HomeMy WebLinkAbout11-22-2021 Council Work Session PacketCouncil Work Session
Monday, November 22, 2021
5:00 P.M.
Orono Council Chambers,
2780 Kelley Parkway, Orono, MN 55356
WORK SESSION
AGENDA
1. 2022 Fee Schedule Discussion
2. Police Chief Update
3. Park Dedication
Council Work Session
Monday, November 22, 2021
5:00 P.M.
Orono Council Chambers,
2780 Kelley Parkway, Orono, MN 55356
Past Meeting Agendas
November 8, 2021
Building Official/ Building Inspector Hire Update
Annual Appointments Discussion
October 25, 2021
CIP Discussion
A. Police Department
B. Parks
C. IT
D. Building
October 11, 2021
Interview Park Commissioner Candidates
Prosecuting Attorney Services Discussion
Annual Discussions Timeframe:
Budget: Part of June, All of July, August and October.
City Administrator & Police Chief Update (3 times per year for 15 minutes)
TO: Mayor Walsh and Council Members
FROM: Ron Olson, Finance Director
DATE: November 22, 2021
SUBJECT: 2022 Fee Schedule
Attachments:
A. 2022 Proposed Fee Schedule
Staff has been working on updates to the current fee schedule. Prior to the adoption of the fee
schedule on December 13, a public hearing will be held.
Proposed Changes by section for the 2022 Fee Schedule are:
Planning and Zoning
• Application Fees - An increase of the base application fee from $275 to $325. This change is
based on an updated analysis of time and expenditures related to processing an application.
• Easement Creation – Add fee and remove reference to “Class I Subdivision”
• Building Permits – Changes recommended by MnSpect.
• Erosion Control Escrow – “Not to Exceed” was added to the amount.
• Demolition: Accessory Structure – Septic System and a $1,000 escrow were added to this fee.
• Annual Septic Fee – Changed from annual to quarterly to reflect change in billing frequency.
• Septic Late Fee – Changed from a flat amount to 3%/Quarter
• Miscellaneous Projects – this section was added to better organize the schedule.
• Fences – This is a new fee.
• Contracted Inspection Service – Removed from the schedule.
• Park Dedication – Staff has prepared a separate analysis of this section for the Council to give
direction on.
Utility Rates and Fees
• Point of Sale – “City Inspection” was added to better clarify City vs Private Inspection.
• Sewer Projects – Connection fees were updated by the interest rate of outstanding assessments.
Projects that the assessments have been paid off have been removed and will be subject the base
connection fee.
• Penalty – Changed from 8% annually to 1% monthly.
• Utility Rates – A separate rate study document will be provided. Based on the 2021 fee schedule
the rate increases would be Water – 3%, Sewer 3%, Storm 1%, and Recycling 4%.
Park Fees
• Golf Course Fees – Price for an Individual decreased from $19.00 to $18.00.
• Language allowing the Superintendent to set pricing for special events.
• Motorized Carts changed from per round to per rider/per round.
• Lurton Park – The cost for a replacement pass has been added.
Police Administration
• A fee for Body Worn Camera videos has been added - $50.00.
Documents
• 2010-2030 Comprehensive Plan is removed
• Municipal Code Book is removed
• Electronic Labels – 8GB removed from size of flash drive
• Surcharge for excess expenses – “Building” add to consultant types.
Staff would like the Council’s input on the recommended fee changes. The Council may also want to
consider additional fees changes that Staff has not recommended.
A. Buillding, Planning, and
Zoning
B. License Fees and
Miscellaneous Charges
C. Utility Rates and Fees D. Administrative Offenses E. Park Fees F. Police Administration G. Documents and Services
Zoning Applications Commercial Marina
Sanitary Sewer and
Municipal Water
Connection
Traffic/ Vehicle Golf Course Dogs at Large Zoning Documents
Zoning Permits Joint Use Dock Municipal Connection Permit Snowmobile Violations Lurton Park Animals at Large General Administrative
Documents
Building Code Administration Rental License Point of Sale Fees Animals Summit Beach Large Assemble Permit
Building Permits Garbage Hauler Sewer Projects Public Nuisances Bederwood & Hackberry
Sport Fields Fireworks
Contractual Inspections Home Occupation Water Connections Open Burning Firearms
Fire Temporary Trailers and
Buildings Water Meter and Horn Noise Trapping
Park Dedication Kennel Licenses Sewer and Water Unit
Adjustment Charges Park Violations Special Events
Storm Water Trunk Beer, Wine, and Liquor Utility Service Fees Sign Violations False Alarm
Amusement Devices Municipal Water Rates Juvenile Violations Fingerprinting
Public Dance Stormwater Utility Rates Seasonal Overweight Vehicles Police Special Services
General Administrative
Licenses/Fines Recycling Charge Parking Copy Service
Miscellaneous Charges Sump Pump Surcharge Miscellaneous Photos
PW supplies and service No Parking Signs
Statements
Fire arm storage
Table of Contents
2022 Orono Fee Schedule
Application 2021 Fee Proposed Fee Escrow Notes
Variance $275.00 $325.00 $700.00 + Consultant fees
1st Extension $50.00 $50.00 Staff approved
2nd and subsequent $50.00 $50.00 City Council meeting
Conditional Use Permit $275.00 $325.00 $700.00 + Consultant fees
CUP amendment $275.00 $325.00 $700.00
1st Extension $50.00 $50.00 Staff approved
Interim Use Permit $275.00 $325.00 $700.00 + Consultant fees
Site Plan Review $275.00 $325.00 $700.00 + Consultant fees
Zoning Amendments including map amendments $275.00 $325.00 $700.00 + Consultant fees
Concept Review $275.00 $325.00
Comprehensive Plan Amendment $275.00 $325.00 $700.00 + Consultant fees
Subdivision
Subdivision: Sketch Plan $275.00 $325.00
Subdivision: Class III Prel Plat $500.00 $500.00 $5,000.00 + Consultant fees
Subdivision: Final Plat $500.00 $500.00 $2,500.00 + Consultant fees
Subdivision: Preliminary plat extension $275.00 $325.00
Subdivision Exception $50.00 $50.00 n/a + Consultant fees if Applicable
Vacations
Vacations: Road $275.00 $325.00 $700.00
Vacation: Easement not associated with
subdivisions $275.00 $325.00 $700.00
Vacation: Easements associated with a subdivision $0.00 $0.00
Easement Creation (see Class I Subdivision)$150.00 $700.00
Appeal of Administrative Decision $150.00 $150.00 $700.00
Stairway to Lake $50.00 $50.00
Structures not requiring a building permit $50.00 $50.00 Plus Engineering Costs
Encroachment Permit/ Agreement $150.00 $150.00
Tree removal in shore setback $0.00 $0.00
Signs (Alteration of cabinent or raceway)$50.00 $50.00
Exhibit A Buillding, Planning, and Zoning
All fees, unless otherwise noted, are application fees and are non-refundable after staff work has begun on the application.
All after the fact applications are double fees. All applicants are responsible for actual costs incurred by the City by its' consultants in the review of the
application.
ZONING PERMIT:
ZONING APPLICATIONS:
PLANNING, BUILDING, ZONING
Application 2021 Fee Proposed Fee Escrow Notes
Vehicle Storage $50.00 $50.00 78-1577 (C)
Land Alteration $50.00 $50.00 $1,000.00 May also require a CUP
Tent/ Canopy Permits $50.00 $50.00
*City Administrator may require an erosion control
escrow for projects disturbing soils or tree
replacement.
$1,000.00 Variable depending on project
scope, but not to exceed
Zoning confirmation letter $50.00 $50.00
Request for zoning confirmation
letter
Address Change Request by Owner $50.00
Address Change Request by Owner $50.00 $50.00 Relocated
Building Permits
Based on Value
Table
Based on Value
Table
Building permit fees (Building, Plumbing,
Mechanical, unless otherwise noted)
Based on 2012
Building Valuation Recommended by BO
Plan Review Fee
65% of Building
Permit Fee
65% of Building
Permit Fee
Additional plan review required by changes,
additions, or revisions to approved plans
minimum one half hour charge (does not apply to
commercial plumbing)
$75.00 / hour
Recommended by BO
Minimum Fee $26.25 $26.25
Moved-In Structure (not including foundation,
interior remodel, etc.)$275.00 $275.00 Recommended by BO
Pre-Move Inspection $165.00 Recommended by BO
Special investigation fee (work started without
obtaining a permit – applies even if no permit is
pulled)
100% of Building
permit fee
Recommended by BO
Manufactured Home Installation $275.00 plus State
Surcharge and requires a regular building permit
if also doing basement, foundation, garage or
entryway, fees are based on sq. ft. State Table
Recommended by BO
Recommended by BO
BUILDING CODE ADMINISTRATION:
Refunds: 80% of building permit fees on projects not yet started (within 90 days of permit
issuance by municipality). No refund on plan review fees, state surcharge or maintenance
permits
Application 2021 Fee Proposed Fee Escrow Notes
City Administrator may require an erosion control
escrow for projects disturbing soils.
Not to Exceed
$1,000
Total Valuation
$1.00 to $500
$501.00 to $2,000.00
$2,001.00 to $25,000.00
$25,001.00 to $50,000.00
$50,001.00 to $100,000.00
$100,001.00 to $500,000.00
$500,001.00 to $1,000,000.00
$1,000,001.00 and up
State Surcharge as required by State
Demolition
Demolition: Principal structure $100.00 $100.00 $1,000.00
Demolition: Accessory structure/Septic system (Per
unit fee)$50.00 $50.00 $1,000.00
Retaining walls
Based on Value
Table
Based on Value
Table $1,000.00
May require City Council
approval (Variance or CUP)
Plumbing
1.25% of project
1.25% of project
value, based on
valuation table n/a
Backflow registration $10.00 $10.00
Plumbing minimum $26.25 $26.25
Fee
$26.25
$26.25 for the first $500.00 plus $3.41 for each additional $100.00, or fraction thereof, to and
including $2,000.00
$6,254.92 for the first $1,000,000.00 plus $4.20 for each additional $1,000.00, or fraction thereof
$77.40 for the first $2,000.00 plus $15.49 for each additional $1,000.00, or fraction thereof, to
and including $25,000.00
$433.67 for the first $25,000.00 plus $11.29 for each additional $1,000.00, or fraction thereof, to
and including $50,000.00
Valuation based on ICC 2012 Building Valuation tables
$715.92 for the first $50,000.00 plus $7.88 for each additional $1,000.00, or fraction thereof, to
and including $100,000.00
$1109.92 for the first $100,000.00 plus $6.30 for each additional $1,000.00, or fraction thereof,
to and including $500,000.00
$3,629.92 for the first $500,000.00 plus $5.25 for each additional $1,000.00, or fraction thereof,
to and including $1,000,000.00
Application 2021 Fee Proposed Fee Escrow Notes
Mechanical (All Types)
1.25% of project
1.25% of project
value, based on
valuation table n/a
Mechanical Minimum $26.25 $26.25
Tent/ Canopy $50.00 $50.00
Municipal Connection permit n/a
Sewer $50.00 $50.00
SAC (Sewer Availability Charge) (MCES)$2,485.00 $2,485.00
Water $50.00 $50.00
Horn Quote Basis Actual Cost See Utility Rate Section
Septic
Residential System Permit, Repair $100.00 $100.00
Residential System Permit, New/ replace $460.00 $460.00 $1,000.00
Non-Residential System Permit $260.00 $260.00
Subdivision site evaluation review $60.00 $60.00 Per lot
Inspection surcharge for RS zones (Big Island and
Deering island)
$30.00 $30.00
plus cost of boat rental if
transportation not provided.
Reinspection fee $30.00 $30.00 plus $60/ hour after 1st hour
Site inspection without permit $30.00 $30.00
Annual Quarterly Septic Fee
$45.00/per year, plus
applicable late fee
plus 8% interest for
unpaid charges
11.25
Reflects current quarterly billing
Move to Utility Fees?
Septic Late Fee $10.00 3%/Qtr
Miscellaneous Projects
Retaining walls requiring building permit
Based on Value
Table
Based on Value
Table $1,000.00
May require City Council
approval (Variance or CUP)
Sign structure
Based on Value
Table
Entrance monuments
Based on Value
Table
Fences
Based on Value
Table
Only required for fences above
7 feet.
Tent/ Canopy 50.00$ $50.00
Application 2021 Fee Proposed Fee Escrow Notes
Temporary Certificate of Occupancy Escrow
$ 10,000.00
3% of project value,
not to exceed
$10,000
Contractural Inspection Service
Monthly Retainer Fee $30/ month $30/ month
(Includes clerical time)
Inspection Charge $30.00 per
inspection
$30.00 per
inspection
Plan Review Charge Per 2008 Building
Permit Fee Based on
Valuation
Per 2012 Building
Permit Fee Based on
Valuation
Clerical Fee (Only charged if clerical use is excessive)$20.00 per hour $20.00 per hour
Fire Protection inspection Actual Cost Actual Cost
Per 2012 Building
Permit Fee Based on
Valuation
Per 2012 Building
Permit Fee Based on
Valuation
Fire Plan review fee 65% of permit fee 65% of permit fee
Burning permits No Charge No Charge
Reinspection $20.00 $50.00
FIRE
All fire suppression and alarm permits are based on
value, and include a plan review fee and are subject to
the state surcharge.
Application 2021 Fee Proposed Fee Escrow Notes
Res. 4738 (12-10-01)
Res. 4739 (12-10-01)
Per new lot, or new
structure on previously
vacant lot
Per buildable acre
$16,150.00
$8,060.00
$5,250.00
$3,025.00
$7,275.00
$8,490.00
$9,690.00
The City Council has established by resolution a minimum residential park fee of $3,250 per dwelling unit and a
maximum of $5,550 per dwelling unit.
Cash Contribution in Lieu of Lands. In those instances where a cash contribution is to be made by the subdivider, in lieu of a conveyance or dedication
of land, the cash contribution to be contributed shall be that would otherwise have been conveyed or dedicated. The City shall account for such funds
inequivalent to the fair market value of the equivalent undeveloped land a special fund named Park Dedication Funds.
The City Council has established by resolution a minimum commercial/industrial park fee of $8,125 per acre and a
maximum of $13,875 per acre.
STORMWATER AND DRAINAGE TRUNK FEES
Storm water trunk fees apply to new development and redevelopment of existing properties and provide funding for the storm water infrastructure
necessary to serve the City. The trunk fee is based on the land use and acreage of the property being developed. An equivalency factor multiplier is
assigned to each land use type, with a 2-acre residential lot considered as the standard in the City with an equivalency factor of 1.0. The table below lists
the storm water trunk fees per acre for the various zoning districts and land uses in the City.
NEW DEVELOPMENT LAND USE
Single Family Residential 5 Acre Zone
Stormwater and Drainage Trunk fees as established by Subdivision IV, Section 14-283 of the City Code.
Single Family Residential 2 Acre Zone
Single Family Residential 1 Acre Zone
Single Family Residential 1/2 Acre Zone
Multi Family Residential 4 Units/Acre or Less
Multi Family Residential Greater than 4 Units/Acre
Commercial or Industrial
Dedication requirement of 8% of the land being platted or subdivided.
(Exclusive of lot that includes an existing residence.)
Dedicated requirement of 8% of the land being platted or subdivided.
Land Dedication Minimum Area - Subdividers shall be required to dedicate to the City for parks, playgrounds, trails, open spaces and other public purposes
as a minimum that percentage of gross land area, or other such amount as may be determined by the City Council, as set forth below:
(1) Residential/Agricultural/Multiple Residential Zoned Land.
(2) Commercial/Industrial Zoned Land.
PARK DEDICATION - See Separate Documentation
Application 2021 Fee Proposed Fee Escrow Notes
- all wetland acreage up to the delineation line
- acreage of stormwater ponding or similar improvements that provide additional treatment benefits beyond what is required to treat the stormwater
runoff from the development site.
- acreage of conservation easements resulting from Conservation Design process
Multi-family and High-Density Single Family Developments. Trunk fee shall be charged on a per-acre basis, except that the following acreages will not be
subject to the trunk fee:
Fee
DOCK LICENSE $325.00 Per Year
License Application Fee $50.00
CANOE RACK RENTAL $40.00 Per Slip
RENTAL LICENSE
License Fee $100.00 2 year term
GARBAGE HAULER LICENSE
Flat Rate $75.00 Ch. 54, Article III
Per Hauler $15.00 Per Truck
Transfer Fee $30.00
HOME OCCUPATION LICENSE (Level 2)$100.00 Initial Review Fee Sec. 26-76
$30.00 Annual Review Fee
$30.00
KENNEL LICENSES Sec. 62-161 thru 62-185
Commercial Application & Inspection Fee (Annual)$150.00
Residential Application & Inspection Fee (Annual)$50.00
BEER, WINE & LIQUOR LICENSES
Initial Investigation $500.00 Per License Ch. 34, Article II
On-Sale & Off-Sale Intoxicating Liquor Licenses Ch. 34, Article II
Ch. 34, Article II
In state investigation
Out state investigation Actual cost
Off-Sale Liquor License $150.00 Sec. 34-66
On-Sale Liquor License $5,000.00 Sec. 34-66
On-Sale Wine License $2,000.00 Sec. 34-77
3.2 % Malt Liquor Off-Sale (Annual)$50.00 Sec. 34-66
3.2 % Malt Liquor On-Sale (Annual)$100.00 Sec. 34-66
Setup (Annual)$100.00 Sec. 34-126; 34-143
Club Liquor License Sec. 34-66
(weekday)$200.00 Sec. 34-66
(Sunday)$200.00 Sec. 34-66
Temporary Set-up Permit (1-4 days)$25.00 Each Sec. 34-42
Temporary On Sale 3.2% Malt Liquor (1-7 days)$25.00 Each Sec. 34-82
Temporary Off-Sale Wine License (wine auction)$25.00 Each Sec. 34-42
Temporary On-Sale Wine License (1-4 days)$25.00 Each Sec. 34-42
Temporary On-Sale Liquor License (1-4 days)$25.00 Each Sec. 34-42
1st Violation $500.00 Sec. 34-41
On-Sale & Off Sale 3.2% Malt Liquor/Wine Licenses
Type
Exhibit B Licenses and Miscellaneous Charges
TEMPORARY TRAILERS & BUILDINGS
License Fees for new licenses may be prorated; after 75% of the license period has elapsed, the fee is reduced by 50%.
Actual cost up to $10,000
Liquor Violations (3 years immediately prior to date of most current violation)
2nd Violation $1,000.00 & 3-day license
suspension
3rd Violation $2,000.00 & 2-week license
suspension
4th Violation License revocation
AMUSEMENT DEVICE LICENSES Sec. 38-601 thru 38-603
Per Establishment (Annual)$100.00 + Machine fee
Per Machine Fee $25.00 Each
PUBLIC DANCE LICENSE
Annual License $100.00
Individual License (Individual Permit)$10.00
Gambling & Raffle Investigation $10.00 Ch. 38, Article II
Massage Therapy License $100.00 Ch. 31, Article II
Background Investigation $150.00
Annual Renewal $100.00
Solicitor/Transient Merchant/Peddler License $100.00 + Actual costs up to
$1,500.00
Ch. 30
Tobacco Licenses $125.00 Ch. 50, Article II
1st Offense $150.00
2nd Offense $400.00
3rd Offense & Over $500.00
Penalty for Use of Tobacco Where Prohibited $100.00 Sec. 51-5
MISCELLANEOUS FEES
Convenience Fee - Credit Card Transactions 2.75%+ $0.50 for $100.00 or less
Returned Check $30.00
Licensee or Employee Violations within 24 month period
GENERAL ADMINISTRATIVE LICENSES/FINES
Sec. 38-501 thru 38-506
Sewer $50.00
SAC (Sewer Availability Charge) (MCES)$2,485.00
Water $50.00
Horn Quote Basis
Connection inspection (Water or Sewer) $100.00
Disconnection inspection (Water or Sewer)$100.00
Residential - City Inspection $250.00
Residential - Private Inspection Review $100.00
Commercial $750.00
Connection to existing City Sewer System: $5,380.00
Fee
2004 North Long Lake East Extension $16,495.00
2004 West Farm/Homestead $9,900.00
2005-1 Webber Hills/S Brown Rd Ext $14,990.00
2005-1 Dickey Lake Dr N $19,125.00
2006-1 Jamestown Road $15,930.00
2007 Farview Lane Sewer $12,025.00 12,775.00$
2010 North Farm Road $20,020.00 21,270.00$
2014 Green Trees $21,830.00 22,800.00$
2015 Green Trees Extension $20,890.00 21,775.00$
Connection to Sewer System in adjacent city
Fee
Connection to Long Lake Sewer System $1,900.00 or per current Long Lake
Fee Schedule
Connection to Wayzata Sewer System $1,000 or per current Wayzata Fee
Schedule
POINT OF SALE SEWER SERVICE INFLOW & INFILTRATION INSPECTION FEES
Exhibit C Utility Rates and Fees
Connection fees have been determined as a way to provide a fair and equitable recovery of the costs associated with providing
water and wastewater utility services to new customers to avoid placing these costs on existing customers. The connection fee
includes those portions of existing assets that will benefit new customers together with any anticipated future capital
improvements constructed for the purpose of providing utility services to new customers. The connection charge applies to
those properties not previously assessed for the associated utility project.
Connection to City Sewer in areas still within their assessment window (less than 15 years since project was assessed)
shall pay an amount equivalent to the assessment amount plus interest that residences were charged at the time of the
project:
MUNICIPAL CONNECTION PERMIT
SEWER PROJECTS
ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES
Connection to existing City Water Main $4,370 per unit
*or 20% over adjacent city's fee schedule, whichever is greater of
Connection to Wayzata Water System $2,351.00 or per current Wayzata
Fee Schedule
5/8" (3/4"x7-1/2") meter with horn including sales tax Actual Cost
3/4" (3/4"x9") meter with horn including sales tax Actual Cost
1" meter with horn including sales tax Actual Cost
Larger meter Actual Cost
CHARGES
CREDIT
UNIT CHARGE
Municipal Sewer Rate
By Unit:
1st $68.99 per month
2nd $60.98 per month
By flow ($68.99/month minimum):$7.66/1000 gallon plus
$6.00/month/SAC unit
Long Lake Service
Minimum Charge (10,000 Gallons or Less Water Usage)$68.99 per month
Over 10,000 Gallons Water Usage, per 1,000 Gallons additional $7.66/1000 gallon
Wayzata Service
Metered Service
Minimum Charge (10,000 Gallons or Less Water Usage)$68.99 per month
Over 10,000 Gallons Water Usage, per 1,000 Gallons additional $7.66/1000 gallon
Unmetered Service
Per Property $68.99 per month
Residential
WATER METER AND HORN
SEWER AND WATER UNIT ADJUSTMENT CHARGES
UTILITY SERVICE FEES
MUNICIPAL WATER RATES
Some Properties on Mytlewood and Old Long Lake Road are not connected to water. Wayzata bills Orono based on a
quarterly usage of 25,000 gallons. Charge is based on the metered rates and 25,000 gallons.
Charges shall result from either an intensification of an existing non-residential use or a new non-residential use that
replaces a former use on a property located within an area already assessed and served by municipal sewer and water.
Each sewer and each water unit adjustment charge shall be equal to the current Service Availability Charge established by
the Metropolitan Council Wastewater Services or its successor and shall be payable to the City of Orono upon application
for a building permit.
Credit for previously assessed sewer or water units shall be applied against the total number of sewer and water units
established for the new use.
Current Fee per Adjacent City
$1,900.00 or per current Long Lake
Fee Schedule
WATER CONNECTIONS
Fee
Connection to Long Lake Water System
Billing & Ready to Serve Charge $16.67/month
Unconnected Property Charge $16.67/month
Water Usage Rate
Navarre Area (Area #1) and Hwy 12 (Area #2)
Tier 1 (0-3,300 gal) $7.78/1000 gal
Tier 2 (3,300 - 8,300 gal) $10.89/1000 gal
Tier 3 (>8,300)$16.34/1000 gal
Chevy Chase Area (Area #3)
Tier 1 (0-5,000 gal) $7.78/1000 gal
Tier 2 (5,000-8,300 gal) $10.89/1000 gal
Tier 3 (>8,300)$16.34/1000 gal
Long Lake Area (Area #4)
Tier 1 (0-2,600 gal) $7.78/1000 gal
Tier 2 (2,600-7,300 gal) $10.89/1000 gal
Tier 3 (>7,300 gal)$16.34/1000 gal
Multi-Family
Billing & Ready to Serve Charge per SAC Unit $16.67/month
Unconnected Property Charge $16.67/month
Water Usage Rate
Tier 1 (0-8,300 gal) $7.78/1000 gal
Tier 2 (8,300-33,300 gal) $10.89/1000 gal
Tier 3 (>33,300 gal)$16.34/1000 gal
Commercial
Billing & Ready to Serve Charge per SAC Unit $16.67/month
Unconnected Property Charge $16.67/month
Water Usage Rate
Tier 1 (0-8,300 gal) $7.78/1000 gal
Tier 2 (8,300-33,300 gal) $10.89/1000 gal
Tier 3 (>33,300 gal)$16.34/1000 gal
School
Billing & Ready to Serve Charge per Meter $50.00/month
Unconnected Property Charge $50.00/month
Water Usage Rate
Tier 1 (0-8,300 gal) $7.78/1000 gal
Tier 2 (8,300-33,300 gal) $10.89/1000 gal
Tier 3 (>33,300 gal)$16.34/1000 gal
Federally Mandated Safe Drinking Water $2.43/quarter or $0.81/month
Testing Program (Charged per service connection)
Quarterly Service Charge for Non-Functioning or Inaccessible
Water Meter
$100.00
Bulk sale to Minnetonka Beach for Lafayette Ridge Area
Processing Fee (Per Monthly Billing Cycle)$25.00
Plus Water Usage Rate $7.78/1000 gal
Bulk sale - All Others
Processing Fee (Per Monthly Billing Cycle)$25.00
Plus Water Usage Rate $7.78/1000 gal
i.e. Fill swimming pool or watering sod.
Assessment Charge for Unpaid Accounts Certified $25.00
County Fee for Unpaid Accounts Certified $2.50
Water Turn-On $50.00
Water Turn-off $50.00
Water System Repair/Replacement if damage caused by property owner:
Labor - Current Hourly Rate
Parts - At Cost
One residential unit: $15.57/month or $46.71/quarter
Non-residential unit:Based on “Residential Equivalent Factor”
$5.76/month or $17.28/quarter
Recycling Cart from Waste Management No Charge
$100.00 per month
Right of Way Permit $50.00/permit
Right of Way Escrow (for other than Public Utility) $1,500
New Street Intersections (See zoning section - Special improvement fees)
On-Call Service to Other Cities
Base On-Call Fee $64.80/day 65.00/day
Call-Out Fee Actual wage and equipment rates
Water Meter Sales (See Building Permit Section)
RECYCLING CHARGE
SUMP PUMP SURCHARGE
STORM WATER UTILITY RATES
The basic intent of storm water regulations is to minimize the impact of development on natural drainage systems. Any
PUBLIC WORKS SUPPLIES & SERVICES
Penalty for late payment of sewer/water bills - 8% annually after 21 days from billing date 1% monthly if not paid by due
date (applied to the total unpaid balance). Interest at 8% on unpaid water/sewer bills certified.
Fee
Applicable Code or MN State
Statute (MSS) Number
Unsafe Operation 66-259
Unreasonable Acceleration $60.00 66-258
Exhibition Driving $60.00 66-7
Failure to Obey Traffic Control $60.00 169.06 MSS
Expired Registration $60.00 169.79 MSS
Unsafe Equipment $60.00 169.47 MSS
Loud Exhaust $60.00 169.69 MSS
No Driver License in Possession $60.00 171.08 MSS
Failure to Change Address on DL $60.00 171.11 MSS
Driving to Avoid Traffic Signal $60.00 66-5
Operation $60.00 66-159
Equipment $60.00 66-160
Hours of Operation $60.00 66-159
$60.00
Dog at Large $60.00 62-104
Animal License Required $60.00 62-131
Feces Clean Up $60.00 22-95 & 22-114
Barking Dog $60.00 62-10
$60.00
Public Nuisance/General Prohibition $60.00 70-4
Peace and Safety Violation $60.00 70-166
Discharge of Firearm $60.00 70-97
No Permit $60.00 58-186
Negligent Burning $60.00 58-193
No Open Burning $60.00 58-193
Loud Noise Prohibited $60.00 58-120
Hours of Operation $60.00 22-89
Operating a Motor Vehicle within Park $60.00 22-92
No Permit $60.00 22-102
Feces Clean Up $60.00 22-95, 22-102 & 22-114
$60.00
Violation of General Provisions $60.00 18-4
Sign Impoundment Fee $25.00 78-1473
$60.00
Curfew $60.00 70-274
Possession of Tobacco $60.00 609.685 Sub 3 MSS
1,000-9,999 lbs overweight .15 cents
per lb over
169.824 Sub 1 MSS
General $25.00 66-78
Seasonal 0200-0600 on $25.00 66-80
Street Prohibited
Handicapped $60.00 66-85
Fire Lane $25.00 46-85
Watering Restrictions $60.00 610.50 Sub 15 MSS
Placing Snow on Street $25.00 18-5
SPECIAL EVENT VIOLATIONS
1st Violation $250.00
2nd Violation $500.00
3rd Violation $1,000.00
SEASONAL OVERWEIGHT VEHICLES
PARKING
MISCELLANEOUS
ADMINISTRATIVE OFFENSES (POLICE ADMINISTERED)
PUBLIC NUISANCES
OPEN BURNING
NOISE
PARK VIOLATIONS
SIGNS VIOLATIONS
Exhibit D Administrative Offenses
TRAFFIC/VEHICLE OFFENSES
SNOWMOBILE VIOLATIONS
ANIMALS
JUVENILE
2021 Fee Proposed Fee
GOLF COURSE FEES - Effective Date: 2021 Season
MONDAY THRU SUNDAY RATES
Individual (Regular)$19.00 $18.00
Juniors (12 -18 years old)$12.00 $12.00
Seniors (60 years or older)$16.00 $16.00
Second Round $10.00 $10.00
Children under 12 golf free with an adult
SEASON PASS RATES (Unlimited Play)Base Resident
Individual Season Pass $570.00 $455.00
Junior Season Pass (12 - 18 years old)$320.00 $280.00
Senior Season Pass (60 years or older)$470.00 $350.00
Family Season Pass $610.00 $550.00
(Entire Family*)
GOLF CART RENTAL RATES
Motorized Cart Rental/Per Round $19.00 $19.00
Motorized Cart Rental/Per Rider/Per Round $10.00
Pull Carts/Per Round $5.00 $5.00
Golf Clubs/Per Round $5.00 $5.00
CONCESSION RATES As Posted As Posted
Resident $25.00 $25.00
Non-Resident $40.00 $40.00
Passes will go on sale for the following year on Nov 1st.
Passes to be prorated at 50% on August 1st.
SUMMIT BEACH
CANOE RACK RENTAL $40.00/slip $40.00/slip
BEDERWOOD & HACKBERRY SPORT FIELDS
PARK FACILITY USE PERMIT
Resident (Individual, business or group)$15.00 $15.00
Non-Resident (Individual, business or group)$25.00 $25.00
Exhibit E Park Fees
* Family meaning: Immediate family living in the same household. Children must be 18 years old or younger.
LURTON PARK PASSES
The golf course superintendent shall have the authority to deviate from these prices for the
purpose of promoting specials and for special events.
The cost to cover replacement passes will be $5.00
2021 Fee Proposed Fee
Sec. 62-104
1st Offense $60.00 $60.00
2nd Offense $80.00 $80.00
3rd Offense $100.00 $100.00
After Hours, Weekend & Holiday
Release Charge
$75.00 $75.00
Ch. 62, Article I
1st Offense $55.00 $55.00
2nd Offense $65.00 $65.00
3rd Offense $75.00 $75.00
Trace & Catch Animal $35.00 $35.00 Per Hour
Trailer Charge $55.00 $55.00
Actual Cost Actual Cost
$200.00 $200.00 + $60.00 each additional
day; actual costs up to
$1,500
Sec. 38-801 thru
38-803
Sec. 70-99
Sale and/or Storage of Consumer
Fireworks $100.00 $100.00
Ch. 70, Article III
Pest Control (limited use)$25.00 $25.00
Game Animals (limited use)$25.00 $25.00
Annual (Club Only)$25.00 $25.00
$20.00 $20.00 Sec. 70-71
$100.00 $100.00 Ch. 66, Article VI
Special Events involving fireworks $250.00 $250.00
Ch. 42, Article III
1st false alarm/per calendar year No Charge No Charge
2nd false alarm/per calendar year $50.00 $50.00
3rd false alarm/per calendar year $100.00 $100.00
4th false alarm/per calendar year $150.00 $150.00
5th and over false alarm/per calendar
year
$250.00 $250.00
Ch. 42, Article III
1st false alarm/calendar year No Charge No Charge
2nd false alarm/calendar year $75.00 $75.00
3rd false alarm/calendar year $250.00 $250.00
4th false alarm/calendar year $350.00 $350.00
Exhibit F Police Administration
DOGS AT LARGE - RELEASE FEE
CARE OF IMPOUNDED ANIMAL
LARGE ASSEMBLY LICENSE (over 300 people)
FIREWORKS PERMIT
ANIMALS AT LARGE (Other than dogs) - RELEASE FEE
+ 0.31/Mile (Total Distance)
FIREARMS DISCHARGE PERMIT
LIMITED TRAPPING PERMIT
SPECIAL EVENTS PERMIT
FALSE FIRE ALARM USER FEES
FALSE POLICE ALARM USER FEES
5th & over false alarm/calendar year $500.00 $500.00 Each Call
$25.00 $25.00 Per Application
Officer 119 Rate $120.00 $120.00 Per Hour
Police Reserve Officers $30.00 $30.00 Per Hour
First Two Copies $0.25 $0.25 Per Page
Additional Copies $0.25 $0.25 Each
More than 100 pages (actual costs)
PHOTOS $10.00 $10.00 On CD
VIDEO
Body Worn Cameras $50.00 New
Paper signs (no lath included)$1.00 $1.00
STATEMENTS $10.00 $10.00
$50.00 $50.00
For CD & (transcribed copy or CD when available;
subject to Data Privacy Act - will be charged an
actual hourly fee)
Per Gun (Police Policy 3056)FIREARM STORAGE FEES
POLICE SPECIAL SERVICES (3 Hours Minimum)
FINGERPRINTING SERVICE
SIGNS: "NO PARKING ORDER OF POLICE"
COPY SERVICE - Police Records
NON-RESIDENTS ONLY (Residents No Charge)
2010-2030 Comprehensive Plan $75.00
Municipal Code Book - complete
(Ch. 1-94 w/revisions)
Municipal Code Book - Portions
Ch 78 only (Zoning Code) w/revisions
Ch 82 only (Subdiv. Code) w/revisions
Other Individual Chapters
Binder $5.00
GIS and City Maps 8 1/2 x 11 11x17 17x22 22x34
Black & white $0.25 $1.00 $2.00 $4.00
Color $2.00 $4.00 $8.00 $16.00
City Street Number Maps $0.25 $2.00 $5.00
Building & Planning Publications
Listing Information $10.00
Assessment Search - Written
(Verbal searches not given)
Fax Charge
Copy Service (for public City records only)$ .25 Each
11" x 17" copies $ 1.00 Each
Individual copies of Ordinance Sections (1 copy)No Charge
Building Plan Copies
Labels from Utility Billing System
Electronic Labels
Information Provided on CD or 8GB USB Drive
Information Provided on DVD
Shipping/ Handling mailing of requested information
Professional Time
Clerical Time
Building/Legal/Engineering Consultants
Mileage/Copies/Postage/Etc.
Returned Check Charge $30.00
$ 30.00 Per Hour
Actual Billed Cost
Actual Cost
$ 10.00 Per CD/USB
$ 20.00 Per DVD
$ 3.00 + cost of information (DVD, pages, etc.)
Surcharge for Staff Expense in Excess of Regular Fees
$ 50.00 Per Hour
Reprint of Oversized Documents that have been
microfilmed
Cost of Copying, Messenger Service & Min.
Clerical Fee of $5.00 (Entire amount to be paid
upon request)
$ .05 Per Label (Approximately $150.00)
$10.00 Per sheet , 30 Labels max per sheet
Ex G Documents and Services
Cost of copying service,
ZONING DEPARTMENT DOCUMENTS
$60.00 With Binder
As Posted - Prices subject to Change
$25.00 loose
$15.00 loose
$ .25 Per Page
GENERAL ADMINISTRATIVE DOCUMENTS
$20.00 Per Parcel
No charge up to 6 pages; $.25 Each Additional
1
Orono Police Department
Memo
To: Finance Director Ron Olson
From: Police Chief Correy Farniok
Date November 17, 2021
Re: Addition to Fee Schedule
The police department implemented body worn cameras (BWC) in 2021. With the addition of the
BWC, there are requests for the videos captured on the BWC. The current fee schedule does not have
a cost associated with requests for BWC video. I recommend a fee of $50.00 for requests for copy of
BWC video be added to the 2022 fee schedule.
CITY OF ORONO MEMORANDUM
DATE: November 22, 2021
TO: Mayor Walsh, City Council
Adam Edwards, City Administrator
FROM: Jeremy Barnhart, AICP, Community Development Director
RE: Park Dedication
As part of the fee schedule annual review, staff has been reviewing park dedication. Thought the
methodology and fees were last reviewed in 2011, the fees have been static since 2001. Park
dedication was identified as needing further study when the Subdivision code was reviewed in
2020.
After review of the current park system, and anticipated growth based on the 2040
Comprehensive plan, staff proposes some changes to the park dedication methodology and
formula. In essence, the revised methodology is based on the premise that “Development pays
for itself.” Staff will go through the methodology at the workshop.
In summary, the current residential share of our park system is 0.10 acre per residential house
hold. The current Commercial/ Industrial share is 0.05 acres per C/I acre or 14 employees. Each
new Household (lot) should provide 0.10 acres of park dedication to maintain that level. Cash in
lieu of this land is that amount of land times the average predeveloped value of the property
being developed. A cap of park dedication is proposed, based on the density of the project.
The methodology recommended is based on no identified, specific needs for additional parks,
and limited trail additions. If the Council would like to incorporate these goals into the
methodology, a specific study should be completed to establish nexus of the additions (and
increased fee) to the proposed development.
These proposed changes will require an amendment to the subdivision code. Staff will initiate
that for January review by the Planning Commission.
Attachments
Establishing Park Dedication - League document
Park dedication methodology
Step 1 Current Level
Current Households US Census/ Met Council 3148
Current Park Acres 2040 Comprehensive Plan (T3B‐1) 274.7
Current Trail miles 2040 Comprehensive Plan (T3B‐1) 3.21
Current Employees 2040 Comprehensive Plan (T3B‐1) 1700
Percentage of HH developed to 2040 level 81%
Step 2 Anticipated Need
2040 Household 2040 Comprehensive Plan 3900 Households
Anticipated Park acres 124% of current level 340.32 Acres
Anticipated Trail miles 124% of current level 3.98 Miles
Step 3 Residential share 98.0%
Commercial Share 2.0%
Step 4 Residential/ Commercial share
Residential 98% of current Park acres 269.21 Acres
98% of current trail miles 3.15 Miles
Per Res HH share Park acres [sq feet] 0.09 3725.1
Trail miles [feet] 0.00100 5.27631
Commercial 2% of Park acres 5.49 Acres
2% of trail miles 0.06 Miles
Per C/I acre Park acres [sq feet] 0.05 1977.84
Trail miles [feet] 0.00 2.801455
There are 1700 employees in 121 acres, per Comp Plan table 3B‐2
Employees per C/I acre 14.05
Step 5 Park dedication, acres required
Residential Park per HH (acres) 0.1 0.09
Residential Trail per HH (feet) 0.000 5.28
Step 6 Commercial Park acres or every 14 employees 0.05
Commercial Trail feet or every 14 employees 2.8
98% of the non‐park land in Orono is
Residential, 2% is commercial, per the
Comprehensive Plan, Table 3B‐2
Step 7 Each new residential household shall provide 0.1 acres of land as a park dedication.
In lieu of land, the cash equivalent is the lower of either the product found by multiplying the
number of acres required times the average undeveloped value per acre, or 8% of the undeveloped
land value. Because higher density developments have less private open space for which to
recreate, and therefore have a greater impact on the public park system, projects with a density
greater than 10 units per acre shall be capped at 20% of the predevelopment land value.
Proposed Park dedication, commercial is 0.05 acres per 14 employees or 1 acre of C/I land
In lieu of land, the cash equivalent is the lower of either the product found by multiplying the
number of acres required times the average undeveloped value per acre, or 8% of the undeveloped
land value.