Loading...
HomeMy WebLinkAboutP18-000012 - plumbingPERMIT PROJECT FILE #: 18-000222 2837 GOLDENROD WAY LONG LAKE MN 55356 ROUGH AND COMPLETE PLUMBING  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Air Test   Assign To Permit #: P18-000012 Rough and complete plu... Created On 05/31/2018 by Nola Dickhausen Notes SAndy 763-2534788 DATES Date 06/12/2018    From 9: 00  AM To 9: 30  AM Completion Date 06/12/2018 Status Correct Work & Proceed  Erosion Control Checked, Found Compliant #STATUS COMMENTS   INSPECTION COMMENTS  0 Underground drain waste and vent is PVC schedule 40. Backwater valves provided. 5 pound air test is holding. OK to cover. 1. Provide address numbers. Jim H.  PERMIT PROJECT FILE #: 18-000222 2837 GOLDENROD WAY LONG LAKE MN 55356 ROUGH AND COMPLETE PLUMBING  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Rough In   Assign To Permit #: P18-000012 Rough and complete plu... Created On 07/11/2018 by Nola Dickhausen Notes Ryan 612-239-5289 DATES Date 07/12/2018    From 1: 30  PM To 2: 00  PM Completion Date 07/12/2018 Status #STATUS COMMENTS   INSPECTION COMMENTS  0 Schedule 40 PVC drain waste and vent pex waterlines 5 pound air test holding 1.Floor Joists member lands on second PERMIT PROJECT FILE #: 18-000222 2837 GOLDENROD WAY LONG LAKE MN 55356 ROUGH AND COMPLETE PLUMBING  INSPECTION INFORMATION Department Community Development Inspection Type Plumbing - Final   Assign To Permit #: P18-000012 Rough and complete plu... Created On 10/08/2018 by Nola Dickhausen Notes Eric 612-685-8604 DATES Date 10/10/2018    From 11: 30  AM To 12: 00  PM Completion Date 10/10/2018 Status Permit Finaled  Erosion Control Checked, Found Compliant #STATUS COMMENTS   INSPECTION COMMENTS  0 Plumbing manometer is holding. Fixtures are set and sealed. Irrigation vacuum breaker testing and certi