Loading...
HomeMy WebLinkAboutP19-000050 - plumbing (master bath remodel)PERMIT PROJECT FILE #: 19-000258 1480 GREEN TREES RD WAYZATA MN 55391 MASTER BATHROOM AND POWER BATHROOM REMODEL  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Rough In   Assign To Permit #: P19-000050 Master bathroom and po... Created On 03/19/2019 by Anne Hentges Notes DATES Date 03/20/2019    From 3: 00  PM To 3: 30  PM Completion Date 03/20/2019 Status Correct Work & Proceed #STATUS COMMENTS   INSPECTION COMMENTS  0 Remodel MB. DWV PVC sch 40 tied to existing PVC sch 40. Raise trap arm for powder bath with PVC sch 40 toeing to existing PVC sch 40. 1. Provide drainage cross for connecting two lavs. Correct and will check correction at framing inspection. Framing contractor to repair previously cut oor Joist. Jim H.  PERMIT PROJECT FILE #: 19-000258 1480 GREEN TREES RD WAYZATA MN 55391 MASTER BATHROOM AND POWER BATHROOM REMODEL  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Final   Assign To Permit #: P19-000050 Master bathroom and po... Created On 05/10/2019 by Anne Hentges Notes DATES Date 05/28/2019    From 1: 00  PM To 1: 30  PM Completion Date 05/28/2019 Status Permit Finaled  Erosion Control Checked, Found Compliant #STATUS COMMENTS   INSPECTION COMMENTS  0 Master bath and powder room remodel. Fixtures are set. Finish sealing xtures. 1. Provide manufactures specs for handheld shower faucet for factory installed V.B. If not factory installed, contractor will provide. Correct and permit naled. Jim H. 