Loading...
HomeMy WebLinkAboutP18-000115 - plumbingPERMIT PROJECT FILE #: 18-000970 4075 HIGHWOOD RD MOUND MN 55364 SUPPLY AND INSTALL PLUMBING FIXTURES @ KITCHEN, PBATH, MASTER BATH, LAUNDRY, (2)2ND FLOOR 3/4 BATH, MECH ROOM  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Rough In   Assign To Permit #: P18-000115 Supply and install plu... Created On 10/11/2018 by Anne Hentges Notes Plumbing underground DATES Date 10/12/2018    From 1: 30  PM To 2: 00  PM Completion Date 10/12/2018 Status Inspection Passed: Proceed #STATUS COMMENTS  INSPECTION COMMENTS   PERMIT PROJECT FILE #: 18-000970 4075 HIGHWOOD RD MOUND MN 55364 SUPPLY AND INSTALL PLUMBING FIXTURES @ KITCHEN, PBATH, MASTER BATH, LAUNDRY, (2)2ND FLOOR 3/4 BATH, MECH ROOM  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Rough In   Assign To Permit #: P18-000115 Supply and install plu... Created On 11/19/2018 by Anne Hentges Notes DATES Date 11/19/2018    From 1: 00  PM To 1: 30  PM Completion Date 11/19/2018 Status Correct Work & Proceed #STATUS COMMENTS   INSPECTION COMMENTS  0 Drain waste and vent is PVC schedule 40. 5 pound air test is holding. Finish nail plates and insulating all waterlines. 2. Insulate radon vent in attic, correct an OK to continue. Jim H.  PERMIT PROJECT FILE #: 18-000970 4075 HIGHWOOD RD MOUND MN 55364 SUPPLY AND INSTALL PLUMBING FIXTURES @ KITCHEN, PBATH, MASTER BATH, LAUNDRY, (2)2ND FLOOR 3/4 BATH, MECH ROOM  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Rough In   Assign To Permit #: P18-000115 Supply and install plu... Created On 02/04/2019 by Anne Hentges Notes Garage PERMIT PROJECT FILE #: 18-000970 4075 HIGHWOOD RD MOUND MN 55364 SUPPLY AND INSTALL PLUMBING FIXTURES @ KITCHEN, PBATH, MASTER BATH, LAUNDRY, (2)2ND FLOOR 3/4 BATH, MECH ROOM  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Final   Assign To Permit #: P18-000115 Supply and install plu... Created On 06/03/2019 by Anne Hentges Notes DATES Date 06/04/2019    From 9: 15  AM To 9: 45  AM Completion Date 06/04/2019 Status Permit Finaled  Erosion Control Checked, Found Compliant #STATUS COMMENTS   INSPECTION COMMENTS  0 Plg manometer is holding. Fixtures set and sealed. All work complete for upper two