Loading...
HomeMy WebLinkAboutP18-000103 - plumbingPERMIT PROJECT FILE #: 18-000889 445 SPRING HILL RD WAYZATA MN 55391 KITCHEN REMODEL  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Rough In   Assign To Permit #: P18-000103 Kitchen Remodel  Created On 08/30/2018 by System User Notes DATES Date 09/04/2018    From 2: 30  PM To 3: 00  PM Completion Date 09/04/2018 Status #STATUS COMMENTS   INSPECTION COMMENTS  0 No access for inspection. Plumber will reschedule inspection. Jim H.  PERMIT PROJECT FILE #: 18-000889 445 SPRING HILL RD WAYZATA MN 55391 KITCHEN REMODEL  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Rough In   Assign To Permit #: P18-000103 Kitchen Remodel  Created On 09/18/2018 by Nola Dickhausen Notes DATES Date 09/20/2018    From 3: 00  PM To 3: 30  PM Completion Date 09/20/2018 Status #STATUS COMMENTS   INSPECTION COMMENTS  0 Schedule 40 ABS DWV to iron pipe w/ mission bands pex and copper waterlines 1. Finish plumbing waterlines to house system. 2. 2? Minimum distance at top and bottom for holes through PERMIT PROJECT FILE #: 18-000889 445 SPRING HILL RD WAYZATA MN 55391 KITCHEN REMODEL  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Rough In   Assign To Permit #: P18-000103 Kitchen Remodel  Created On 10/10/2018 by Anne Hentges Notes re-inspection DATES Date 10/10/2018    From 3: 30  PM To 4: 00  PM Completion Date 10/10/2018 Status #STATUS COMMENTS   INSPECTION COMMENTS  0 Correction provided for all joists drilled for plumbing. Rough in for upstairs bathroom. Drain waste and vent ABS schedule 40 pipe to existing ABS schedule 40 and cast-iron with mission bands. OK to continue. Jim H.  PERMIT PROJECT FILE #: 18-000889 445 SPRING HILL RD WAYZATA MN 55391 KITCHEN REMODEL  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Final   Assign To Permit #: P18-000103 Kitchen Remodel  Created On 12/19/2018 by Anne Hentges Notes DATES Date 12/26/2018    From 8: 30  AM To 9: 00  AM Completion Date 12/26/2018 Status Permit Finaled  Erosion Control Checked, Found Compliant #STATUS COMMENTS   INSPECTION COMMENTS  0 Complete Fixtures set and sealed OK to