED SAND FILTER LAYER 03 PROPOSED CONDITIONS SYSTEM 04 DETAILS 05 DETAILS 0 0.5 Miles GENERAL NOTES: 1. EXISTING INFORMATION TAKEN FROM SURVEY BY GRONBERG & ASSOCIATES, INC., LATEST REVISION DATED 5-11-2020, PROJECT NUMBER 20-046A. BACKGROUND SURVEY ON THESE DRAWINGS IS FOR REFERENCE ONLY. REFER TO CERTIFIED SURVEY AS THE BASIS FOR ALL PROJECT WORK. 2. BENCHMARKS ARE INCLUDED ON DRAWING NO. 1. BENCHMARKS ARE PROVIDED AS TWO (2) TNH, NGVD 1929. 3. CONTRACTOR WILL NOTIFY ENGINEER OF MONUMENTS OR BENCHMARKS THAT ARE DISTURBED BY CONSTRUCTION. 4. OWNER WILL STAKE EASEMENTS AS REQUIRED FOR CONTRACTOR TO PERFORM INSTALLATION. 5. CONTRACTOR SHALL NOTIFY GOPHER STATE ONE -CALL AND OBTAIN PUBLIC AND PRIVATE UTILITY LOCATIONS PRIOR TO INITIATING WORK. 6. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS INCLUDING LOCATIONS OF EXISTING PUBLIC AND PRIVATE UTILITIES AND NOTIFY ENGINEER OF DISCREPANCIES AFFECTING THE WORK PRIOR TO STARTING CONSTRUCTION. 7. ALL EXISTING UTILITIES AND OTHER IMPROVEMENTS ARE TO REMAIN UNLESS NOTED OTHERWISE. 8. ALL LANDSCAPING AND EXISTING TREES AND SHRUBS ARE TO REMAIN UNLESS NOTED OTHERWISE. 9. SUBSURFACE GEOTECHNICAL INVESTIGATION REPORT AVAILABLE UPON REQUEST. 10. CONTRACTOR TO KEEP FROM DAMAGING EXISTING IMPROVEMENTS, LANDSCAPING, STRUCTURES AND UTILITIES THAT ARE TO REMAIN. CONTRACTOR TO REPAIR DAMAGE AT OWN EXPENSE. 11. ALL WORK TO CONFORM TO CITY OF ORONO, MINNEHAHA CREEK WATERSHED DISTRICT, FEDERAL, STATE OF MINNESOTA AND OTHER APPLICABLE STANDARDS AND REGULATIONS. 12. ALL EXCAVATIONS WILL COMPLY WITH THE REQUIREMENTS OF OSHA 29 CFR, PART 1926, SUBP. P., "EXCAVATIONS AND TRENCHES." THIS DOCUMENT STATES THAT EXCAVATION SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 13. CATCHBASINS AND MANHOLES ARE SHOWN ON PLAN LARGER THAN ACTUAL SIZE. COORDINATE LOCATIONS OF CATCHBASIN AND MANHOLE COVERS AND CASTINGS WITH PIPING AND OTHER FEATURES. 14. COORDINATE WITH OWNERS ON WORK OUTSIDE OF EASEMENTS, BUT WITHIN PROPERTY BOUNDARIES OF 2709 WALTERS PORT LANE AND 2710 PENCE LANE. 15. DO NOT PERFORM WORK OUTSIDE OF PROPERTY BOUNDARIES. ANY WORK REQUIRED TO BE PERFORMED OUTSIDE OF PROPERTY BOUNDARIES MUST BE APPROVED BY OWNER AND ALL REGULATING GOVERNMENTAL ENTITIES AND APPROPRIATE PERMITS MUST BE OBTAINED. 16. CONTRACTOR IS WILL OBTAIN PERMITS AND PAY FEES ASSOCIATED WITH CONSTRUCTING THIS WORK. 17. PROVIDE TRAFFIC CONTROL, AS REQUIRED, AT STREETS AND SIDEWALKS AND PUBLIC RIGHT-OF-WAY PER CITY OF ORONO, HENNEPIN COUNTY AND MNDOT REQUIREMENTS. TRAFFIC CONTROL DESIGN, RELATED PERMITTING, AND DRAWINGS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 1IS Q v Saga Hill North Arm et s/,"", M Shorcho gs Bay N SSore Or . 0 Crystal Bay �2 3 �� Smiths Bay Crystal Bay West Arm Minnetonka Beach "°`D' Spring Park Lafayette Bay Lake Minnetonka Spring Di Bay Island Mahpiyata SITE LOCATION Island Island Park Shady Tonka Bay Island Gree Enchanted ^ Gideon Bay Island )p awatosa �►' g Excelsior Island Eureka Shorewood ( "r;: •� 0 0.5 Miles GENERAL NOTES: 1. EXISTING INFORMATION TAKEN FROM SURVEY BY GRONBERG & ASSOCIATES, INC., LATEST REVISION DATED 5-11-2020, PROJECT NUMBER 20-046A. BACKGROUND SURVEY ON THESE DRAWINGS IS FOR REFERENCE ONLY. REFER TO CERTIFIED SURVEY AS THE BASIS FOR ALL PROJECT WORK. 2. BENCHMARKS ARE INCLUDED ON DRAWING NO. 1. BENCHMARKS ARE PROVIDED AS TWO (2) TNH, NGVD 1929. 3. CONTRACTOR WILL NOTIFY ENGINEER OF MONUMENTS OR BENCHMARKS THAT ARE DISTURBED BY CONSTRUCTION. 4. OWNER WILL STAKE EASEMENTS AS REQUIRED FOR CONTRACTOR TO PERFORM INSTALLATION. 5. CONTRACTOR SHALL NOTIFY GOPHER STATE ONE -CALL AND OBTAIN PUBLIC AND PRIVATE UTILITY LOCATIONS PRIOR TO INITIATING WORK. 6. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS INCLUDING LOCATIONS OF EXISTING PUBLIC AND PRIVATE UTILITIES AND NOTIFY ENGINEER OF DISCREPANCIES AFFECTING THE WORK PRIOR TO STARTING CONSTRUCTION. 7. ALL EXISTING UTILITIES AND OTHER IMPROVEMENTS ARE TO REMAIN UNLESS NOTED OTHERWISE. 8. ALL LANDSCAPING AND EXISTING TREES AND SHRUBS ARE TO REMAIN UNLESS NOTED OTHERWISE. 9. SUBSURFACE GEOTECHNICAL INVESTIGATION REPORT AVAILABLE UPON REQUEST. 10. CONTRACTOR TO KEEP FROM DAMAGING EXISTING IMPROVEMENTS, LANDSCAPING, STRUCTURES AND UTILITIES THAT ARE TO REMAIN. CONTRACTOR TO REPAIR DAMAGE AT OWN EXPENSE. 11. ALL WORK TO CONFORM TO CITY OF ORONO, MINNEHAHA CREEK WATERSHED DISTRICT, FEDERAL, STATE OF MINNESOTA AND OTHER APPLICABLE STANDARDS AND REGULATIONS. 12. ALL EXCAVATIONS WILL COMPLY WITH THE REQUIREMENTS OF OSHA 29 CFR, PART 1926, SUBP. P., "EXCAVATIONS AND TRENCHES." THIS DOCUMENT STATES THAT EXCAVATION SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. 13. CATCHBASINS AND MANHOLES ARE SHOWN ON PLAN LARGER THAN ACTUAL SIZE. COORDINATE LOCATIONS OF CATCHBASIN AND MANHOLE COVERS AND CASTINGS WITH PIPING AND OTHER FEATURES. 14. COORDINATE WITH OWNERS ON WORK OUTSIDE OF EASEMENTS, BUT WITHIN PROPERTY BOUNDARIES OF 2709 WALTERS PORT LANE AND 2710 PENCE LANE. 15. DO NOT PERFORM WORK OUTSIDE OF PROPERTY BOUNDARIES. ANY WORK REQUIRED TO BE PERFORMED OUTSIDE OF PROPERTY BOUNDARIES MUST BE APPROVED BY OWNER AND ALL REGULATING GOVERNMENTAL ENTITIES AND APPROPRIATE PERMITS MUST BE OBTAINED. 16. CONTRACTOR IS WILL OBTAIN PERMITS AND PAY FEES ASSOCIATED WITH CONSTRUCTING THIS WORK. 17. PROVIDE TRAFFIC CONTROL, AS REQUIRED, AT STREETS AND SIDEWALKS AND PUBLIC RIGHT-OF-WAY PER CITY OF ORONO, HENNEPIN COUNTY AND MNDOT REQUIREMENTS. TRAFFIC CONTROL DESIGN, RELATED PERMITTING, AND DRAWINGS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 0 z ::)2 OW W WU) 0 Z H �Q W J Y z0 7 O a CD a W W s o 2 U) w W o J � L� U r 0 a v >Ln V Z�oI Q �T ,� C�U,-6 i�, M� a �W ,- L10� � �2 3 �� 0 z ::)2 OW W WU) 0 Z H �Q W J Y z0 7 O a CD a W W s o 2 U) w W o J � L� U r 0 a w o 0 0 z ::)2 OW W WU) 0 Z H �Q W J Y z0 7 O a CD a W W s o 2 U) w W o J � L� U r 0 a LEGEND ——PROPERTY LINE -FA—RIGHT OF WAY ------GAS LINE —a—�—UNDERGROUND ELECTRIC —a—a—OVERHEAD ELECTRIC — �— �— UNDERGROUND TELECOM —�—�—EXISTING STORMSEWER — — EXISTING DRAINTILE (APPROX) —I —I —WATERMAIN —> -SANITARY SEWER EASEMENT EXISTING MA30R CONTOUR --- EXISTING MINOR CONTOUR — �— �— SILT FENCE — a— a— BIO LOG DRAINAGE ARROW HYDRANT GATE VALVE WATER BOX NOW UfiLIIY SHOWN BASED ON APPROXIIMTE LOCATION FROM LANDOWNER, CONIRAROR'S RESPONSISJUTY TO LOCATE UTILITIES PRIOR TO CONSTRUCTION. REMOVAL NOTES: 1. REFER TO COVER SHEET FOR GENERAL NOTES. 2. NOT FY ENGINEER OF TREES, PLANTINGS OR LANDSCAPING MATERIALS REMAINING WITHIN THE ANTICIPATED LIMITS OF CONSTRUCTION. THESE WILL BE REMOVED BY OTHERS. 3. CONTRACTOR WILL REMOVE ASPHALT OVER TRENCH ALIGNMENT FOR STORM SEWER FROM CB -02 TO MH -03. BACKFILL TO SURFACE ELEVATION OF SURROUNDING ASPHALT. ASPHALT REPLACEMENT SHALL BE BY OTHERS. SEE DRAWING NO. 03 NOTE: A PORTION OF THE ADJOINING HOUSE LOCATION TAKEN FROM A SURVEY BY CARDARELLE DATED 3-18-18. _I SILT FENCE & BIO \ \ ••. .'. __-LOG S'APART . .I. '. f I• �1f�.► \� f\.. rri ..,III•. \ � INV. 936.0 . INV. 929.6 NOLIN.ONFES INV. 929.7 J �' . . . - . ............ . . . . . . . . . ........... .. .. .. I 4 / REMOVE IF / - NO INV. ON / •CONFIRMED S END OF PIPE /4 EXISTING j S � 0 20 40 Feet I PATCH BASIN 1 TOP -942.5 INV. E=941.0 aN iNV. W=936.3 o wQ W �1�1111�� INV. 942.6 \ . . . . .. _-INV. 942.9.,-1 .M.. >....� 1 TNH=(946.91)•. y J, K �• ` �� ' ' .'.'.'... .. .'.'.'.'.'.'.'.'. ".'.'.'..'. l\ '.".'.� •�L � lL Ir' HDPE .. -... \. FNE 6" DRAIN TILE LINES IN SINGLE TRENCH, END POINT IS APPROXIMATE El LOT EXISTING � � I• >•�� • 4" PVC _ �'T INV. 942.0 ; r_INV. 942.1 DRAINAGE & UTIIiIY • •.F ; EASEMENTS mki TNH=(949.73) 1 I I UTILITY EASEMENT PER DOG NO. 1024262 I I I I i 1 } I HOUSE DRAINAGE & UTILITY EASEMENTS � / E G aN w wa o wQ W �1�1111�� O Q � is U Ol p¢p,, 6 HOUSE DRAINAGE & UTILITY EASEMENTS � / E G aN w wa o wQ W O n O Q � is U Ol p¢p,, 6 HOUSE DRAINAGE & UTILITY EASEMENTS � / E G LEGEND EROSION AND SEDIMENT CONTROL NOTES: _—PROPERTY LINE 1, REFER TO COVER SHEET FOR GENERAL NOTES. RIGHT OF WAY 2. REFER TO DRAWING NO.3 FOR EROSION PROTECTION OF STORMWATER MANAGEMENT SYSTEM. ------ GAS LINE 3. CONFIRM PERIMETER AND OTHER SEDIMENT CONTROL ITEMS PRIOR TO CONSTRUCTION. NOTIFY — a— m— UNDERGROUND ELECTRIC D ENGINEER OF ANY EROSION CONTROL MEASURES REQUIRED TO BE INSTALLED OR EXISTING — m— m— OVERHEAD ELECTRIC MEASURES REQUIRING REPLACEMENT. 1T 4. INSTALL TRM AS SHOWN ON DRAWING NO. 03. SEED AREA WITH DELUXE 50 TURF MIX PRIOR TO — �— K—UNDERGROUND TELECOM _�• TRO INSTALLATION. —»---EXISTING SfORMSEWER 5, NO LANDSCAPING OR PLANTINGS ARE REQUIRED IN THIS CONTRACT. — , — EXISTING 6" DRAINTILE (APPROX) 6. DISTURBED AREAS WILL BE REVEGETATED WITH SOD, BY OTHERS. —I —I — WATERMAIN 7. PROTECT TEMPORARY STOCKPILES WITH PERIMETER BIOLOGS, AND COVER IF THEY WILL REMAIN —a —> — SANITARY SEWER UNDISTURBED FOR MORE THAN 14 DAYS, EASEMENT 4• SINGLE WALLCORRUGATED, EXISTING MAJOR CONTOUR PERFORATED, HDPE PIPE WITH SOCK EXISTING MINOR CONTOUR MEETING ASTM D6707. NO SLOPE TO TILE. — r— r— SILT FENCE TILE ARE INSTALLED ON TOP OF —�—�—BIO LOG GEOTEXTILE AT ELEV. 938.0 ............ DRAINAGE ARROW I I :: OT D4 HYDRANT GATE VALVE I WATER BOX NOTE: UTILITY SHOWN BASED ON APPROXIHATE LOCATION FROM LANDOWNER, CONTRACTOR'S RESPONSIBILITY TO LOCATE UTILITIES PRIOR TO CONSTRUCTION. NOTE: A PORTION OF THE ADJOINING HOUSE LOCATION TAKEN FROM A SURVEY BY CARDARELLE�DAATED 3-18-18. 0 20 40 Feet 1 _ REMOVE WSTING 12" HOPE CULVERTLVERTLVERT ...- _ .tAi > .0�. . >_..�l.. . .. ... ... ... .. \ .. TNH=(946.91). ... . . . .. . .... ... . . . . . ..... . . ... ROPOSED DRA WAGE AREA =15,230 FT2 \ ♦ FIVE 6• DRAIN TILE LINES' �- IN SINGLE TRENCH, END i T ` POINT IS APPROXIMATE ♦ �_- \\� LOT Z ♦ ♦ , EXISleN n ®■all -mm II I 301 MINIM M CLEARANCE ki BETWEEN STORMTECH BED - I//.� �&SANRARY SERVI� II / PROF '.DRIVi HOUSE / ♦�1 ��... /' ♦♦: PROPOSED .'...... . /♦�/ ........ �..... ..... �1 & UTILITY EASEMENTS I EXISTING i FOR INSULATION a 7> _ m- 1- m - m m aim _ FES INV. ELEV. • .:. 93745 FT MSL .R CONTRACTOR TO VERIFY wIn0 •� ' /� 44 LF 6•ADS SINGLE ' �• f WALL DRAINAGE PIPE- FORCEMAIN PRIOR TO G. In3 D Ay % 6YSTEM. ADDRESS ANY 1T I . `... LL RIF,R AT Elt BED ... / �'• _�• TRO I LMUTY EASEMENT \ ♦ FIVE 6• DRAIN TILE LINES' �- IN SINGLE TRENCH, END i T ` POINT IS APPROXIMATE ♦ �_- \\� LOT Z ♦ ♦ , EXISleN n ®■all -mm II I 301 MINIM M CLEARANCE ki BETWEEN STORMTECH BED - I//.� �&SANRARY SERVI� II / PROF '.DRIVi HOUSE / ♦�1 ��... /' ♦♦: PROPOSED .'...... . /♦�/ ........ �..... ..... �1 & UTILITY EASEMENTS I EXISTING i FOR INSULATION a 7> _ m- 1- m - m m aim TNH=(949.73) .R CONTRACTOR TO VERIFY wIn0 LOCATION OF WATER / W IA N M C moRI; FORCEMAIN PRIOR TO G. In3 D INSTAWNGSTORMTF % 6YSTEM. ADDRESS ANY C� CONFLICTS IN ADVANCE. ... / �'• I LMUTY EASEMENT I PER DOC. NO. 1024262 UMITS OF BED 4• SINGLE WALLCORRUGATED, 12" SAND FILTRATION PERFORATED, HDPE PIPE WITH SOCK LAYER IN BASE OF 94722' MEETING ASTM D6707. NO SLOPE TO TILE. BOTTOM OF BED/SAND BED, BOTTO TILE ARE INSTALLED ON TOP OF LAYER MSL. GEOTEXTILE AT ELEV. 938.0 ............ -:• . I I :: OT 2 I 0 z aft; o } o� Z F- �a } Zof 0 oIn W } Q W J LL z Q 0 W In 0 0- 0 w CL N CD .R V wIn0 a�v C L In 1 C � W IA N M C moRI; O G. In3 D U m Q �2: C� 01111111! 0 z aft; o } o� Z F- �a } Zof 0 oIn W } Q W J LL z Q 0 W In 0 0- 0 w CL N CD .R V wIn0 a�v C L In 1 C � W IA N M C moRI; O G. In3 D U m Q �2: C� 0 z aft; o } o� Z F- �a } Zof 0 oIn W } Q W J LL z Q 0 W In 0 0- 0 w CL N CD w Z O W � O O Q D U m Q 0 z aft; o } o� Z F- �a } Zof 0 oIn W } Q W J LL z Q 0 W In 0 0- 0 w CL N CD LEGEND -www-PROPOSED STORMSEWER _-PROPERTY LINE - Iw - RIGHT OF WAY ------GAS LINE -w-w-UNDERGROUND ELECTRIC -a-w-OVERHEAD ELECTRIC - w- K -UNDERGROUND TELECOM - v - - EXISTING STORMSEW ER -» -» - EXISTING 6" DRAINTILE (APPROX) -( -I -WATERMAIN -> -> -SANITARY SEWER EASEMENT EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED CONTOUR (2 -FT) ----- PROPOSED CONTOUR (1 -FT) - �- �- SILT FENCE - �- �- BIO LOG TURF REINFORCEMENT MAT (2760 FT2) -FLOW PATH Im DRAINAGE ARROW D4 HYDRANT GATE VALVE WATER BOX NOTE: UTILITY SHOWN BASED Olt APPROXIMATE LOCATION FROM IANDOWNER, 0011MROWS RESPONSIBILITY TO LOCATE INILITIES PIIIORTO CONSTRUCTI011. UTILITY NOTES: 1. REFER TO COVER SHEET FOR GENERAL NOTES AND UTILITY NOTES. 2. STORMTECH INSTALLATION IS SHOWN HERE IN PLAN VIEW FOR LOCATION AND CONNECTION TO STORMWATER MANHOLES AND CATCHBASINS. OWNER WILL STAKE EASEMENTS. 3. SEE STORMTECH SUPPLEMENTAL INFORMATION FOR CB AND MH SHOP DRAWINGS, MANIFOLD AND CHAMBER CONFIGURATION. 4. ALL STORM DRAIN INLETS MUST BE PROTECTED BY BMPS DURING CONSTRUCTION UNTIL STABILIZATION IS COMPLETE. 5. PIPE OUTLETS MUST HAVE RIPRAP IN PLACE WITHIN 24 HOURS OF OR PRIOR TO CONNECTION TO THE STORMTECH SYSTEM. GRADING NOTES: 1. PROPOSED SPOT ELEVATIONS AND CONTOURS ARE TOP OF GRADE, PAVEMENT OR GUTTERLINE, UNLESS OTHERWISE SPECIFIED. 2. SEE DRAWING NO.2 FOR EROSION AND SEDIMENT CONTROL PLANS. 3. CONTRACTOR WILL COMPLETE GRADING OF DISTURBED AREAS WITH A MINIMUM OF SIX (6) INCHES OF TOPSOIL, REPLACED FROM ON SITE STOCKPILES OF TOPSOIL OR WITH TOPSOIL BORROW. TOPSOIL BORROW WILL CONTAIN 3% TO 10% ORGANICS. DISTURBED AREAS WILL BE REVEGETATED WITH SOD, BY OTHERS. INV. 929.7 NOTE: A PORTION OF THE ADJOINING HOUSE LOCATION TAKEN FROM A SURVEY r BY CARDARELLE DATED 3-18-18. I E0 �\ \ SECURE BIOLOG AROUND DOMED INLET GRATE.. .'.'.'.'.'i UNTILSITEISSTABILIZED - �Jtl CB -02 ... TOP --943.00 (INLET ELEV.) �- BOT=939.10 INV. S-94 . .. . .. INV. E-90.10 5(OUT) / \ ' •' ' ' INCLUDES DOMED INLET GRATE . ... ....... \ ..... ..`� ..... .... .�... r s. . y•. y ... .. _ �.t V_ 1 _ 2 . .. 03 -S-1i LEARANCE IS - INSULATE IF LESS THAN 12' z l 1 i FIVE 6' DRAIN TILE LINES \ IN SINGLE TRENCH, END POINT IS APPROXIMATE �. % H 0 T 1 0 20 40 ' ( SILT FENCE @ 810 LOG \ Feet $'APART CATCH2.51N 945 . . INV. E=9 " . I 1 I TOP E1 1Y \ p =943t. -''''77' • _ • 1 I 1 INV. =936.3 • L • I" • " • " .. ,/\/ t ...INV. 936.0 . 1. .I, ` INV. 929.8 • I .( ' 1 INV. 942.6 •22'.CMPK • . • " . " • " • • " • " • •� ' NO INV. ON FF54 J 1 i P . . . . . . . . . . x�� PER WNER. }32-,- I / ��• i' UNDERGROUND 4 T" �A TELEPHONE CAN BE ABANDONED FOR RIPRAP AT \ ' 05 CULVERT END 781E S' SINGLE WALL 1 CORRUGATED HDPE STORM .. DRAINTF E FOR SAND FILTER / LAYER (SEE DRAWING FILTER 90 I - - ° BEND 03 FOR INSULATION i ' • . 1 / FES INV. 937.9 jj0� DRAINAGE & UTILITY EASEMENTS 12' HDI •tel . � F 15 LF 8° N12 STOR I amu• �'� :--�-•d' OVERFLOW 6 UNOE0.Dw11 FUR j�-1/�. / PR( \� 1 DRI' -ii MANIFOLD FIVEI 6" DRAIN TILE ` INTO ONE 8' AND TRAN5ITION 01 TO 8° N12 PIPE TO MH -01 , ggCX , (.LYE) PROPOSED 16, 336Fr- E X I S T�f V G (COLLECTS ALL ROOF DRAIN TILE) 16.336 ' AREA =S - �� ` TOP=950.0 \\8OT=9ao.o N H O U � 12' ADD•A-BRANCH INV. W=941.1 MIN 0 (DTII) (IN) // ,\\ B' INV. =941. al-00411M � MH -D4 TOP=945.9 BOT -936.9 INV. W=939.55 (IN) _ INV. NW -939.0 (IN) UNDERDRAIN • INV. N-938.9 (OUT) 4' ORIFICE -939.2 WEIR=941.5 I....I 1 MH -05 , 01 FOR STORMTECH TOP=947.8 I 04 CROSS SECTION BOT=937.5 LIMITS OF BED INV• W=939.5 (IN) 94'X22' STORMTECH BED I FOOT OFFSET FROM ' UTILITY EASEMENT NO. 1024262 .......... I .......... ..... PROPOSED "..'.''...:._..:.;. �0 1 DRAINAGE & UTILITY EASEMENTS EXISTING - TNH=(949.73) CONTRACTOR TO VERIFY LOCATION OF WATER FORCEMAM PRIOR TO INSTALLING STORMTECH SYSTEM, ADDRESS ANY CONFLICTS IN ADVANCE. UTILITY EASEMENT PER DOC. NO. 1024262 10' MINIMUM CLEARANCE BETWEEN STORMTECH BED 8 WATER LINE >t E In z D 0 j z w V (� �0 C TOP -946.00, O 'BOT -9 37.50 INV. W=939.60 (IN) INV. E=939.50 �w (OUT) INV 5=940.88 (011f) / / / I 30' MINIMUM CLEARANCE BETWEEN STORMTECH BED B. SANITARY SERVICE j�-1/�. / PR( \� 1 DRI' -ii MANIFOLD FIVEI 6" DRAIN TILE ` INTO ONE 8' AND TRAN5ITION 01 TO 8° N12 PIPE TO MH -01 , ggCX , (.LYE) PROPOSED 16, 336Fr- E X I S T�f V G (COLLECTS ALL ROOF DRAIN TILE) 16.336 ' AREA =S - �� ` TOP=950.0 \\8OT=9ao.o N H O U � 12' ADD•A-BRANCH INV. W=941.1 MIN 0 (DTII) (IN) // ,\\ B' INV. =941. al-00411M � MH -D4 TOP=945.9 BOT -936.9 INV. W=939.55 (IN) _ INV. NW -939.0 (IN) UNDERDRAIN • INV. N-938.9 (OUT) 4' ORIFICE -939.2 WEIR=941.5 I....I 1 MH -05 , 01 FOR STORMTECH TOP=947.8 I 04 CROSS SECTION BOT=937.5 LIMITS OF BED INV• W=939.5 (IN) 94'X22' STORMTECH BED I FOOT OFFSET FROM ' UTILITY EASEMENT NO. 1024262 .......... I .......... ..... PROPOSED "..'.''...:._..:.;. �0 1 DRAINAGE & UTILITY EASEMENTS EXISTING - TNH=(949.73) CONTRACTOR TO VERIFY LOCATION OF WATER FORCEMAM PRIOR TO INSTALLING STORMTECH SYSTEM, ADDRESS ANY CONFLICTS IN ADVANCE. UTILITY EASEMENT PER DOC. NO. 1024262 10' MINIMUM CLEARANCE BETWEEN STORMTECH BED 8 WATER LINE 0 Z) O W LLI � W 0 Lu Zw �Q Lu} J L1' Z O 0 cf) >t E In z D 0 j z w V (� �0 C a ;C �- G !4 M 3 �w N'1c^3 4 a �� 7- 0 11111111! R w U 0 Z) O W LLI � W 0 Lu Zw �Q Lu} J L1' Z O 0 cf) >t E In z D 0 j z w V (� �0 C a ;C �- G !4 M 3 �w N'1c^3 4 a �� 7- 0 Z) O W LLI � W 0 Lu Zw �Q Lu} J L1' Z O 0 cf) z z z O < m 4 a 0 Z) O W LLI � W 0 Lu Zw �Q Lu} J L1' Z O 0 cf) z z z O o o F- 0 O R w U o 0 z W w �¢ �0w z � IL 0 S` o (L U) a PERIMETER STONE EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) 12" (300 m NOTES: STORMTECH SC -740 CHAMBER SYSTEMS CROSS SECTION ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS :-740 )CAP 4" SINGLE WALL CORRUGATED PERFORATED, HDPE PIPE WITH SOCK NOTE 1: THE EFFECTIVE DISCHARGE ELEVATION FOR THE GALLERY IS 939.20' OR THE ELEVATION OF THE ORIFICE IN MH -04. PER HYDROCAD, THIS IS THE EFFECTIVE OUTLET ELEVATION, EXCLUDING EXFILTRATION. SUBGRADE SOILS NOT TO SCALE O TOP OF FILL: 944.0 MIN., 950.0 MAX. PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) 'TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNFAVED , " ` 4 8' INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR 942, 5 181, INCREASE COVER TO 24 (600 mm). ice; (2.4 m) (450 mm) MIN* MAX 'a ` 6" (150 mm) MIN n� t 942.00 30" PEAK \ ® (760 mm) 941.23 6' �--- 51" (1295 mm) (150 mm) MIN 939.50 939.00 L DEPTH OF STONE TO BE DETERMINED BY SITE DESIGN ENGINEER 6" (150 mm) MIN 1L i 1- 938.00 12" (300 mm) TYP 6" UNDERDRAIN FOR ROCK MATERIAL DESCRIPTIONS: A. FOUNDATION STONE - CLEAN, CRUSHED, ANGULAR STONE. B. EMBEDMENT STONE - CLEAN CRUSHED ANGULAR STONE. C. INITIAL FILL - GRANULAR WELL -GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR PROCESSES AGGREGATE. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS LAYER. MATERIAL SPECIFICATION: D. FINAL FILL - 6' TOPSOIL, WITH 3% TO 10% ORGANICS. E. SAND FILTER LAYER - CLEAN SAND, FILL ONE FOOT BELOW FOUNDATION OF STONE. MNDOT CLASS 3 DRAINABLE BASE AGGREGATE. ROLL TO ACHIEVE FLAT SURFACE FOR GEOTEXTILE. 0 0 z 02 Ow C7 } w� w 0ll� Z DQ r J wz 0 D w I � U U) J_ Q w w 0 It 0 W w a O a n Q O U m Q 0 z 02 Ow C7 } w� w 0ll� Z DQ r J wz 0 D w I � U U) J_ Q w w 0 It 0 PIPE MATERIAL AS SPECIFIED GRANULAR FOUNDATION BEDDING & ENCASEMENT, SELECT GRANULAR MATERIAL OR SAND, GP, SW, SP PER ASTM D2487 2" POLYSTYRENE, 10' CENTERED ON F EXISTING FM COMPACTED BACKFILL, 9S% STANDARD PROCTOR DENSITY PER ASTM D698 j\\ F-- 12" MIN //j A OD + 24" MAX NON-RIDGID STORM SEWER TRENCH01 NOT TO SCALE 0S 1'!.7lWNII!.7410RN NSULATION REQUIRED F CLEARANCE IS 12" )R LESS INSULATION CROSS SECTION pZ NOT TO SCALE OS 6" SINGLE W. CORRUGATED HI DISCHAF 2" POLYSTYRENE " SINGLE WALL HDPE ORRUGATED DISCHARGE 10' VVATERMAIN VIDTH OF ENCH BASE INSULATION PLAN VIEW03 NOT TO SCALE 05 CA ti NOTES SEE TABLE •' MINIMUM DEPTH SECTION B -B B IIPRAP SECTION A -A ILC FABRIC, PER SPEC 3733; THE FABRIC SHOULD COVER THE AREA OF THE RIPRAP AND EXTEND UNDER THE CULVERT APRON THREE FEET OPTIONAL: REPLACE 6 -INCH FES WITH ANIMAL GUARD OVER END OF PIPE. 1. REFER TO CROSS SECTION A -A FOR 8" PIPE DISCHARGE, AND USE L=8. 2. REFER TO CROSS SECTION C -C FOR 6" PIPE DISCHARGE, AND USE L=5. 3. USE RIPRAP CLASS II FOR BOTH OUTLETS. 4. DETAILS BASED ON CITY OF ORONO PLATE NO. ERO-060. SECTION C -C GEOTEXTILE FABRIC, PER SPEC 3733; THE FABRIC SHOULD COVER THE AREA OF THE RIPRAP AND EXTEND UNDER THE CULVERT APRON 3 FEET " Ln o o CLASS 1 d50=6" CLASS III 60=9" CLASS IV d50=12" DIA OF ROUND PIPE IN L FT 12" DEPTH RIPRAP CU YD 18" DEPTH RIPRAP CU YD 24" DEPTH RIPRAP CU YD 4`.W �3 �m 3 �� Q 18 10 4.3 6.4 8.5 �11���111 --UT.- 36 1 16 1 10.6 15.821.1 SECTION A -A ILC FABRIC, PER SPEC 3733; THE FABRIC SHOULD COVER THE AREA OF THE RIPRAP AND EXTEND UNDER THE CULVERT APRON THREE FEET OPTIONAL: REPLACE 6 -INCH FES WITH ANIMAL GUARD OVER END OF PIPE. 1. REFER TO CROSS SECTION A -A FOR 8" PIPE DISCHARGE, AND USE L=8. 2. REFER TO CROSS SECTION C -C FOR 6" PIPE DISCHARGE, AND USE L=5. 3. USE RIPRAP CLASS II FOR BOTH OUTLETS. 4. DETAILS BASED ON CITY OF ORONO PLATE NO. ERO-060. SECTION C -C GEOTEXTILE FABRIC, PER SPEC 3733; THE FABRIC SHOULD COVER THE AREA OF THE RIPRAP AND EXTEND UNDER THE CULVERT APRON 3 FEET �! ,cID `L zLn E Q1 " Ln o o �C ¢Zvc 1 A o z w K aM 3 4`.W �3 �m 3 �� Q �11���111 �! ,cID `L zLn E Q1 " Ln o o �C ¢Zvc c•� A o z w K aM 3 4`.W �3 �m 3 �� Q 0 z Z)ill; Ow �U) c� } LuU w) zw �F- J Y � z0 0U) Lo 0 RIPRAP AT CULVERT END 04 w < w � NOT TO SCALE 5 J z Q W Q 0 U 0 o z w o a O n O Q U m Q 0 z Z)ill; Ow �U) c� } LuU w) zw �F- J Y � z0 0U) Lo 0 RIPRAP AT CULVERT END 04 w < w � NOT TO SCALE 5 J z Q W Q 0 U 0