HomeMy WebLinkAboutmemo re joist hangers �
Willie Gibbs
From: Willie Anderson [willie@crowmm�.com
Sent: Thursday, August21, 2008 1:26 PM
To: Willie Gibbs
Subject: FW: rezabek
Willie, ,��8
Below is the engineers response to the need for j ist hangers at t e Bayside Road project.
Thank you,
Willie Anderson
The Crown Construction Company, Inc.
willie@crowmm�.com .
612-868-1899
fax - 763-521-4123
-----Original Message-----
From: rvjohn@umn.edu [mailto:rvjohn@umn.edu]
Sent: Saturday, August 09, 2008 1:26 PM
To: Willie Anderson
ubject: Re: rezabe�
Willie:
You will have �o re`resh my memory. I remember we were planning to install double member 2
x 6 collar ties bolted to the rafters at the 9' 1 vel and spaced at 6'-4" o.c.
In that case you would not need joist hangers.
Rollie Johnson, P.E.
I
On Aug 9 2008, Willie Anderson wrote:
>Rollie,
>The Orono inspector wants me to install either a ledger or joist
>hangers at the rafter to ridge board at the Reza ek screen porch.
>We have collar ties so this ridge is not structu al.
>
>Please confirm that I will not need hangers or a ledger at this connection.
>
>Willie Anderson
>The Crown Construction Company, Inc.
>willie@crowmm�.com
>612-868-1899
>fax - 763-521-4123 i
� I
> �
>
No virus found in this incoming message. II
Checked by AVG - http: //www.avg.com
Version: 8.0. 138 / Virus Database: 270. 6.0/1601 - IRelease Date: 8/8/2008 9: 02 AM