Loading...
HomeMy WebLinkAboutP19-000031 - plumbingPERMIT PROJECT FILE #: 18-001222 1385 ARBOR ST WAYZATA MN 55391 INSTAL NEW WINDOWS. WILL REMODEL THE KITCHEN. ADD A SECOND BATHROOM. ADD A 12X15 ADDITION  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Rough In   Assign To Permit #: P19-000031 whole house remodel  Created On 02/22/2019 by Anne Hentges Notes DATES Date 02/28/2019    From 2: 30  PM To 3: 00  PM Completion Date 02/28/2019 Status Inspection Passed: Proceed #STATUS COMMENTS    INSPECTION COMMENTS  100 DWV PVC Schedule #40 to ABS with mission bands pex waterlines Jason R. 102 5# air test holding  PERMIT PROJECT FILE #: 18-001222 1385 ARBOR ST WAYZATA MN 55391 INSTAL NEW WINDOWS. WILL REMODEL THE KITCHEN. ADD A SECOND BATHROOM. ADD A 12X15 ADDITION  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Final   Assign To Permit #: P19-000031 whole house remodel  Created On 08/06/2019 by Nola Dickhausen Notes DATES Date 08/09/2019    From 1: 00  PM To 1: 30  PM Completion Date 08/09/2019 Status Inspection Passed: Proceed  Erosion Control Checked, Found Compliant #STATUS COMMENTS    INSPECTION COMMENTS  0 Faucet in main bath, seal toilets 100 Manometer holding  PERMIT PROJECT FILE #: 18-001222 1385 ARBOR ST WAYZATA MN 55391 INSTAL NEW WINDOWS. WILL REMODEL THE KITCHEN. ADD A SECOND BATHROOM. ADD A 12X15 ADDITION  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Final   Assign To Permit #: P19-000031 whole house remodel  Created On 01/24/2020 by Anne Hentges Notes DATES Date 01/27/2020    From 9: 15  AM To 9: 45  AM Completion Date 01/27/2020 Status Permit Finaled  Erosion Control Checked, Found Compliant #STATUS COMMENTS     INSPECTION COMMENTS  0 Complete Fixtures sealed, venting looks good. nal permit 1 Complete Faucet in main bath, seal toilets 2 Complete Manometer holding 