Laserfiche WebLink
� o� <br /> o ;, o <br /> ' =��b��T � CITY of ORONO <br /> � 3��r.�y � <br /> r�1 ��°� ,� ::� <br /> �, �i,J �,f, � Municipal Offices <br /> �'',� �a;�uu,�'�-�.: ��r G <br /> � '�`,'�`���. -��� � Street Address: Mailing Address: <br /> � ���i��,�rtir �� <br /> 1fEgg0 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> Owner: �OJ1Q�d S�ie �dan Address: 3225 Bayside Rd. <br /> Permit #'s: 8295 Dates: 1/14/86 Contractors: Ritter Exc. <br /> (This is [xl an existing system [ ] new construction) . <br /> E COMPLIANCE (1-3) : 1 <br /> 1 Code System: Meets or exceeds current City standards in all respects relating to design, <br /> construction, and location. Appears to be operating properly. <br /> 2 �'ompl;ant System: Does not meet all current City standards for new construction, but in <br /> most respects appears to be designed, located, and constructed in accordance with previous <br /> codes and is functioning properly. <br /> 3 Non-Com8liant Sy�tem: System may or may not meet current City standards for design, <br /> construction, or location, but is failing to properly treat and dispose of the current <br /> input; and any system with less than three feet of vertical separation between the bottom of <br /> the drainfield and the saturated soil level. <br /> (The saturated soil level [�.] has or [ ] has not been identified at this time. If the <br /> saturated soil level has not been identified, this classification is subject to revision.) <br /> TANK CONDITION (5-9) : 6 <br /> Pumpout not needed at this time. <br /> � Solids accumulation in tanks indicates they should be pumped out this year. <br /> 7 System is discharging to the surface. Tanks must be pumped out within 48 hours. <br /> 8 Inspection risers missing-tanks could not be inspected. If tanks have not been pumped out <br /> within three years, they should be pumped out and risers installed now. <br /> 9 Inspection pipe is located over tank baffle-can not measure solids accumulation. If tanks <br /> have not been pumped out within three years, they should be pumped out now. <br /> (During the last septic tank Maintenance Pumpout the tanks [ ] were or [ � were not confirmed <br /> to be watertight by the licensed pumping contractor. If the tanks were not confirmed to be <br /> watertight, this classification is subject to revision.) <br /> N D IT 1 - 11 <br /> 1 Drainfield is dry, no surfacing evident. <br /> 2 Some evidence of surfacing, not critical yet. Repair is not required at this time. <br /> 13 Drainfield is saturated and visibly discharging untreated effluent to the surface. Contact <br /> the City Inspector immediately. Repair must be completed within 90 days. <br /> 14 Drainfield extent and condition unknown. <br /> pnTF*TTIAL FOR SYSTEM FAILURE• (system age and condition soils etc.) : low <br /> COMMENTS: Your 5 year deadline to connect to municipal sewer is approaching. Connection to the <br /> sewer must be made by 3/24/98. <br /> ��-��-�I <br /> Date of Inspection Sep c System Inspector <br /> Note: In the event that this inspection report is used to satisfy the requirements for a <br /> transfer of property, this report does not guarantee that an existing system will continue to <br /> function properly, but indicates the operation of the system under current conditions. <br /> Telephone (612) 473-7357 � FAX 473-0510 <br />