Loading...
HomeMy WebLinkAboutSeptic design - 1990 � ' S-P TES TI G, INC. 951 KATYDI� L NE � ST. MICHAEL, MN 5376 497-3566 'b� Steven B. Sch rmers . [�9ay 25 . 1990 Jim Olson � 4360 Bayside Rd. Orono , Henn. Co. , MN This system is Designed for a Type l, �th ee bedroom horre and in accordance with the Minnesota Pollution Control Age cy Chapter 7080 and local ordinances . This site has an existing system with a urface outlet which � s not a legal system and is considerd a failing ystem. The Olsons bought the home in the �'all of 85 ' . This syste would have been illegal at that time also. The soil condidtions wo ld be the same today as in 1985 . The soils on this site are typical of SC soils mapped - KkB - Kilkenny loam. A seasonally high water table was located at 18" , 28" & 30" , (mottled soil ) . Due to the seasonally h gh water table, a Pressurized .� Mound System will need to be installed. The bottom of the rock bed must be located at least 3 ' abov� the se sonally high water table. The soils at a depth of 12" have a perco ation rate averaging 5 . 4 min/inch and are adequate for treating s ptic effluent. A pumping chamber will need to be instal ed to lift the effluent to the treatment area. The existing tanks are a block type & wi 1 need to be replaced. Pump &- fill with soil . � The manifold and supply line pipe must h ve back drainage to the pumping chamber. The distribution pipes shall h ve their ends capped. Be sure the rock and sand fill material are clea . The sod layer below the entire mounded area must be turned over, just break up the sod, be sure not to over work. The power supply and switches must be lo ated outside the manhole and pumping chamber in a weather proof enclosure . A• warning device must be installed with a light and sound device , this is in case of a pump failure. (Mercury floats are a good method) . CONT ' D � Soil and Percolat on Teat: Septic Syatem esign .' • (2) 4360 Bayside Rd. `�. All neighboring wells are located more t an 100 ' away from the proposed treatment area. Keep all heavy equipment off of the prop sed treatment area before and after construction as much as possible . The treatment area should be marked off before construction. With proper �installation and maintenance this system should have no problem in treating septic effluent effe tively. Recommend to pump the septic tank every ear if there is only 1 tank & every 2 years if there are 2 tanks . <-�14-^-- �� � Steven B. Schirmers �s SBS/ds �.—_ —t+` n#� — . CS✓wir�b'�4 THK� "'� . , h�c T'��F=o < 3t C�us-�k�y_ �u,� �y , . x . . x r1 y\ � �ry K.�� . . � �� �� FkL.L- 1-LrcAv�c E441�pM�M1�'� _ . . . . . _ . . _ . . . . •va�. . � �y x � oFFOF�t�}� Pg-�Pos� �C�A-rihF�-�T --�'�----X �X= ;' � .q.R-Eq- '�oQ.E Q Hr�E� G.oNY�'�R+�LTia�.l - . . ,�� ' � . . I � 1 a o��a �{ 3 _ . � - - . . . . . s�P�v u.�E �/ �K PR-vP�OSF'O � TR-Er-r<i-�Fa-'T b P��osEa �m � 44-EY� �� YVMP�Nt, / Q LN A-m p E'Q- ���/ `� �`�ab oo.v� '.. , � ��- ra \ \ '�tSM : 'TOP OF L�RYi4b� _�AVKSNC ��`:':\ r w11�� G.Oh�C._ �� SLf1g F-l.:lOU.00 ^�� y ;i \_,�\. � \ no ��� � � � � ' � ti � �\� . � . , ,�. � � T .. ��� ` T n ' / 4\ . QiaYasc� t i� q.� ' � -C�i�FN�S � +� ,i � ��' Ex�S'�*'b �� e�' �os 6 Percdation Tests Scale� I = 4 U �oNsc 3r gH�� �,�.,� '� � X$oil Borings f ya ,� NA`` �;` �Bc�cF Mork I �� � . � Note= This sysfem is b be constructed 10 meet 1he M�nnesolo Pollu!bn Con�rd Agenq w�e�Y�' � ' �I Chapter 7080 � 7.,oca1 Ordinance � � '� Check all underground utilities� . � i - I � . , - � PROpERTY OF: Si r� �L So N , t�3_(.,o I�S��� e�. --�`" �o►s� r-��,.�. ����,a . co . S-P TEST/NG/NJ�,` — -- — _Hw-`� S�ed- �o — — . Desiqned By' '��^�-�7�1..,r-- Do'e�S/2y/5�D, PH.6i2-497-3566 . . . _� � � � y'•isS , . , �� Q` /D�x�►�� �caG'6s0 V _ ^'J � - . . � � - � � � 2 _ . " -7 - � to o SAvo - � 3•O F��.L'q4.0 3.fe • P��}�.! Vt�v./ NoT-ro�ut�E a'a ��D SET- BACKS �--- �°� ���� ' � � 1 - - HOUSE - System must be� • . Tonk�� irom property lines X- ��-'<�b*a tix�St�� W�v�f�_, �-t- 2i (rom wells a.4 from b!dgs. . . -��;,; , Treotment oreo =frorn lakes,=streoms Treotment orea 3Q from property lines NOTE�Power supply and switches must be bcated in o MaNHo�s .�'�� �r" ��from we!Is weather proof encbwre artside the pumping chomber and manhole . [iyceF�c� �o from bldgs. r—i L'trom irees SOIL BORING ELEVATIONS 1 i r _ .. �� �I �min. , � 1'H.'I EL.-�. . • �"db.su I i e qrode�%TH.�2 EL._�� • Tank Tank TH'3EL-�I.y _Droo to Tank PRESSURE DISTRIBIJ'TION MOUND SYSTEM TH;4 EL-_ � Min,I��io 8� P�mping TH'S EL-_ Mox.l�to4� '� K-�P �ta�..1�G.S SN�A��ovJ Chamber , ELEVATION o1 PROPOSED PUMPING CHAMBER-�9.D Lao.,PaY�P �o.o , 4'to 6��dia.ppe �oe o r Uq�h�E s�aa-�o o.o SYSTEM DESIGN -MOUND -(o p o� a�-.o Tnr�� '1�,� • TYPE-� �BEpFtppM Ayer rcolation rate min./inch(des 83 fl treatment orea I.of dai flaw) '-'RO`'*'o `�'r" " - �o�.�s � � � De .�-�- gn• sq. Per 90 ly sewo9e �-a-CJ I./ x.83 .ft! 0�.�23 s .ft.of lreatmeM oreo�10%=�L.� .ft. (=IOft.width=�fl.knqlh of bed area+side slope run '-�to I x�heiqt�= 3`� ft.xZ 1t.lawn•areo needed) � Clean rock needed- �o sq.ff.treatrt,ent rneo x �L�depth d rock--_i��52cu.ftT 27=�a.yds(3/d�to 2 V�'dio.,indudes 2��of mck obove p'�pe) S�Q''� Clean sand fill below rock needed )U D a.yds. approx. � sondy bam bock fill�w.yds.opprox_, topsoil 6��2_W.yd. .Lur�. Sa�� o�P-c4a 1•3 • WRStY�cO /�Ftn�1¢�D..'CO P��p �,O'lo'TO T�OQSo\4-f9�r \FF�-UJ��3�Slr�4E- C-.!� G�Yo 'R`L41� Number of lanks required�2—, Ist 1onkLQ4�qol.,2ndtonk/aa� qol.rttirmnu �tva PNmP�r.�►-. �-�i-,a.�.,cse� . . Pumpnq chomber capocity-25%of doilysewoqe tbw of`�LZqaI.=lL�qal+reserve staoqe ot 150yn�/B�1 �qal.+pipe bodc 6oiiage- pRppERTY OF� T�r� o�.so�.4 ofL�qal./IOOlin.ft.of �13�d'a.suPdY Pipe, lin.ft.neededi� S�.qol.+moniFoldJ.S�pal./1001nftof3�dio.pipe,fnftneeded2,�_qol. y��D t�A�(5��� e-c� lotol capocity needed s 2�gol.(Plus area for pump) us E r+"r�,1p�.Q_�°+►,�«�p_ � cs�a�1� M�(. N Eia y--1. Q D • Distribution pipe 1��2�db.,LL2�In.ft., ���dia.perforations�,��apart Pump sae��hp. (purnpobk copocilyl��qal.4rydes/day) ya�o 13 ' �+aoo e�e.�ss _o.sc.Hs�u� 3 I �o.l I►,�� $-P TEST/NG /N Nofe� When to�tructinq Ded - , this oreo ahoutl be shoped Note� Distance irom treohnmt orea b �neiqhbor�nq wells- Des�gned By� St^� �•���^-'- v- !,Q-F-�T`�- T1+A-�V I DO ( 9 PH. 612-497-3566 I to divert run-otf from eMering treatment orea. • "" Doie�,S/�/�2, .^LJ � MOUND DESIGN WORKSHEET (For Flows up to 1200 gpd) A. FLOW D-7 Estimated u Sv gpd (see pages D-7 or I-3,4,5 ""'"'*"�'�"�M'��� ,..�d�,� or measured — gpd. .�. i n � a , � � �b .o. . «o � ��. ,,.;,, . .� „� m. B. SEPTIC TANK LIQUID VOLUMES : ,'o ;; ;; "�.; � �� .� � a –i o o � gallons (see pages C-3 or C-5) • �� m � � C-3 C. SOILS (refer to site evaluation) 6lITIC TAlNC CA/AdTlts, NI pAL1,ONt 1. Depth to restricting layer= �� -� 3 0" in es �••M« ••■• •�•°� �.. �,�.u.,�. .,..o..� 2. Depth of percolation tests = ' � � lIl ES �auM •�• �a� 3. Percolation rate .S • ti mpi ��� �«• ��•• �011� l�N �tt� 4. Land slope �. 0 9'0 �,.�. ,... .... D. ROCK LAYER DIMENSIONS 1. Multiply flow rate by 0.83 to obtain required ea of rock layer: A x 0.83 = tiSo gpd x 0.83 sq. ft./gpd = 3'7_� s . ft.-t-►o`�0 4 I D 2. Select width of rock layer (10 feet or less) = o ft. 3. Length of rock layer = area+width= � �- � sq. ft.+ ��ft. = y L.ft. Rock Bed r•t•t f•f•r•r•f•r•r•r•t•t•t• � ti ti ti b•ti 'b•ti•5�•ti•1•ti•ti•ti•ti•ti I� r•r•f•r•�•1�f•r t•t•f•r•t.!•I ti.�•ti•�.ti•ti•ti•ti.ti•�.ti•ti•ti•ti•ti• dth S10ft r•I•r•r•r•r•r•! r•t•t•f•t•f•! ti•ti�ti�ti•ti•ti�ti�ti•ti•ti�ti•b�S�ti•ti• . .f.f.r.�.r.r.�.r.f.�.f.d./.f.r E. ROCK VOLUME �-- �.�+sw 1. Muldply rock area by rock depth to get iub c feet of rock; � �-110 sq. ft. x ,asft. _ �-!3a �tt. ft. 2. Divide cu. ft.by 27 cu. ft./cu. yd. to get cub' yards; y�Q cu. ft. +27=��cu. yd. 3. Multiply cubic yards by 1.4 to get weight of rock in tons; �,cu. yd. x 1.4 ton/cu. yd. _�ton . F. ADSORPTION WIDTH 1. Percolation rate in top 12 inches of soil is� pi E-16 2. Select allowable soil loading rate from table on age E-16; �.....u►«..M,.d«..�...�.�... �� BPd�f� �..' """"�.. IYUMW�M 3. Calculate adsorption width rado by dividing ro layer "�` '"" """ '""" `""`"'"' �'.�i •.1� t.1� 4� I.N loading rate of 1.20 gpd/ft2 by allowable soil lo ing rate; �� ... ..« �.N �.N ..M �� •�� �.M �.M t.N �.N 1.20 gpd/ft2+ .�y gpd/ft2 = /.s � •• ." •." •.,• ,» .." �1 .IN �.N �.M �.N �.M Check this value on page E-16. 4. Multiply adsorption width ratio by rock layer 'dth to get required adsorption width; �,Sa� x �v ft= IS.� ft G�GU � . DOWNSLOPE DIICE WIDTH . If landslope is 3% or more,subtract rock layer width from � adsorption width to obtain minimum downslope di e toe i s ft- 1�_ft =_�_f t . Calculate mound height at edge of rock layer on do slope side; a. Determine depth of clean sand ffi1 at upslope ge of rock �•••*�•.•� layer: Separation �.o feet ��`' b. Multiply rock layer width by landslope to de 'ne drop - in elevation; Slope Difference ••••�••�•�••_•�•�* _,..._.- � v x��%+ 100=�_f t �_• c. Add depth of clean sand depth of clean sand f r separation at downslope edge to depth of r layer to depth of soil bacicfill to get mound height at d wnslope edge of'rock layer; l• (,o ft + l.0 ft+ .S ft+ , S�_ft = . ft d. Enter table on page E-18 with landslope and ownslope dike ratio. Select dike multiplier of e. Multiply dike muldplier by downslope moun height to get downslope dike width: s•�c�x 3, (� = ft g. Compare the�values of step G.1 and Step G.2. Select the greater of the two values as the downslope di e width; 1 � feet ���� h. Calculate upslope dike width using upslope ound height and upslope dike multiplier from pag E-18; � � 3. a X��-�.�ft uP.�am..we�cN i. Total mound width is the sum of upslope dik width plus °o"'"�°Ped�ew1dt c`, rock layer width plus downslope dike width; ��ft +_�ft +�_ft= 3�ft � 3. If landslope is 2.9 percent or less,basal width inclu both the upslope and downslope dike widths. a. Calculate downslope dike width using steps .2.a. through G.2.f; feet b. Calculate upslope dike width using upslope ound height and dike multiplier from Page E-18; x ft= ft c. Add downslope dike width to upslope dike 'dth to rock layer width ft+ ft + ft = ft E-18 �� �� �:1 �1 S1 6.1 7:1 �:1 �:1 S:1 6:1 73 {3 � 0 3A 1� SA �.0 7A �A �A SA iA 7A �A 1 �A1 1.17 S�6 6J! 7S3 2.91 3.55 �96 5.66 6S1 7A1 I 3.19 {36 S56 b.e2 l.1� 2a7 370 1S1 536 6.1� 6.90 3 330 �S1 S.M 732 �J6 1.75 357 �35 SA! S79 i.lS � 3A1 �76 �]S 714 9J! 2.61 IA6 �.17 �.6� SA6 6A6 S 3S3 SAO [67 t57 IQTI 2.61 331 �.00 �.6t 519 S71 i 3.bf S.a6 7.1� 9J6 1207 2S1 31J 3� �A1 �.43 SAI 7 3J0 SS6 769 103� 13.73 2.b 3.12 �70 �.2i �.7'0 S.f3 1 �.�5 SJS !17 1151 1S.f1 2A2 3.m �SJ �.� �.19 �.W 9 �.11 6.?5 9Di I�A1 1l.91 236 2.91 3�LS �.90 �30 �ES 10 {2! bb7 l0A IS.00 ?333 L11 2.l6 733 3.75 �12 �.{4 • Ii �M 7.1� 11.11 17.66 30.{3 2�6 2.7! 313 3b1 3.95 �26 12 �.69 7.b9 1250 21A3 �315 i21 2.70 3.12 3A9 3.l0 4.Os G�LV . PRESSURE DISTRIBUTION SYSTEM 1. Select number of perforated laterals 3 � 2. Select perforation spaang =�_ft. I 3. Since perforations should not be placed closer tha 1 ft. to the edge of the rock layer(see p. E-14), subtract 2 . from the rock layer length. �,, ,�, -2 ft. = 3�,ft. � r� a� 4. Determine the number of spaces between perfora 'ons. Divide the length above by perforation spacing a d round E-17a down to ne�rest whole number. TA F N Head Perforatlon diameter(Inche�) Length perf. spacing = 3�_ft.+ 3 ft. = 1�s aces 7i32 �i4 (3) (2) l.os o.sb oaa �s o.� o.�o 5. Number of perforations is equal to one plus the n mber of 2•°b °.8° �•o� erforation s aces . 2� °�9 �'�� p p 3.0 0.96 ].18 4.0 1.13 1.47 r�.0 1.26 1.65 13 spaces + 1 = �� perforaHons/la�er aUse 1A foot of hesd for raldentlal system�. bUse 2.0 feet of he�d(or otha e�tablishmmb 6. Multiply perforaHons per lateral by number of la erals to get total number of perforadons. E-17b � 3 �� M�i��M.rY�.rl�rie�}�l�Ywlr r�r<IOf ofea�p�Mrf� �.��,. X �rsi,.��,_�_Perforations. ��.�. i ;��n i � 2. ��n zs ia is za 7. Determine required flow rate by multiplyi g 3.o i3 i� 26 number of perforaHons by flow p�r perforation a:o ii is i3 (see page E -17) s.o io ia 22 � x � =31, gpm. , E-15 rwios inue�n oe s ris�t�n�na wv+o/ 'IR' 8: If laterals are connected to header pipe as shown n page E- �. 15, select minimum required lateral diameter fro table on page E-17;enter table with perforation spaang a d number ,,,�''' '�" of perforations per lateral. Select minimum dia ter for �/''� perforated lateral = inches. E-12 - �--�..r.�r�- 9. If perforated lateral system is attached to manifol pipe near ��~`j_ ,� the center, as on page E-12,perforated lateral len th and w number of perforations per lateral will be approx mately one �"`�� � half of that in step 8. Using these values, select inimum _.. . ,�. diameter for perforated lateral from page E-17 as / .�� �� �'''r �� inches. � � -��r A. Dlb4m�te pamp cspadt'�: 1. Minimum sugge�ted is 600 gallons per hour(10 gprn) bo stay oE � , waee�r use rate. L Maxintum su�seed for ddivery b a drop box of a home is 2.700 $�llons Per hour t4S gp�)to pt�event build-up oE prnsure in rop box. 3. U�e value fronn daign of pre�su�diatribution 'ryatea�. SELECTED P[J11�CJ,PACITY�j_Spm p}��,� P�t ot Di�ctise� d.Debaa�l�e btad reqair�tu ' , � q v t. Etevadan diifia�+ae�pump�point of di�charge. ��D� L IE pumpin�to a presut�e distributlon sys�,add �ve ke!for prese�u�e �'o required at a�a�ifold , �_� �iab 3. Fr�etion bss . 13 iac6 2o i�eh 3.o inch � aioi.��.ta�e.t�. a. Enter friCtlor loss tabk wlth Epttt utd pipe diam�eter. 10 0.69 0.20• Re.d friction loes in feet per 100 feec from page R18. 12 0.96 o.2s F.L�=EL/100 h oE pipe - •�4 1.Z3 0.38 : b. Debcmine tOtal pIp!le:lgth Eeom piimp�D dixhat'g�e 16 1.63 0.4a potn� Add?S percent to pipe le�gtll for fltdng l E 2 0 3 0.6 0 toss.or use a Htting taas c1�ut Equivalenc pipe � 3 73 i:ii o:i6 length-1.ZS tlmes ptpe lengtft• �0 s.Z3 1.Ss a.Z3 �v x 1.25�_„(�„_feet 33 7•� 206 0.30 C. Ca1CnLte total friCtion loss atulti i ' 40 11.07 Z64 0.39 bY P Y�8 43 1a.73 3ZE o.a8 Erictfon la�s in k/100 R by equivalent pipe les�gth SO 3.99 O.SB Totil fziction lo�s� •5��,,,x�_+ipp s�_feet 6o s.6o 0 E2 ' 4. Total hesd required is the simt of devation diffe�ce, special had requi:,ements,and roal friction loa � ��+�-+�_ (1) (21 (3v TOTAL HFAD �_fett C. Pump selection 1. A pump must be sdec�ed to ddiver at lmst�_gpm (Step A) ' at least D�� J,�,_Eeet of total heed(Step B). Q*+�*m ecvw�oc �aws � o.LLONs ra orr �.+o� rrre or ��oewuu ecowoa.� t a � a D. Total Pumpont Volnme � 2 ,� �, �� � 1. To ma�dmize pump life select sump siu for 4 to 5 pump operado per day. , ; � � _� „�;,., 4 SO gpd+4= ! 1 � gallons per dose � *� ,� �• �:, Z. �,a�NV��IT1�C 7 IO60 '• i O j p •r 1. Determine total pipe lergth.��feet. • �2O0 •" •o• c•�• 2. Determine liquid wivau of pipe, 10 .Sgsllons per 100 feet. ( page F-18) F-18a � 3. Muldpiy length by voltu� Dninbacic quantity= at.maQ �,�es� c,nom ioo rx! �Eeet x �o•�gallons/loo E�•.�Sallons. 1 4.4 •Su�eated drainb�elc quandty is 10 pereent of pnmpad quantity. A lar6er d 'nbacSc 1.25 7.7•� percenage will dec�w puatp station efliciency slighdy but pumping en cnm are usuaily a rdatively small part of the tonl houxhold energy costs. 1.5 1�.5g 2 17.43 3. Total pump out wlume equals dose volume+drainback 2.S 24.g7 ► � � ons per aose+ �gallons= I 1 S� To Gallong 3 3 8.4 4 66.1 � L�1� CERTIFICATION # 00627 Lo s of Soil Bo in s Location or Project Jim Olson 4360 Ba si e Rd. , Orono ` Borings made by S-P Testin Inc . Stev� S hirmers Date 5-21-90 Classifiction System: AASHU ; USDA-SCS X _; Unified ; Other Auger used (check two) : Hand X , or Powe , Flight , or Bucket X Depth, Boring number 1 D pth, Boring number 2 in • n feet Surface elevation 91 . 5 � f et Surface elevation 93 . 2 �0 � 0 - Topsoil dark brown Topsoil dark brown loam 1 � loam 1 _ o — i� s�� . 2 :.- ' 2 - Dark gray loam 0 - 2 ' 4" 1 ' 8" - .2 ' 4"-MOTTLING 2-1/2 - 2 � 4�� _ 2 ' 10" B�Igam � ay , 3 _ MOT �.�-t�e 3 _ Rusty olive gray clay loam strong Rusty olive brown 2 ' 4" - 3-1/2 ' clay loam 4 - 2 ' 10" - 4 ' 2" 4 - Rusty olive gray loam 5 _ Rusty olive brown I 3-1/2 ' - 5 ' loam 5 - Rusty gray silty loam 5 ' - 5-1/2 ' 6 - 4 � 2�� - 6 � 6 - Rusty 5-1/2 ' - 6 �oli�oamrow 7 - 7 - 8 " 8 - End of boring at 6 � feet. En of boring at 6 � feet. Standing water table: St nding water table: present at 3 � 1�� feet of depth, pr sent at 2 � 10�� feet of depth, 22 hours •after boring. 22 hours after boring. Not present in hole . No present in hole Mottled soil : Mo tled soil : Observed at 2-1 2feet of depth. Ob erved at 2 � q�� feet of depth. Not present in hole No present in hole Comments : Co ments : L-13 CE�TiFICATION N 00627 �ag� �� ���1 ��rin a _ iocation or Project Jim Olson, 4360 Bays�de Rd. , Orono Borings made by g-p Testin Inc. Steve S hirmers _ Date �_�� _q� Classifiction System: AASHU ; USDA-SCS ; Unified ; Other Auger used (check two) : Hand X , or Power , Flight , or Bucket X Depth, Boring number 3 De th, Boring number in i . feet Surface elevation 91• 4 fe t Surface elevation ' 0. � 0 - Topsoil dark brown � _ 8„ loam 1 � Brown clay loam 1 - 8" - 1-1/2 ' -MOTTLIN , 2 _ Rusty olive brown 2 _ clay loam 1-1/2 ' - 2 ' 10" 3 - 3 - � Rusty olive brown 4 - loam 4 _ 5 - 2 � 10�� _ 5 � 2�� 5 - Rust ra ' 2" - 5 ' 4" br wn s ' lt Rusty olive brown loa 6 - - 5 � 4�� _ 6 � 6 - 7 - 7 - 8 " 8 - End of boring at 6 � feet. En of boring at feet. Standing water table: St nding water table: present at 3 � feet of depth, pr sent at feet of depth, 22 hours �after boring. hours after boring. Not present in hole No present in hole Mottled soil : Mo tled soil : Observed at 1-1�2 � Ob erved at feet of de th. f�et of depth. p Not present in hole No present in hole Comments : Co ments : CERT.#00627 � � -..r-..�.., . PERCOLATION TEST ATA SHEET � S-P Testing, Inc. 5-22-90 8 : 14 a.m. , Pet+colation test readings made by on ����g ar p,m, . 4360 Bayside Rd. 1 `�'"� 5-21-90 Test hole locatio� ,Hole numbe ,Date hole was prepared . Depth of hole botto►n 12 �nches,Diameter of hol 6 'nches Soil data from test hole: Depth,inches Soii texture 0 — 12" Topsoil dark hr wn loam Method of scratching sidewal Kni f e Depth of gravel in bottom of hole 2 inches �,., 5-21-90 10 : 00am 12 Date and hour of initial water filliqg ,Depth of initial water �lling inches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at lea t 4 hours A � oma � . G i �hon ,Maximum wate depth above hole bottom ducing tesr 6 �nches Time Percolation Time interval, Measurement, Drop in water rate, Remarks ' minutes inches leve , inches minutes per inch 8 : 04 refill 6 8 : 14 8 : 44 " 5-1 /16 5 . 2 30 min 8 : 49 9 : 19 " 5-1 /16 5 . 3 " " 9 : 20 9 : 50 " 5-1 2 5 . 5 . " " Percolation rate = 5 • 3 minutes per inch. CERT.#00627 � ��� ¢ . PERCOLATION TEST ATA SHEET -ar m:'�, Percolation test readings made by S—P T e s t i n I n c. on 5—2 2—9� �tarting at � : 15 `-p;m , �da.� 4360 Bayside Rd. 2 5-21-90 Test hole locatio� , Hole num ,Date hole was prepare� . Depth of hole bottom 12 inches,Diameter of hol 6 'nches Soil data from test hole: Depth, inches Soil texture � 0 — 12" To soil dark bro loam Method of scratching sidewall Depth of gravel in bottom of h'ole 2 inches ,,,,_J, 5-21-90 �0 • O�am 12 Date and hour of initial water filling p�h o mitial wate filling �nches above hole bottom Method used to maintain at least 12 inches of water depth in hole for at le st 4 hours Automatic s iphon 6 ,Maximur�wat r depth above hole bottom during tes� inches Time Percolation Time interval, Measurement, Dro in water rate, Remarks � minutes inches lev 1,inches minutes per inch 8 : 04 prefill 6 8 : 15 8 : 45 " 5-1 316 5. 2 30 min 8 : 48 9 : 18 " S-7 16 5. 5 " " 9 : 21 9 : 51 " 5-1 4 5. 7 . " " Percolation rate = 5 ' S minutes per inch. . CERT.#00627 ..,.....�...�. � . PERCOLATION TEST ATA SHEET S-P Testin Inc . 5-22-90 8 :16 a:m: Percolation test readings made by g� o� ctarting a� rm��i Test hole location 4 3 6 0 B ay s i de Rd. ,Hole numbe 3 ,Date hole was propare� 5—21—9 0 . Depth of hole bottom 12 inches,Diameter of hol 6 inches Soil data from test hole: Depth,inches Soil texture 0 — 8" To soil dark brow loam 8" — 12." Brown clay loam Method of scratching sidewal Depth of gravel in bottom of hole 2 inches _ ,...�,1, 5-21-90 ]�O: OO�m , 12 Date and hour of initial water filling , pth o imtial water filling inches above hole bottom . Method used to maintain at least 12 inches of water depth in hole for�t le t 4 hours Automa t ie s iphon 6 ,Maximum wate depth above hole bottom during tes� inches Time Percolation Time interval, Measurement, Dro in water rate, Remarks " minutes inches lev ,inches minutes per inch 8 : 04 prefill 6 8 : 16 8 : 46 " 6 5. 0 30 min 8 : 47 9 : 17 " 5-5 8 5. 3 " " 9 : 22 9 : 52 " 5-7 16 5. 5 , " " Porcoladon rate = 5 � 3 n+inutes per inch. I � -PERi=ORATED ..�_ � ' LATERALS � ,,�;!" . :��.. -_-_- _-- __ ._ .!' ' �y� ' --_ - SANOY LOAM SOIL - ,�� �;� , ��� -_ - �`' ,:.r - ___;' :r �, / /, � � _ / '� � • � /;� J �j y��� ��f•/. . LAYER OF STRAW OR `_. . � .�'- °%/���"� / >�' MARSH HAY COVERED `�``; .�"<� �.� ,,�r,�'� /, ' �� � WITH RED ROSIN PAPER / -" '� i / r�� . ,<r�, ,��" ..// �, %'� �� // p ' V 11 II�� /.' �y�/�j� i�,�� � s � oR 2 / : P!PE �'R{�M P#�lv4f' � 'r,-,- '�'- //��. / %'/.y�,�'� // �: ;:' � � `1 /� � � / _ /,- r•' J'� / 'u�� .: II J�� /y,' t / ' / I y / � � � ��� � ,�L� II 3� ., _ 2 ,� ,. . � �i ,- � � ��----'� i; .r CLE4AN F�OCK - .�;" � ",. �� ,� � � - , . , = : ,,, � � , . -. � - � - -' .��� - �,� "°�s' - - ' �� �� � SURFACE WATER �" TOP 501 L� �' ` ,_ = �:.;; ' ��''''�� , � _ f /f � / I. SEI.ECT AS LEVEL A Sf7E AS POSSIBL.E FOR Tl�E �AOIXJD. �' � � � •' 2. REMOVE O(CE55 VEGETATION. PLOw. DISK OR 161NG BACKFiOE RA�FR TEETH. i✓`- ' � ROl1GF1EN TiE SIJRfI�CE SOIL 6 INQiES DEFR DO THIS ONLY IF T?f MOISTURE i j�J /•� i� O D N 7 E N T �S L 6 5 T w W 1 H E P L/I S T I C L J MF T f 5 0 1 L I S P L A S T K �F�T C A N B E fiOILED r. .. -, y � IPRp AN �/b INCH WIRE).DO NOT REMOVE ANY OF THE SURfA� SOIL. MOUND - '� ' ;Ry � � � �' PERFDRMANCE ON CIAY SOIL DEPENOS ON EXTREME CARE lO PRcVENT COMP14CT10N ` r�' i �' ANO PUOOIING OF T}E CIAY OURING CONSTRUCTION.�O NOT USE hEAVY CONS1Rt1C' —,�► �. -.�«� � �� � � /' -�° � � ION EQUIPMENT ANO 00 NOT COf�6TRUCT Tlf MOl1ND MMEN T}fE CLAY SOIL IS •�-�! ��T�s '' y � � ' � W A PLASTIC CONDITION. .,, .'. / ��'�� �'�.:%� � i �. ING 7HE MOUNO 50 1l5 NO"r _�� '� \ C� �3. USE ONLY TRAQ(-TYPE EOUIPMENT F�R CAf�STRUCT '�,`�' � _ ;_ �—g�, ,;- /-! M x ' ' .'•%' � co►.�.�cT n� oRi�� so��. _ _ '--�' � q` 4. TFIERE MUST BE AT LEl�ST 2 FFET OF NAn1RAL OR FlLL SOIL HAViNG A PERCOLA- -- . , —�, •� ` ,��-` � � .��.: T10N RATE NO S�OWER TFi�N 120 MINUTES PER INC}I ANO NO FASTER TFYW 5 �v' • , `~' � � .•%'.; MINUTES PER INCM.BEFD� PI.ACiNG T}E U�EF �� � �' � ���``�� � � +` ' r .�1� - * I"'�+�: 5. T}E 12 INCM LAYER OF QFMI SNJ[' IS PART OF THE MQUI'D COP6TRt1CTION.SI�NU ` /� S h �'�`. o� _ "-� . • _ :•':','','!"" " i IS CONSIDERED QEAN F IT CAN R155 THE�RUIT .L4R TE5T FOR CDNCRETE SMD. C,� �O r`"E • ` ': _ `'' ' • • :�;� ,'' 8, THE TOP OF TFIE CL.EAN SAND LAYER AND 1HE �DP OF 711E ROOc BED htbT 9E SEqN . ._-. _ - _ �,;�\��� � ; � ;. 4��. . :� ��� �. AIv � ��:'�. �`��' 3G�� , `',:s ."�=..•. , 7! DISTRIBUTION PIPES AFtE 1�/2-INCH DIAMETER SPNCED 40 INCHES ON CENTER o _x �-.:�. �. F,�� SOD ` V `�•:.�`... �,[:�.'>. . � ODNNECTED TO 4 MANIFO�.D IN THE CENTER OF THE ROOc Bm. PIPES w►vE ��� -''.� ;="--5: . /-INGI PERFORl1TION5 DRILLED E��ERY 36 INCHES AN� POINT�NG DOWNWARD. e ENq � . J T-�'rr ':.t- �..-_:' . �A NEW DRILL BIT TJ I1v010 BURRS INSIOE T1�E PIPE. ROK YER � ,� - - .. ��_ ���'�'•�B. NINE INCHES OF ROCK ARE PLACED UNOER THE PERFDRATED LATERALS AND 2 Un . ._ .- _�`_ ` INCHES ABOvE FOR A TUTAL fiOCK UEPTM OF 12 INCHES. * �9. THE ROCK IS FIRST COVERED WITH A LAYER OF HAY OR STRAM� �MHICH 5 1}1EN ` •i--__ COVERED M�ITM 4 LAYER OF RED ROSIN PAPER IAFPED 6 INCN6 AT THE SEAMS. N�T ' ��10. AT l�AST$INCHES OF LOAMY SAND SFi0UL0 BE PLACED OVER THE 7DP OF THE • � $ARR�ERRq� � �K eEo. - . �n`'�� I�. A frINCH LAYER Of TOP SOIL SHWLO BE PLACED OVER THE ENTIRE MOUN� 50 ��J THAT A C�A55 COVER CAN 8E ESTABUSHED. �12 �THE ROCX LCAYER 50 THATTHEAVY RANNWIl1.E�7UN�OFf.�F TME MOUND 13. SiDE SWPES OF THE OfKES SMOUtD BE NO STEEPER THAN 4+1 ON CLAY 501�5 AND 3�1 ON SANDY SO�LS. M.- OFF�NaS ON TME�MOVNL OF_DAtLY f). 15. MAXIktUM EFFLUENT DOSE PER PUMP CYCLE SHOULD BE NO MORE THE TA9lE . VAWES. ' 16. MINIMUM PUMPING RATE IS SHOWN IN TABLE. PUMPING HEAD MUST BE ' ADEOUATE TO OVERCOME ELEV4TION DIFFERENCE, FRICTION 1.055 PLUS 5 fEET FpR PERFOFtATED IATERALS. • � E-4 • � LAYER OF GEOTEXTII.E LOAMY SAND CAP FAB:IC PERFORATED LATERAL GRASS COVER 6 INCHES CLEAN SANQ F{�L , TOPSOIL �� _� MAXIMUM SLOPE —�- y� ° � 3 TO I � � � C�EAN ROCK 4" ' TOPSOIL P�OWED OR �4 TO 2 '/2 INCHES % SLOPE D�SKED SURFACE , �� SUBSOIL . CROSS SECTIO A - A ' PIPE FROM PUMPING CHAMBER , li � W � � ii r o . .' � �,- - r-1 � ; , I � ; � I �� � PERFORATED ' � � I �' � �ATERALS � � � � � i i � I , - i � � � i ' ; I II , . I I � � . i � � I � 'I ; _ 8ED AREA I � � ' ;Z � ' � � --- � I Z . '---- ' ' I w ' � J ; I � i � -- i i � i i i � � ' � , I i w � w ; I W� : A, i = � = i � - - I � U � V � I - - t Z i Z ' . 20 � � o � o � � 20 . INCHES I � ��a' � INCHES ._ � � � � I ' ' ' I _ , � � � � ._ � � � ' (_'— _. '—� . D�KE �� 10 FEET p I KE — MAX. TOTAL WIDT , . , \` . , . , • . , . i i l • '1 ` , � � ( �� PLAN IEW ; ,I LAYOUT OF FERFGRATED FIf=E L.l�TEf:�kL� FOf� PRESSURE D{STRI3UTIOiJ It� ��fiG`UP�D f�ERFOFl:T�D FLAS i(C PlPE � \� ��% ir�� � _ SF�� �-r , „ ,: �� �d OrJ CEf�li CR. �ErFORATION �FG �'' � IC�J `IZE �:f�'r' BE 3/�E; ����� � �6.µ '/z PE - _ � � . � C R /4„ , �r. ' �� t�i,t:�v►FOLD PIFE PERFOFATIOfJS OfJ BOTTGf�A CF Y``;�,� F�NSTtC PIPE � 4Q�, ��\ — —=� (�LTERNATE LOCATION OF PiPE� FROM Pur�sP) , E(JD CAP 4Q�, � . ��tE��`� � Fc� � �D N �E F � PUMP NG CHAMBER `Eh,GtN OF . � � . END PER�OF�ATION �F A P��f=O��T�D LA���.RAL ��- Gra�s Cover - � � - Topso i I � j � � . . - =�:�':•' �:c�•:•-:-• • �.••:.-_ . . • • c. • - ' • - - . • . . , •�.- :�,: , - ' �,G: - _ ' • • � . • �� ' •`�.' : ' _ . . . _ . . :�:� .�-. � � � . � Layer of Geotexti le �=a�ric Cor layer �������:� : : Loamy Sand Ldyer ��;`� of hay or straw covered with red .�����:�:::_��-_.:�: . . .�. . � � - ros i n a er) - _ -� .. . . . . � - . ` u C _I. c, C, C C� t• ' ��� 4. C . . �.c c.��. . �, . . �. � c.4� c ��`�.�. _ —-- Perfor ted La eral - Perforation Drilled Horizontally ��',��c-4��G• •�� '-' (,.c•�c• c- �. cc e�'• �. <<<. �- ���- <- . ��-<<� � into Cap Near Top �� �. �� (' C: �a� C' �<<.3�4�� Plus ��. At Least 12�� to Edge �c��Drain Field Rock4�G . _ �. ���� ���``�� of Rock � Layer <<.� : ;;�. ,. . .. - : -. : .-� : . -:. . .� . .. . . . .. . . : . .� � � � � � .. . . . . � � . �� �� � � � � " � � Perforations� Located at . � �. Clean Sand La er Bottom of Lateral � . . Y � Original Soil Properly Scarified � r . Before Placing Sand Ldyer . , C ( r . . . t F?EDWOOD, CEDAR OR WATER TIGHT 8� LOCKA�LE ELECTRIC BQX TREATED POST {4 x 4 min) PLUGS OR ELECTRIC CONNECTIONS NSIDE BOX�C C4NNECTlONS MADE 2" PVC CGNDUI�f SCHEDULE 80 -f-- t�1ANHOLE COVER CHAIhED 8� LOCKED 6"SPACE LOOP OF POVJER COF;D FCR � SETTLEM�NT • . . . � SF1�1_ED MANHOLE RINGS FINAL GRADE , ______= -- / % ��, � AT LEA.ST 12�� UNlON B�W GRADE � WIRE FROM POWFR SUPPLY � PIPE IS LAID ON A UN{FORM SLOPE FROM � EATNIENT REA F+ _ � FOR PROPER DRAINBACK SEALED TANK COVER IF PIPE AT TANK MUST BE LOWER THAN UNION TO GET ELE\�ATION FOR DRAINBACK, PLASTIC ROPE OR CHAIN A �/4 INCH WEEP HOLE MUST BE USED . WITH ANCHOR ALARM FLOAT ON SEPARATE WEEP HOLE ELECTRICAL CIRCUIT � NOTES: ELECTRICAL WIRE FROM POWER SUPPLY START LEVEL � MUST NOT RUN OVER ANY TANKS BUT �� MUST BE LAID BESIDE- OTHER TANKS 3��� �� AND MUST BE .PLACED IN CONDUIT ALONG POST - � SHUT-OFF LEVEL� ELECTRICAL CORDS FROM PUMP AND FLOATS MUST BE RUN THROUGH CONDUIT. WIRES CANNOT HAVE GROUND PUMP CONTROL FLOAt CONTACT. 0�� : _ . -0 � � . ., � . 1 . ,�` � jl �i . �� �� PENCIL - _ . _ _ . . � MARKS . . . ;.�. �� �:: � � - :,�,. � . ._:- �� �-. -.- w��-:�;. - _ �. ?�. :,��- ',;. � . � �.; .:�". - 6" / � .� ,', � �,::: . ;, ..,.�,�.;� - � .: � 20" ,> ,� �; � - - . . : ,:;:� -f... �� , � � �� MANHOLE '�� �:. __; II : .. _. �j r , I � �� r • � ' �� .'1 - :-� � � INLET �-= � ^ �� =-�:� s ,..�--�.�t; i� �� �� SCUltl�t_•. �_�_ :,� ii OUT�ET ,y -, `_','`� ^ —� � ��� �. ., - – � �j •.: �� . `�����=,OUTLET LEVEL �� �' i� ' �". ,`- �'+L _ � _ �Y-'�� �i•. ii ' 7'� � •. : 1� - —-- -- —` �;j �j •i: __- SCUM CLEAR SPACE__ �; ;; CLEAN OUT TANK WHEN� :: - - - � -- - -�----� '` - ::;: �' ��q„ I S 3"MOR LESS OR ..: � - -- - :�: B B IS 12 OR LESS -- ; t Ii -- = -- _ -- _ -- .� �L � • ��, . .• . : . ' . . • • . � !� `� • .•� ' � � � � �� BLACK COLOR �'/ �:�:� ' ' �� • � � DISTINGUISHES SLUDGE :�;.;:. : :. - SLUDGE � LAYER FROM LIQUID �V .�,,;�:'�:...'. t... . _ _ . . . __ - � . - :r�� �i ��r;:rs.'i�� =;-' �•. . :;(:: .�:,:.��;�: ' ._�;: :�'r'�: c� � r w �/ . MEASURE SCUM AND SLUDGE ACCUMULATIONS ,� I N THE SEPTiC TANK . *''s '`+ �- '`'r'� � � 'C����b��i. TN�-a �'`'� . 7f�c't'�t.F�7 � 3� ��51�11:— __-r�GH- �� x , r ,c ''`� x r� . . �i � y . . � �-�''��,' ��� 1-a�v�{ �4N�p t��t-�T I . - • - . . �ya.3 . � �y x a • oF�vF�t'2-a-� P�-oPos�C �Ti��-�T � � - - • . . . � . . . � PcPr�- �OP-E � A r�Pr�_l�T'��fC�F+�C-T�o f-! 1'1a D��a t Z � � 3 - - - � � - � _ SaPP�.�t t.1HE � . . � .. . � x _��POS�x> Tg-,�r-�rn�'C Qi _ Pf��osEp m � 4'�'�'s� �r���r+u / ? � LH�-rn Li e'� ���1 �� �,90.8 � ioo.� _ ` +� ��.� � '� �a -rc��.-� : -toP oF �o,-���� - � �o�-�c���` s�$ �ioo.00 _ . .TA4KS � ; � �-�_..\ r y,� � . ��/ � ` B9.D �m \`i _� �\ _ � X ,ry ;: \ iK1. � �\\� ' ' ' i� ,�' � � � / �\ P�oPasc� f'�� q�.� • i � �3, NSa�t) \,,- -«1-t-►1GS �( � , il �,-' �x�sT�*�� � 6 Percdo!ion Tests Scale� � = y U r�� �� �1�� 4oS - �ovsE �s BM�o �� . � X$oit Borings `' ya, ,� �'"`' , � �� �Bc�r►cF; Mork . I �J FAL� � . � � Nofe= This system is fo De constructed Io meet _ ����,,� the Nfnnesolo Poilu!ion Con!ra Aqenq we`� . ' 'I Chapter 7060 & d,ocal Ordinance � � , � , � � '� Check all underground utilitiesi - � - ° � � PRC)�'ERTY .OF: Ti t�, D L S o)-I I • - � ' �(QQ�6�S��� ��, . � 0��►,.1 C� 1�� . \�'E�t-� . C.O . _ S-P T£ST/NG/A�l(��n�^— — — ..$�-�c stb6- �o _ _ Devgned By: �r�'�- � S Do!e��S./Z`i/�� PH.6t2-497-3566 .. . . _� , t y:is5 - . �t 4 Q` �o�,c 4�� F���L -be0 _. ^'1 � ' � — — _ . . ' i . � . � � . . / . -'") - 3.0 '�F�LL'q54 O 3•(e • PL74� �Il�11�I NoT�(D se�+�.F- S.� L�a SET- BACKS . �-- � °( � ��� � �� , HOUSE • System must be� • . Tank�� from property lines �- S�-t t d� t�X�S�� W�o-�� , �-�— � (rom welis �4 trom b'dgs. . . -r'�,,; , � Treatment orea =�fran lokes , .=streoms Treatment oreo 3S2 from property lines N0���`^+� suppiy and switches must be bcoted in a MaNNo�S •►��n t�-" • ��from we!Is weather proof encbwre outside the pumping chomber and manhole . .. � aRcrF�c� �o,'from bldgs. r —� L'from trees SOIL BORING ELEVATIONS , " i �min. . . THAI EL.-� - - ' � �j�'da.su I i e TH.�2 EL.-23-� - . qrode�_% Tank To�k TH"3EL:� _Droa to Tonk PRESSURE DISTRIBIlTION MOUND SYSTEM TH"q EL- . ' Min. I"io 8' � �p�mping TH.`5 EL- Mox.l��104� � �fr�P T�A1.a�GS Sl��A�.�ovJ Chomber , EI.EVAT10N ol PROPOSED PUMPING CHAMBER-.?���-¢o.,Pa*'�P �o .o . �4��to 6��dio.pipe . _ . �04 0�- �p�¢,��E sLt�a -,o� .o SYSTEM DESIGN -MOUND � -T�P o� a,�c� T�-�� 1� , � • TYPE-�, � BEDf�00M , Averoge percolation rote �_min./inch (design.83sq.ft heatment orea per gol. of daily sewoge flaw) `'�o�'�p `�-r �� " - �o".$ - �qal•/doy x.83sq.ft�qa1.�2'i sq.ff.of heatme►� areo �10% = ��-1�sq.ft. (.= IOfl.width=�ff.length of bed area+side slope run.�to I x�heigFd= 3 y N.x �d it,lown•area needed) � Cleon roc:k needed- �� sq.ft.heatrnent areo x �n � depth a�f rocic:�SZcu.ftT27=�a.yds(3/4'�fo 21/�'dia. ,includes 2��of rock cbove p'rpe) S��'�_ Clean sond fill below rock needed 1 y a a.yds. opprox. , sondy loom back fill�a.yds.approx., topsoil 6����2.._W.yd. Av� s�a�.�.�� o�Qt'�a / .3 � . u�ASK� Number of ianks required�_, Ist 1�nklQ�gol. �2ndlmk ��r'—`"''��� "'Co p`�o a,o �o -� -t'oeso„�� ..�������a¢ s�.o4� t r� c��co.-��a�� p /ab L7 �pl.m�YTxmS PLU S P►�m P�ti1 le �-F7 t-1 v►�<,i E� Pumping ctwmbe� capocity- 25% of doily sewoge fbw of y�qa1.=1L�9a1+reserve stanqe of 15 Oyt��/Bl�.�gol.+pipe bodc droinoge- pRppERTY OF: T�r� OLso►..1 of lo.S yol./IOO lin.h.of �1�,,�da. s�PP�Y Pipe, lin.ft needed�� S�qol.i mon�fild.l�qol./IOO Iinft of 3 N d'a.pipe,l"n.ft needed 2��_qal. ,���a �p��,{s��� �c� lotal capocity needed b � O gol.(plus o�ea forpump) usE r,,�r�, laac� o,�,l.c..�p_ � ���}� Mr1 . N�i� . L� o • Disfibution �� ' �� ' " � � PpPe L2 d�a. ,1L2.lin.ft._�dia. perforations�b._ oparf Pump size�hp. (pumpable capociiy 13�qa1.4 qdes/doy) u��0 13 ' N�Ao �-�ss _ o�sc.��i.�� 3 I �ql 1 ►,.,,„. $—P TEST/NG /N . . .. No1e� When co�ln,cting bed - , tnis oreo shoub be shaped Note� Distance from treotrr�ent oreo b �neghbainq wet►s- Desiqned 8y� �f^- ��•�� �"' ��`- to diyert run-otf from entering treotment oreo. � ���T�- �"A'� ��� . 9 PH, 6�2-497-3566 I � . Oote ��/a.�/.� �