HomeMy WebLinkAboutStop work order DATE TIME
CITY OF ORONO CALLED IN
INSPECTION NOTICE SCHEDULED
PERMIT NO. COMPLETED '�'
ADDRESS �'��� eL?r�cl LS l C-��
OWNER CONTR.
TELEPHONE N0.
� DESCRIPTION ���J� U�CJv��
1y� 01 FOOTING 11 MECHANICAL RI 18 EXCAV/GRADING/FILLII�IG
� 02 FRAMING 13 MECHANICAL FINAL 19 LAKESHORE/WETLANDS
�
O 03 INSULATION 24/25 WOOD BURNER/FIREPLACE 34 TREE REMOVAL
Z 04 WALL BD. 12 WATER HOOK-UP 17 SITE INSPECTION
Q 05 FINAL 14 SEWER HOOK-UP 06 PROGRESS
� 07 DEMO-SITE 27 SEPTIC MAINT. 21 COMPLAINT
� 07 DEMO-FINAL 15 SEPTIC INSTALL. 22 FOLLOW-UP
= 09 PLUMBING RI 23 SEPTIC FINAL 35 HARD COVER REMOVAL
� 10 PLUMBING FINAL 36 FOUNDATION/REMOVAL
� OWNER/CONTRACTOR TO MEET YOU:_YES_NO
� COMME�TS: ,
a � �(� �V' lil, - ,
�
�
� u��� �� � A
�
0
�
� C!'.� � cn�l C.�M �� �
Q
�
Z
W
�
W
�
�
d
W ❑WORKSATISFACTORY:PROCEED ❑ PROJECTCOMPLETE
� ❑CORRECT WORK&PROCEED (1 ISSUE CERTIFICATE OF OCCUPANCY
W
O ❑CORRECT WORK,CALL FOR REINSPECTION TEMPORARY
V BEFORE COVERING PERMANENT
❑CORRECTUNSAFECONDITIONWITHIN HOURS. ❑ pHOTOTAKEN
✓ INSPECTOR WILL RETURN
�STOP ORDER POSTED.CALL INSPECTOR '�CITATION ISSUED
❑ INSPECTION REQUIRED.CALL TO ARRANGE ACCESS.
Call for the next inspection 24 hours in advance. �95Z� Z49-4600
OwnerlContractor o site:'
Inspector.
White Copyllnspector's File Canary CopylSite Notice