HomeMy WebLinkAboutP18-000134 - plumbing for master bathPERMIT PROJECT
FILE #: 18-001097
1150 WILLOW DR WAYZATA MN 55391
PLUMBING FOR MASTER BATH REMOEL
INSPECTION INFORMATION
Department
Community Development
Inspection Type
Plumbing - Rough In
Assign To
Permit #:
P18-000134 plumbing for master ba...
Created On
10/08/2018 by Anne Hentges
Notes
Paul 612-750-0278
DATES
Date
10/09/2018
From
2: 00 PM
To
2: 30 PM
Completion Date
10/09/2018
Status
Correct Work & Proceed
#STATUS COMMENTS
INSPECTION COMMENTS
0 Visual for remodel of master bath with water closet, lav., and shower. Drain waste and vent this PVC
schedule 40 tied to existing PVC schedule 40. Vent will tie into existing 3 inch vent after the wall is built.
OK to cover after venting connected. Pex waterlines provided. Jim H.
PERMIT PROJECT
FILE #: 18-001097
1150 WILLOW DR WAYZATA MN 55391
PLUMBING FOR MASTER BATH REMOEL
INSPECTION INFORMATION
Department
Community Development
Inspection Type
Plumbing - Rough In
Assign To
Permit #:
P18-000134 plumbing for master ba...
Created On
10/15/2018 by Nola Dickhausen
Notes
Venting
DATES
Date
10/16/2018
From
10: 30 AM
To
11: 00 AM
Completion Date
10/16/2018
Status
Correct Work & Proceed
#STATUS COMMENTS
INSPECTION COMMENTS
0 Venting connected and through roof at this time. 1. Provide nail plates top and bottom plates.2. Seal
abandoned plumbing vent. Rest of plumbing rough in is OK, correct and OK to continue. Jim H.
PERMIT PROJECT
FILE #: 18-001097
1150 WILLOW DR WAYZATA MN 55391
PLUMBING FOR MASTER BATH REMOEL
INSPECTION INFORMATION
Department
Community Development
Inspection Type
Plumbing - Final
Assign To
Permit #:
P18-000134 plumbing for master ba...
Created On
10/31/2018 by Anne Hentges
Notes
DATES
Date
11/05/2018
From
11: 00 AM
To
11: 30 AM
Completion Date
11/05/2018
Status
Permit Finaled
Erosion Control Checked, Found Compliant
#STATUS COMMENTS
INSPECTION COMMENTS
0 Fixtures for bathroom remodel are set and sealed. All work complete, permit