Loading...
HomeMy WebLinkAboutMCWD Rip-Rap Permit 21-622 Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information contained in the permit application, correspondence, plans, maps, and all other supporting data submitted by the applicant, and made a part hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant named below for use and development of land in the Minnehaha Creek Watershed District. Issued to: Jeff Mikkelson Permit No: 21-622 Location: 1436 Baldur Park Rd, Orono Purpose: Shoreline and Streambank Stabilization- 52’ Rip-Rap Date of Issuance: 11/16/2021 Date of Expiration: 11/16/2022 By Order of the Board of Managers ____________________________ Will Roach Permitting Assistant This permit is not transferable without District approval, and is valid to the date of expiration. No activity is authorized beyond the expiration date. If the permittee requires more time to complete the project, an application for renewal of the permit must be received by the District at least 30 days before expiration. The applicant is responsible for compliance with all District Rules and for the action of their representatives, contractors, and employees. Conditions: Project to be completed as described in plans submitted to the MCWD office on October 28th, 2021 according to the provisions of this permit. • All equipment intended for use at a project site must be free of prohibited invasive species and aquatic plants prior to being transported into or within the state and placed into state waters • All equipment used in designated infested waters must be adequately decontaminated prior to being transported from the worksite • Properly install and maintain all required erosion control measures until the disturbed areas are re-stabilized • Notify MCWD in writing upon completing installation of perimeter and sedimentation controls • When the site is re-stabilized and the MCWD staff has performed a final inspection, all perimeter control must be removed (Statement concerning fees for inspections, violations, etc... on following page) Inspection/Analysis/Monitoring Fees A site inspection and monitoring by District staff will be performed where the activity involves: • a commercial/industrial/multi-family residential development • a single family residential development greater than 5 acres or of any size if within the Minnehaha Creek subwatershed • any alteration of a floodplain or wetland • dredging within the beds, banks or shores of any protected water or wetland • a violation • any project which in the judgment of the District staff should be inspected due to project location, scope, or construction techniques In these cases, the applicant shall pay to the District a fee equal to the actual costs of field inspection of the work, including investigation of the area affected by the work, analysis of the work, and any subsequent monitoring of the work, which in the case of a violation shall be at least $35. Standard Fee Schedule District professional staff $ 57.74* District interns $ 36.44* District clerical staff $ 42.16* Consulting Senior Engineer $ contracted rate Consulting Engineer/Technician $ contracted rate District Counsel $ contracted rate Application fee $ 10.00 Copy costs $ .25 + actual staff time Color copy costs $ 1.00 + actual staff time * Hourly