My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-10-2021 Regulated Backflow Assembly Test
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
09-10-2021 Regulated Backflow Assembly Test
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:47:54 PM
Creation date
1/13/2022 9:39:10 AM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REGULATED BACKFLOW ASSEMBLY (RBA) FORM/TEST REPORT <br /> Service Site Address <br /> 685 NORTH OLD CRYSTAL BAY RD, LONG LAKE, MN, 55356 <br /> Service Site Name <br /> ORONO INTERMEDIATE SCHOOL <br /> Work Order Number <br /> 272595 <br /> Contractor Name: Tester Name: <br /> Gilbert Mechanciki Contractors u Kenneth Thunder <br /> Contractor Address: Tester Certification #: <br /> 5251 W 74th Street, Edina, MN 55439 BF066234/ASSE 31412 <br /> Contractor License #: Test Equipment Manufacturer: <br /> 058808-PM WATTS <br /> Contractor Phone #: Test Equipment Model #: <br /> 952-835-3810 TK-9A <br /> Test Equipment Serial #: <br /> 853818 <br /> Testing Equipment Calibration Date: <br /> 05/10/2021 <br /> Backflow Assembly Detail Information (Check One:) <br /> Edi Double Check Detector Fire Protection <br /> Type of Work (Check One) <br /> Eli Test <br /> Manufacturer: System Serviced: <br /> Ames Fire supression <br /> Model # Location in Bldg <br /> 2000 SS Maintenence shop in Mechanical room <br /> Serial # Floor# <br /> 78106 1st <br /> Size (Inches) Room # <br /> 4" mechanical room <br /> REGULATED BACKFLOW ASSEMBLY (RBA) FORM/TEST REPORT cont. <br /> Reduced Pressure Principal or Reduced Pressure Detector Fire Protection (RP)-TEST RESULTS <br /> Check Valve #2 (Closed Tight) Shutoff Valve #2 (Closed Tight) Check Valve #1 <br /> Initial Test <br /> Final Test ®Yes <br />
The URL can be used to link to this page
Your browser does not support the video tag.