HomeMy WebLinkAbout#3159 - sewer units � ►
� O�
O O
- �b_ - CITY of ORONO
� � �
ti
�� G'�' RESOLUTION OF THE CITY COUNCIL
�9kESH�g'� NO. 315 9
A RESOLIITION DETERMINING THAT THE PROPERTY AT
3382 SAYSIDE ROAD SHALL BE ASSIGNED ONE SEWER IINIT
AS PART OF THE STIIBBS BAY SEWER PROJECT
WHEREAS, the City of Orono is a municipal corporation
organized and existing under the laws of the State of Minnesota;
and
WHEREAS, the Stubbs Bay Sewer Project was initiated by
the City to solve existing on-site sewage treatment problems in
the Stubbs Bay area, within which the property at 3382 Bayside
Road is located; and
WHEREAS, the property at 3382 Bayside Road is located
in the LR-lA zoning district and consists of five individual
commonly-owned adjacent tax parcels identified by PINS numbers
05-117-23 14 0033, 05-117-23 14 0034, 05-117-23 14 0035, 05-117-
23 14 0036, and 05-117-23 14 0037, also known as Lots 7, 8, 9, 10
and 11, Block 5, Bayside Addition to Lake Minnetonka; and
WHEREAS, these five referenced tax parcels in total
contain an area of approximately 0.92 acres, less than the 2.0
acres required in the LR-lA zoning district for a single building
site; and
WHEREAS, the five parcels as a group have long been
used and are currently considered by the City of Orono as a
single building site; and
WHEREAS, the existing residence is located primarily on
PIN number 05-117-23 14 0035.
NOW, THEREFORE, BE IT RESOLVED by the City Counci 1 of
the City of Orono, Minnesota that one sewer unit will be assessed
and one sewer stub provided for this group of five parcels, said
sewer unit assessment to be levied against parcel 05-117-23 14
0035.
Page 1 of 2
.- ♦ « •
� O�
O O
�e-.- CITY of ORONO
� �
�
�� �,'�' RESOLUTION OF THE CITY COUNCIL
��kESH��'� Np, 315 9
Adopted by the City Council of the City of Orono,
Minnesota on this lOth day of August, 1992.
ATTEST:
Dorothy Hallin, City Clerk Barbara A. Peterson, Mayor
STATE OF MINNESOTA )
) ss.
COUNTY OF HENNEPIN )
The foregoing instrument was acknowledged before me on
this lOth day of August, 1992, by Barbara A. Peterson & Dorothy
M. Hallin, Mayor & City Clerk of the City of Orono, a Minnesota
municipal corporation and said instrument was executed on behalf
of the City.
CqppLE A. HASEMAN
�p7�py p�gUG-M�INESOTA N o t a P u b 1 i c
HENNEPIN COUNTY
MY CAMMISSION EXPIRES 0•�23����
�--� Page 2 of 2
� 1
//::_O _�,\\
� �\
� �`�\
i; � �, 0 ��
I!, ,�a,�r��,: _ �Ip CITY of ORONO
� �S� � �f ` :� � i Municipal O�ces
\ `�+, �, '�,y: 8�' , -i, �/ Post Qfffce Box 66 —
\ �� � �'�.,'�,.�- � r.t�:'�G��� Crystal Bay,Dtinnesota 55323-0066
���, i
�kESIiO�
August 26 , 1992
Mrs . A. L. Addason
� 3382 Bayside ,�oad
Long Lake, Minnesota 55356
Dear Mrs . Addison:
The City Council at its August 10, 1992 meeting adopted Resolution No.
3159 determining that your residence property shall be assigned one
sewer unit as part of the Stubbs Bay Sewer Project. Specific
resolutions were adopted for each property in the project area which
consisted of two or more tax parcels.
A copy of the resolution is attached. Please feel free to contact me
at 473-7357 if you have any questions .
Sincerely,
�//�f, � �
�
Michael P. Ga fron
Asst. Planning & Zoning Administrator
MPG/ch
Enc.
TELEPHONE-473-7357 • EAX-473-0510